§ 32-67 — Manner of excavating street
Code of Ordinances, City of Chattanooga, Tennessee (Supp. No. 40: codified through Ordinance No. 14374, enacted June 16, 2026) · Chattanooga City Code § 32-67
Corpus is an independent public-information project, not the official City of Chattanooga website. Stable reference: corpuslaw.us/code/ef416cfb-fe84-437b-8ff9-775e2e44f662
Sec. 32-67. - Manner of excavating street.
(a) The street cut permit number provided by the City with an approved street cut permit shall be marked and maintained at each street cut site in white marking paint or sign posting adjacent to the limits of the street cut so that inspectors can readily identify the permit number when arriving on site for inspections. ..... (b) In excavating any street, all material for paving or ballasting must be removed with the least possible injury or loss of the same, and together with the excavated materials from the trenches, must be placed where they will cause the least possible inconvenience to the public. All pavement where trench excavations are to be made shall be saw cut. All edges shall be made clean and square. No other method of demolition is acceptable. ..... (c) The permittee shall carry on the Work as authorized by the permit in such manner as to cause a minimum interference with traffic. The permittee shall provide adequate warning signs and devices to warn and guide traffic, and shall place the signs and warning devices in a position of maximum effectiveness. The latest editions of the Manual on Uniform Traffic Control Devices, copies of which are on file in the Transportation Division Office, and are generally available online, may be used as a guideline for proper positioning of signs and devices. ..... (d) Any steel plate(s) placed within lanes of traffic shall be clearly labeled with the name of the owner of the plate and a 24-emergency contact phone number and shall respond to the site within 2 hours of notification from a City official. ..... (e) On main thoroughfares and in congested districts, sufficient traffic lanes shall be kept open at all times to permit substantially normal traffic flow. However, if this requirement is not possible, then Work shall be done only during the period between 9:00 a.m. and 4:00 p.m. or between 7:00 p.m. and 6:00 a.m., as the Transportation Division may designate. ..... (f) For backfill in roadway areas; ..... (1) No material excavated from the streetcut shall be returned to the trench. ..... (2) The contractor shall provide six (6) inches of graded aggregate base above the utility's main line top of pipe. ..... (3) From top of graded aggregate base backfill to within four (4) feet of the street surface, the contractor shall provide fine aggregate (crushed limestone dust no larger than one-sixteenth (1/16) inch.) Each eight (8) inch lift of the fine aggregate base shall be moistened and compacted by means of a mechanical tamp. Flowable fill that meets the specifications below may be used in lieu of fine aggregate. ..... (4) The contractor shall complete the backfill up to the bottom of the paving with flowable fill with a compressive strength of two hundred (200) to two hundred fifty (250) psi in forty-eight (48) hours. ..... (5) Flowable fill shall be placed a minimum of forty-eight (48) hours prior to the placing of the asphalt or concrete topping. ..... (6) Steel plate(s) shall be pinned in place in the roadway and shall not stay in the roadway longer than 5 days from the placement of the flowable fill. ..... (7) Flowable fill surface shall not be exposed to traffic following removal of steel plate(s). If final resurfacing work of the street cut cannot be immediately executed following removal of the steel plate, an interim asphalt material (hot mix asphalt or cold patch mix) shall be placed neatly and cleanly on top of the flowable fill until final milling and resurfacing can be performed. This interim measure is allowed to remain in place no longer than 90 days from placement of flowable fill. ..... (8) Where it is impractical to use flowable fill because of terrain, slope, width of trench, or other situations, the material for the backfill in the roadway areas may be approved for cement treated aggregate base, placed in eight (8) inch thick layers, at the sole discretion of the Division of Transportation. Each eight (8) inch layer of backfill shall be thoroughly compacted by means of a mechanical tamp. ..... (g) Backfill for trenches within the sidewalk areas shall be compacted graded aggregate base instead of loose washed stone. Each eight (8) inch layer of graded aggregate base shall be thoroughly compacted by means of mechanical tamp. ..... (h) Any perpendicular cut in a roadway must be repaved no less than the full width of the travel lane(s) to the existing longitudinal joint that it cuts, and a minimum of ten (10) feet on each side of the centerline of the excavation. Any longitudinal cut must be repaved no less than the full width of the travel lane(s) that it cuts extended no less than ten (10) feet beyond the beginning and end of the cuts being made. ..... (i) The proposed restoration plan shall require that permanent repairs or restoration of street cuts shall be made to match existing surfaces. ..... (j) Surface elevation of the permanent repair shall not vary more than one-quarter (¼) inch for asphalt roadways or one-eighth (⅛) inch for concrete roadways when checked with a straight edge ten (10) feet long to ensure smooth surface across street cut restoration and existing roadway surface. .....
(Ord. No. 12337, 1-5-10; Ord. No. 12391, 4-27-10; Ord. No. 12823, § 1, 3-25-14; Ord. No. 12824, § 1, 3-25-14; Ord. No. 13267, § 3, 1-30-18; Ord. No. 14092, § 1, 3-12-24)
Ask a question about Chattanooga law
Corpus searches the Chattanooga sections it holds and shows the ones that match, with their citations. Free, no sign-in.