§ 31-54 — Inspections, monitoring, entry, and confidentiality
Code of Ordinances, City of Chattanooga, Tennessee (Supp. No. 40: codified through Ordinance No. 14374, enacted June 16, 2026) · Chattanooga City Code § 31-54
Corpus is an independent public-information project, not the official City of Chattanooga website. Stable reference: corpuslaw.us/code/df8fca84-1af9-4e0c-9adc-bcd8d3d98c04
Sec. 31-54. - Inspections, monitoring, entry, and confidentiality.
(a) Whenever required to carry out the objective of this article, including but not limited to: 1) developing or assisting in the development of any effluent limitation, or other limitation, prohibition, or effluent standard, pretreatment standard, standard of performance, or permit condition under this article; 2) determining whether any person is in violation of any such effluent limitation, or other limitation, prohibition or effluent standard, pretreatment standard, standard of performance, or permit condition; 3) any requirement established under this section: ..... (1) The director shall require any industrial user to: ..... A) Establish and maintain such record; ..... B) Make such reports; ..... C) Install, use, and maintain such monitoring equipment or methods, including where appropriate, biological monitoring methods; ..... D) Sample such effluents in accordance with such methods, at such locations, at such intervals, and in such manner as the director shall prescribe; and ..... E) Provide such other information as he may reasonably require. ..... (2) The director or his authorized representative, upon presentation of his credentials: ..... A) Shall have a right of entry to, upon, or through any user's premises in which an effluent source is located or in which any records required to be maintained under this subsection are located, and ..... B) May at reasonable times have access to and copy any records, inspect any monitoring equipment or method required under clause (a)(1), and sample any effluents which the owner or operator of such source is required to sample under such clause. ..... (b) Any records, reports, or information obtained under this section 1) shall, in the case of effluent data, be related to any applicable effluent limitations, toxic, pretreatment, or permit condition, and 2) shall be available to the public to the extent provided by 40 CFR Part 2.302 except that upon a showing satisfactory to the director by any person that records, reports, or information, or particular part thereof (other than effluent data), to which the director has access under this section, if made public would divulge methods or processes entitled to protection as trade secrets of such person, the director shall consider such record, report, or information, or particular portion thereof confidential in accordance with the purposes of this article, except that such record, report or information may be disclosed to officers, employee, or authorized representatives of the State of Tennessee or the United States concerning with carrying out the provisions of the Clean Water Act or when relevant in any proceeding under this article or other applicable laws. ..... (c) Specific requirements under the provisions of paragraph (a)(1) of this section shall be established by the director, or the board as applicable, for each industrial user and such requirements shall be included as a condition of the industrial user's wastewater discharge permit. The nature of degree of any requirement under this provision shall depend upon the nature of the user's discharge, the impact of the discharge on the POTW, the volume of water discharged, and the technical feasibility of an economic reasonableness of any such requirement imposed. ..... (d) The industrial user shall be required to design any necessary facility, and to submit according to the permit compliance schedule, an engineering report, including detailed design plans and operating procedures to the director for review in accordance with accepted engineering practices. The director shall review said plans and other documents within 45 days and shall recommend to the industrial user any change he deems appropriate. ..... (e) Upon approval of plans and other documents as specified in paragraph (d) of this section, the industrial user shall secure such building, electrical, plumbing or other permits as may be required by this code and proceed to construct any necessary facility and establish such operating procedures as are required within the time provided in the industrial user's wastewater discharge permit. ..... (f) All significant industrial users shall install a monitoring station of a standard design or be designed in a manner that is satisfactory to the director. Monitoring stations and flow measurement facilities must be properly operated, kept clean, safely accessible and maintained in good working order at all times. The monitoring stations shall not contain noxious or malodorous gases/odors in concentrations that could create a public nuisance or a health and safety concern, or to prevent entry into the monitoring stations. The failure of a user to keep its monitoring station in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge. ..... (g) In the event any industrial user denies the director or his authorized representative the right of entry, to or upon the user's premises, for purposes of inspection, sampling effluents, inspecting and copying records, or verifying that a user is not discharging industrial wastes and is not subject to section 31-51, or performing such other duties as shall be imposed upon him by this article, the director shall seek a warrant or use such other legal procedures as shall be advisable and reasonably necessary to discharge his duties under this section. ..... (h) Any industrial user failing or refusing to discharge any duty imposed upon him under the provisions of this section, or who denies the director or his authorized representative the right to enter upon the industrial user's premises for purposes of inspection, sampling effluents, inspecting and copying records, or such other duties as may be imposed upon him by this section, shall be deemed to have violated the conditions of his wastewater discharge permit and such permit shall be subject to modification, suspension, or revocation under the procedures established in this article. A user who does not have an industrial waste discharge permit and denies the director or his authorized representative the right to inspect as described in section 31-9 or 31-54(g) is subject to having the sewer service in question terminated by the director. .....
(Ord. No. 9409, § 2, 6-5-90; Ord. No. 12428, § 5, 8-31-10; Ord. No. 12962, § 4, 6-16-15; Ord. No. 13172, § 8, 4-18-17)
Ask a question about Chattanooga law
Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.
