For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 32-64 — Application fee

Code of Ordinances, City of Chattanooga, Tennessee (Supp. No. 40: codified through Ordinance No. 14374, enacted June 16, 2026) · Chattanooga City Code § 32-64

Corpus is an independent public-information project, not the official City of Chattanooga website. Stable reference: corpuslaw.us/code/e595ea59-0e65-4179-ab1e-97f779498219

Sec. 32-64. - Application fee.

Each application shall be accompanied by a fee as follows: (a) A permit fee of Three Hundred Dollars ($300.00) for all permits shall apply to no more than one cut or Work of the following type: ..... (1) Transverse cut in the roadway pavement; ..... (2) Longitudinal cut in the roadway pavement of up to three hundred (300) feet in length; ..... (3) Within an intersection; ..... (4) Concrete curb or concrete gutter; or ..... (5) Concrete sidewalk; ..... (6) Microtrench within right-of-way; ..... (7) Installation of additional lane(s) and/or concrete curb and gutter against existing roadway; ..... (8) Jack and bore beneath City street. ..... (b) In addition to the fixed permit fee for all permits, applicants are responsible for additional fees as follows: ..... (1) One Hundred Dollars ($100.00) each for each additional transverse roadway cut in a roadway segment ..... (2) One Hundred Dollars ($100.00) each for each additional cut in the concrete sidewalk or concrete curb or gutter; and in a block segment; and ..... (3) One dollar ($1.00) for each additional foot of longitudinal cut in the roadway pavement beyond three hundred (300) feet. ..... (c) Planned cuts into the street shall be coordinated with the City's annual resurfacing work, a schedule of which is available online at the Public Works website or by calling the Transportation Division. For non-emergency street cuts, a recovery fee of 30% of the topping material cost to restore the asphalt street segment impacted by street cut shall be assessed to cuts within streets resurfaced within the previous three (3) years based on the following calculation: ..... (1) Impact areas, sq.ft. = (Street segment length, ft) x (Total width of lanes impacted by street cut, ft) ..... (2) Impact area, sq.yd = (Impact area, sq.ft) x (1/9) ..... (3) Asphalt needed for impact area, tons = [(Impact area, sq.yd.) x 165] / 2000 ..... (4) Total Cost Segment Resurfacing = (Current City contract price for topping, $/ton) x (Asphalt needed for impact area, tons) ..... (5) Recovery Fee amount = 0.30* Total Cost Segment Resurfacing ..... (d) Written notification of intent to work in a right-of-way must be received at least forty-eight (48) hours prior to beginning work, even if a permit is not required, except in emergencies. E-mail is considered a written notice. All applicants for any permits which require street or sidewalk closure should be submitted with enough written notice to comply with road closure policies administered by the Transportation Division. ..... (e) Additionally, work zone permits are required for Work that limits public access to the full right-of-way, such as those requiring closure of a street, open public alley, or sidewalk or the temporary use of a curb-side parking space. Additional work zone permit fees may apply based on impact to the general public. Time is of the essence in completion of the work to restore the right-of-way. Where such work within the right-of-way is required, such that it blocks a lane of traffic, open public alley or sidewalk, for more than one week, then a fee of $100 per day for each lane of traffic, or sidewalk, will be assessed for the work zone permit. The fee is not a penalty, but considered damages suffered by the City for each day of delay in the restoration of the right-of-way. Fees for lengthy projects may be reviewed at the discretion of the City Transportation Engineer. ..... Traffic control plans in compliance with the MUTCD may be submitted to the City with the application for the work zone permit. If a compliant traffic control plan is not included with the application, a fee of $150 will be assessed for the work zone permit for the City to draw and provide the necessary traffic control plan. The City reserves the right to deny the work zone permit without an included traffic control plan at its discretion. (f) Permits for relocation or installation of fire hydrants will be required when requested by the City, but no fee (including administrative fees) will be required. ..... (g) No more than five (5) multiple cuts, each not exceeding twenty-five (25) square feet in area, when required in a single block or within a work zone distance of two hundred fifty (250) feet as part of a single project, are considered as one (1) cut. Permit and fee will be required for a single cut under these conditions. Pavement restoration extents shall be completed as shown on the published City Standard Drawings available on the Public Works website. If the cut exceeds two hundred fifty (250) feet, or multiple cuts within a block or a work zone greater than two hundred fifty (250) feet, or the number of cuts within two hundred fifty (250) exceeds five (5), then all lanes that are disturbed by construction shall be repaved from intersection to intersection. ..... (1) Cuts within any intersection of a City street requires repavement of the entire intersection including marked crosswalks. For stamped or concrete crosswalks, replacement of the crosswalk is not required unless the cut includes the pavement of the crosswalk itself. ..... (2) Any cut that includes a concrete ADA curb ramp requires full replacement of the ramp in compliance with current laws and codes. ..... (h) Neither permits nor fees will be required when work in the right-of-way is conducted as part of a City street improvement project, including resurfacing, where the utility is required to move their facilities as a result of the City project. ..... (i) Except as otherwise stated in this Chapter, fees shall not be waived under any other conditions. ..... (j) When it is determined that non-emergency work in the City right-of-way has proceeded without the purchase of a permit, the contractor or utility shall immediately purchase a street cut permit, and the fee for the permit shall be double the standard fee; and, no further permits shall be issued to the contractor or utility until such time as the improper work is removed and replaced in accordance with this Code. ..... (k) Where work in the City right-of-way is self-performed by one (1) of the following entities, or by one (1) of the entity's approved contractors, the fee for each permit shall be invoiced monthly: ..... (1) Electric Power Board of Chattanooga; ..... (2) Tennessee-American Water Company; ..... (3) Chattanooga Gas Company; ..... (4) AT&T; ..... (5) Comcast Cable Company; ..... (6) Hixson Utility District; and ..... (7) Eastside Utility District. ..... (l) Fees set forth within this Section may be revised by the City in connection with the annual budget adopted each fiscal year. .....

(Ord. No. 12337, 1-5-10; Ord. No. 12824, § 1, 3-25-14; Ord. No. 13267, § 3, 1-30-18; Ord. No. 14092, § 1, 3-12-24)

Ask a question about Chattanooga law

Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.