§ 4-8 — Installation permit and certificate of operation
Code of Ordinances, City of Chattanooga, Tennessee (Supp. No. 40: codified through Ordinance No. 14374, enacted June 16, 2026) · Chattanooga City Code § 4-8
Corpus is an independent public-information project, not the official City of Chattanooga website. Stable reference: corpuslaw.us/code/404120a6-3e1e-4e0f-a9c3-0d3b16dfa90f
Sec. 4-8. - Installation permit and certificate of operation.
(a) Installation permit. (1) No person shall cause or allow the construction, installation, or beginning any modification, alteration or reconstruction of any fuel-burning, refuse-burning, process or air pollution control equipment or any other source, as defined in section 4-2, until a complete application, together with plans and specifications applicable to the work on the equipment and structures or buildings used in connection therewith, has been filed by the person or his agent in the office of, and has been approved by, the director and an installation permit has been issued for such construction, installation or alteration. a. For the purposes of subsection 4-8(a), any activities listed in subsection 4-56(c)(11) due to de minimis emissions level are deemed to be insignificant activities that are not subject to the requirement to obtain an installation permit. Any activities listed in subsection 4-56(c)(12) due to size or production rate are also deemed to be insignificant activities not subject to the requirement to obtain an installation permit. These de minimis activities exemptions from permit application requirements shall not be used to avoid any emission limitations, standards, prohibitions or other requirements of Chapter 4; nor shall they be used to lower the "potential to emit," as defined in section 4-53, below "major source" thresholds, as defined in section 4-53. (2) The plans and specifications, submitted pursuant to paragraph (a)(1) of this section, shall show the form and dimensions of the process, fuel burning, refuse burning, air pollution control or other equipment, together with the description and dimensions of the building or part thereof in which such process, fuel-burning, refuse-burning, air pollution control or other equipment is to be located; identification and description of compliance monitoring devices or activities; the character of the fuel to be used; the maximum quantity of such fuel to be burned per hour; the kind and amount of raw or basic materials processed; the expected air pollutant emission rate; production rates and the operating requirements, including operating schedules; air pollutant concentration; air pollutant concentration; gas volume and gas temperature at each emission point; the location and elevation of each emission point relative to nearby structures and window openings; a flow diagram showing the equipment under consideration and its relationship to other processes, if any, and a general description of these processes; and any other reasonable and pertinent information that may be required by the director. The plans and specifications shall show that the room or premises in which fuel-burning, refuse-burning or process equipment is to be located is provided with adequate ventilation to provide sufficient air for the proper operation of the equipment. (3) Maintenance or repair or physical transfer of any installed equipment within the premises of the original installation which does not change the capacity of such process or control equipment and which does not involve any change in the method of processing or increase the amount or alter the characteristics of the emission of air pollutants therefrom may be made without an installation permit. The physical transfer of any installed equipment to a location other than within the premises of the original installation shall cause said equipment to be reclassified as new equipment. (4) The requirement for filing plans and specifications involving the installation, erection, construction, reconstruction, modification, alteration, or repair of, or addition to, any source, including any fuel- or refuse-burning equipment or process equipment or the building of a pilot plant or process, to be used in or to become part of a confidential formula, process or method used in any manufacturing operation is subject to section 4-19, upon the filing with the director of a written request for confidentiality by an owner or operator for such formula, equipment, method or process. Provided, however, that the type and emission rate of each air pollutant shall in no event be deemed to be confidential information subject to the protection of the provisions of this paragraph and must be disclosed under all circumstances; and provided further that the person claiming the protection of this paragraph shall institute and conduct a self-monitoring system and shall report the results thereof when and as required by the director. The confidentiality of such formula, equipment, method or process shall in no way relieve the person or persons responsible for the confidential formula, equipment, method or process from complying with all other provisions of this chapter. (5) No construction, installation, modification, alteration or reconstruction shall be made which is not in accordance with the plans, specifications, and other pertinent information upon which the installation permit was issued unless prior written approval of the director is obtained. (6) Violation of the installation permit shall be sufficient cause for the director to stop all work, and the director is hereby authorized to seal the installation. No further work shall be done until the director is assured that the condition in question will be corrected and that the work will proceed in accordance with the installation permit. (7) Failure to obtain installation permit. If work which requires an installation permit is begun without having obtained an installation permit, or if work is performed other than in accordance with the plans and specifications filed with and approved by the director to obtain the installation permit, the director may grant such permit; provided, however, that the installation permit fee is doubled in all such cases. If work upon equipment which requires an installation permit under this chapter is begun without having obtained such permit, or if faulty work has been performed, the director may grant such permit, conditioned upon the removal of all faulty work; provided, however, that this provision shall not be construed as authorizing such violation. (8) If the work authorized under the installation permit is not commenced and continued within one (1) year after the date of issuance of the installation permit, the permit shall become void and all fees shall be forfeited, unless an extension of time is warranted and granted by the director. An installation permit shall be valid for twelve (12) months after the date of its issuance. An extension of time may be granted by the director to a source that notifies the director, in writing not later than thirty (30) days before expiration of its installation permit, of the request for an extension, the reason for extension, and the duration of the requested extension. (9) Emergency repair. An emergency repair other than as specified in paragraph (a)(3) of this section may be made prior to the application for an installation permit if serious consequences may result if the repair were deferred. When such repair is made, the owner or operator concerned shall notify the director on the first business day after the emergency commenced and file an application for an installation permit if such permit is otherwise required by this chapter. (10) Upon review of the required plans and specifications, an application shall be approved or rejected within a reasonable time after it is filed in the office of the director. Upon the approval of the application and upon the payment of the prescribed fees, the director shall issue an installation permit. Issuance of an installation permit will not be construed to indicate compliance with the requirements of the building code of this municipality or any other requirement of this municipality or of the air pollution control ordinance of this municipality. (11) An installation permit is not transferable from one (1) person to another person, nor from one (1) air pollutant source to another air pollutant source, nor from one (1) location to another location. An application for an installation permit by the new owner or operator of the new air pollutant source, or by the owner or operator of the air pollutant source at the new location, shall be required as if there had been no previous permit issued. An existing source would retain its status as an existing source. The permits contemplated by this section shall be for the control of air pollutants. This section shall apply to fuel-burning equipment, refuse-burning equipment, process equipment which causes air emissions, or any other source or equipment that has the potential to emit air pollutants and to air pollution control equipment, but nothing contained herein shall require application for, or issuance of, a permit for any overall manufacturing process provided permits are applied for, and obtained, for the foregoing items of equipment in the overall process. [New: T.A.R. 1200-3-9-.03(6)] (12) The director shall reject any application for an installation permit and shall require resubmission of an application and further tests or information if: a. The proposed construction, installation or modification, alteration or reconstruction or the anticipated emission of air pollutants does not meet the provisions of this chapter; or b. The proposed emission control equipment is of a type reasonably anticipated by the director, based upon tests or other available evidence, not to be adequate for its intended usage; or c. The proposed construction, installation or modification, alteration, or reconstruction will interfere with the attainment or maintenance of an ambient air quality standard contained in Section 4-41, Rule 21. (13) The director or a designated representative shall have the right to enter the premises and inspect the installation in progress at any reasonable time. For the purposes of this paragraph, "any reasonable time" shall mean any time construction or installation activity is being conducted at the source. [Formerly Section 4-8(a)(15)] (14) The following fee schedules shall apply to the issuance of all installation permits. The fees in these schedules may be adjusted each year, if necessary as determined by the Board, by up to the percentage, if any, by which the Consumer Price Index for All Urban Consumers (CPI-U) for the most recent completed calendar year exceeds the CPI-U for calendar year 2025. The CPI-U is compiled by the Bureau of Labor Statistics of the U.S. Department of Labor. The Board may review these fees annually to determine if they continue to meet the financial requirements of the Bureau to fulfill the activities allowed to be funded by these fees. A source shall be required to pay the required fee prior to issuance of an installation permit to that source. Said fees shall be collected by the Bureau and remitted to the City of Chattanooga finance officer as fiscal agent for the Board who shall accumulate such fees in an account dedicated to the Board for air pollution control activities. INSTALLATION PERMITS SCHEDULE 4-8-A-I. FUEL-BURNING EQUIPMENT Fees shall be assessed based upon the design fuel burning rate per unit as expressed in millions of British thermal units (Btu) per hour, using gross heating values of the fuel. Fuel Burning Rate (Million Btu per Hour) | Fee 0.5 to 4.99 | $660.00 5 to 14.99 | 780.00 15 to 99.99 | 900.00 100 or greater | 1,200.00 SCHEDULE 4-8-A-II. INCINERATORS Fees shall be assessed based upon the design input incineration rate as expressed in pounds per hour. Incineration Rate (Pounds per Hour) | Fee Up to 200 | $125.00 200 to 599 | 250.00 600 to 999 | 365.00 1,000 to 1,999 | 480.00 2,000 to 4,999 | 6000.00 5,000 to 9,999 | 660.00 10,000 or greater | 720.00 SCHEDULE 4-8-A-III. PROCESS EQUIPMENT Fees shall be assessed based upon the design input process weight per hour as expressed in pounds per hour. Process Weight (Pounds per Hour) | Fee Up to 999 | $250.00 1,000 to 9,999 | 425.00 10,000 to 49,999 | 600.00 50,000 to 149,999 | 780.00 150,000 to 499,999 | 960.00 500,000 to 999,999 | 1,140.00 1,000,000 or greater | 1,200.00 (NOTE: Examples of this type of equipment include: chemical processing equipment; crushing, grinding or milling equipment; and metal forming equipment.) SCHEDULE 4-8-A-IV. ODOR PRODUCING EQUIPMENT Each unit shall be assessed a fee of four hundred eighty dollars ($480.00). (NOTE: Examples of this type of equipment include: tar and asphalt kettles, varnish and paint heating kettles, and rendering kettles.) SCHEDULE 4-8-A-V. MISCELLANEOUS Any article, machine, equipment or other contrivance which is not included in the preceding schedules shall be assessed a fee of four hundred eighty dollars ($480.00) per unit. (b) (Reserved) (c) Certificate of Operation. (1) No person shall cause, suffer, allow or permit the operation of any new or modified, altered, or reconstructed fuel-burning, refuse-burning, process, or air pollution control equipment, or any equipment pertaining thereto, or any other source as defined in section 4-2 for which an installation permit was required or was issued until a certificate of operation has been issued for the source by the director. A certificate of operation is not transferable from one (1) person to another person, nor from one (1) air pollutant source to another air pollutant source, nor from one (1) location to another location. An application for a certificate of operation by the new owner or operator of the air pollutant source, shall be submitted to the Director prior to a transfer of ownership identifying the new owner and any other anticipated changes in operation. An existing source would retain its status as an existing source, except where the source has been shutdown for more than two (2) years. The director is hereby authorized to seal equipment in operation for which a certificate of operation was not obtained as required in this chapter. [Formerly in Section 4-8(b)(1); New T.A.R. 1200-3-9-.03(6)] (2) The owner or operator of any source for which an installation permit is required shall give notification to the director when the work is completed and ready for final inspection. This notification to the director shall include a description of: a. The equipment or air pollution control equipment or activity in consideration; b. Any air pollution control equipment connected or attached to, or serving, or served by the emission unit unless up to date information is on file with the director; and c. Any reasonable additional information, evidence or documentation to show that the completed work is in accord with the original plans as stipulated in section 4-8(a). [Formerly in Section 4-8(b)(1)] (3) Not later than sixty (60) days after achieving the maximum production rate at which the source will be operated, and not later than one hundred fifty (150) days after initial startup of such source, and not later than one hundred fifty (150) days after issuance of the initial certificate of operation for such source, the owner or operator of such source shall complete any required performance test(s) and deliver to the director a written report of the results of such performance test(s). An extension of time may be granted by the director to a source that notifies the director, in writing not later than one hundred twenty (120) days after issuance of the initial certificate of operation for such source, of the request for an extension, the reason for extension, and the duration of the requested extension, except not to any source subject to section 4-41, Rule 15. Failure to operate successfully under test within the limitations and requirements of this chapter shall constitute sufficient grounds for the director to require that changes in the source be made; to reopen the certificate of operation for the revision of its terms and conditions or the addition of new terms and conditions; or to revoke or suspend the certificate of operation, as appropriate. Responsibility for proof and all expenses incurred in conducting the tests shall be borne by the owner or operator of such equipment, or the agent(s) of that person. The director may, if in the opinion of the director the nature of the source in consideration or the use to which it is to be put so justifies, waive the demonstration or test operation, but such waiver shall in no manner provide immunity from prosecution for violations of the other requirements of any applicable law. [Formerly Section 4-8(b)(2)] (4) The director or a designated representative shall have the right to enter the source premises to inspect the source and observe any performance test or operation of the equipment for which a certificate of operation is issued, as provided in section 4-16. [Formerly Section 4-8(b)(3)] (5) Prior to operating any source subject to section 4-8, the owner or operator shall obtain a certificate of operation issued by the director. Each owner and operator of a source that has been issued a certificate of operation shall adhere to the terms and limitations of such certificate of operation throughout its term. All emissions limitations, controls and other requirements imposed by a certificate of operation will be at least as stringent as those contained in this chapter or enforceable under this chapter. Said certificate(s) of operation shall be kept on file at the source premises and made available to bureau representatives upon request. [Formerly Section 4-8(b)(4)] [New: federal enforceability criteria in 54 FR 27282, 6-28-89] (6) Each certificate of operation shall properly identify the equipment to which it pertains and shall specify the class of fuel, type of raw or intermediary material used, if any, for which the equipment and appurtenances have been designed or which have been successfully used in the operating test. The owner or operator or the agent of the owner or operator shall be responsible for notifying the director that equipment for which an initial certificate of operation has been issued has completed any required testing and is ready for permanent operation. With such notification the owner or operator or agent shall submit to the director test and operation data as required by the director for use as evidence that the equipment or source will operate in compliance with all provisions of this chapter. [Formerly in 4-8(c)(1)] (7) Term of a Certificate of Operation. Each initial certificate of operation shall be issued for up to a one (1) year period. Each renewal certificate of operation shall be issued for a period of up to five (5) years. Application for renewal of a certificate of operation for a source shall be made in writing upon forms furnished by the bureau not less than sixty (60) days prior to expiration of the certificate for which renewal is sought. Disclosures of information, tests and other prerequisites to the issuance of an installation permit or initial certificate of operation may be required by the director prior to the issuance of a renewal certificate of operation. The director may refuse to renew a certificate of operation or may require further tests or information if the director determines that the equipment is not in compliance with all the provisions of this chapter. The director may renew a certificate of operation and impose special conditions upon a source that is not in full compliance with this chapter but is subject to a legally enforceable compliance schedule, or upon a source that has appealed other special conditions to the board if that source has filed a timely appeal pursuant to section 4-18. Expiration of any certificate of operation terminates the source's right to operate any equipment or process previously covered by that certificate of operation, except where expiration has occurred due to delay on the part of the Bureau. [Formerly in 4-8(c)(1)] (8) Sampling and Testing. a. Authorization. Whenever the director has reason to believe that the emission limits required by this chapter are being violated by an existing source, the director may require the owner to conduct or to have conducted at the owner's expense tests to determine the emission level of specific air pollutants. The director may require the applicant for an installation permit or a certificate of operation or a federally enforceable certificate of operation, at either a new or an existing source, to conduct, or to have conducted, such tests as are necessary to establish the amount of air pollutants emitted from such source. Such tests shall be conducted in a manner approved by the director. The director shall be notified in writing of any testing at least thirty (30) days prior to such testing, and the director or a representative of the director shall be permitted to witness any testing. The director may conduct tests of air pollution emissions from any source. [Formerly 4-8(c)(2)a.; New T.A.R. 1200-3-10-.01)] b. Test openings and Access, Scaffolding and Facilities. 1. Existing Sources. When tests of existing equipment are deemed necessary by the director and the director elects to conduct such test himself or have his representative conduct such testing the owner shall provide, at no expense to the bureau, reasonable and necessary openings in stacks, vents, and ducts along with safe and easy access thereto including a suitable power source to the point of testing for proper determination of the level of air pollutant emissions and other pertinent facilities as requested by the director. Such facilities may be either permanent or temporary, at the discretion of the owner subject to these provisions; and shall be suitable for determination consistent with the emission limits established in this chapter; and shall comply with all laws and regulations concerning safe construction of, and safe practice in connection with such facilities; provided, however, that if the owner elects to provide temporary facilities then in the event future tests are desired by the director the permittee shall, at no expense to the bureau, provide further facilities when requested to do so by the director. [Formerly 4-8(c)(2)b.; New T.A.R. 1200-3-10-.01)] 2. New Facilities. When tests of new equipment or sources are deemed necessary by the director and the director elects to conduct such test himself or have his representative conduct such testing the owner shall provide, at no expense to the bureau, reasonable and necessary openings in stacks, vents, and ducts along with safe and easy access thereto including a suitable power source to the point of testing for proper determination of the level of air pollutant emissions and other pertinent facilities as requested by the director. Such facilities may be either permanent or temporary, at the discretion of the owner subject to these provisions; and shall be suitable for determination consistent with the emission limits established in this chapter; and shall comply with all laws and regulations concerning safe construction of, and safe practice in connection with such facilities; provided, however, that if the owner elects to provide temporary facilities then in the event future tests are desired by the director the permittee shall, at no expense to the bureau, provide further facilities when requested to do so by the director. The owner or operator shall provide, for any stack or duct at a new source, adequate sampling facilities as follows: (i) Sampling ports of a size, number, and location as the director may require; (ii) Safe access to each port; and (iii) A suitable power source to the point of testing for proper determination of the level of air pollutant emissions. (New T.A.R. 1200-3-10-.01) 3. Periodic Testing. The director may require the owner to conduct or to have conducted periodic tests as are necessary to establish the amount of air pollutants emitted from the source. The nature, extent and frequency of such required testing shall be specified in the certificate of operation. Such tests shall be made at the expense of the owner and shall be conducted in a manner approved by the director. The director shall be supplied with such data as stipulated in the certificate of operation or federally enforceable operating permit. (New T.A.R. 1200-3-10-.01) c. Bureau test. Nothing in this chapter concerning tests conducted by and paid for by any owner or authorized agent of the owner shall be deemed to abridge the rights of the director or a representative of the director to conduct separate or additional tests if the director so requires on behalf of the board or the bureau of air pollution control at the bureau's expense, except regarding test openings as discussed in paragraph (c)(8)b. of this section, covering test openings and access. [Formerly 4-8(c)(2)c.] d. Cost of tests other than section 4-8(c)(8)b.3. Periodic Testing. The owner or operator is liable for the cost of initial tests of any equipment and tests resulting from any change in the activity, equipment, methods or conditions of operation of the source. Initial tests will include all testing performed for the purpose of demonstrating compliance with this chapter for installation permits and for any certificate of operation. The data obtained during any such testing shall be made available to the director and to the owner. [Formerly 4-8(c)(2)d.; New T.A.R. 1200-3-10-.01] e. Methods and procedures. Sampling and analytical determinations to ascertain compliance with this chapter shall be made in accordance with methods and procedures specified in section 4-3. [Formerly 4-8(c)(2)e.] (9) When a certificate of operation is refused, suspended, revoked, or has expired, the director is authorized to seal the process or control equipment until the owner or operator complies with the provisions of this chapter, and no person shall operate any equipment which requires a certificate of operation until such certificate is obtained. [Formerly 4-8(c)(3)] (10) The director shall have authority to require owners and operators of stationary sources to install, maintain and use emission monitoring devices and to make periodic reports to the director on the nature and amounts of emissions from such stationary sources. The director shall have authority to make such data available to the public as reported and as correlated with any applicable emission standards or limitations. [Formerly 4-8(c)(4)] (11) Federally Enforceable Certificates of Operation. All requirements and provisions of this chapter which are applicable to sources issued certificates of operation are also applicable to sources issued federally enforceable certificates of operation, and such requirements are cumulative. A federally enforceable certificate of operation may be applied for and issued under the requirements of section 4-8(c)(11) only after section 4-8(c)(11) has been approved by U.S. EPA into the State Implementation Plan. This municipality retains the authority to designate from time to time which sources or source categories, in addition to those Part 70 sources seeking to qualify themselves for synthetic minor source status, shall be allowed or required to obtain federally enforceable certificates of operation under section 4-8(c)(11). In addition: a. The owner and operator of a source that has been issued a federally enforceable certificate of operation shall adhere to its terms and limitations throughout the term of the certificate of operation and any renewal or revision of it. This requirement of adherence shall be legally enforceable, and a violation of same shall constitute a violation of this chapter. b. Nothing in section 4-8(c)(11) shall be construed to require that a certificate of operation be federally enforced. Nothing in section 4-8(c)(11) shall be construed to impede or impair enforcement of a federally enforceable certificate of operation under other provisions of this chapter or state or federal law. It is the declared legislative intent of this municipality to recognize that any part of this municipality's air pollution control ordinance that is an EPA-approved part of the state implementation plan is also federally enforceable, subject to the provisions and limitations of the federal Clean Air Act; and that any permit or certificate of operation issued under any other part of the air pollution control ordinance of this municipality and any requirement or limitation contained in such ordinance may be enforced federally to the extent that federal law provides for such enforcement. A permit issued under this section 4-8(c)(11) does not authorize or allow a relaxation of any otherwise applicable federal requirements. c. The director or the board, in issuing a federally enforceable certificate of operation, shall assure that all emissions limitations, controls and other requirements imposed by such certificate of operation are at least as stringent as any other applicable limitations and requirements contained in, or enforceable under, the State Implementation Plan. The director or the board shall not issue a federally enforceable certificate of operation that waives or makes less stringent any limitations or requirements contained in or issued pursuant to the State Implementation Plan or that are otherwise federally enforceable under it. d. The limitations, controls and requirements in a federally enforceable certificate of operation shall be permanent, quantifiable and otherwise enforceable as a practical matter. e. Any federally enforceable certificate of operation issued to a synthetic minor source shall also contain a statement of basis comparing the source's potential to emit with the synthetic limit to emit and a description of the procedures to be followed that will ensure that the limit on which the director or the board bases a determination that a source is a synthetic minor source and not a major source, as those terms are defined in section 4-53, is not exceeded. f. Nothing in section 4-8(c)(11) shall be construed to prohibit enforcement of a federally enforceable certificate of operation under the general enforcement provisions of this ordinance or of state or federal law. g. The Director shall give notice to U.S. EPA and the general public at least thirty (30) days in advance of a public hearing on the issuance of a proposed federally enforceable certificate of operation and shall provide at least thirty (30) days for public comment. A proposed change to the potential to emit air pollutants or hazardous air pollutants of any source previously determined by the Board to be a synthetic minor source and issued one (1) or more federally enforceable certificates of operation that have not yet expired, is not subject to subsequent public participation requirements regarding the proposed change so long as the proposed change would not result in a net increase in the potential-to-emit of any air pollutant or any hazardous air pollutant, as determined by the Director. The Director shall provide U.S. EPA with a copy of a proposed certificate of operation intended to be federally enforceable at the same time notice is provided. Such notice shall be given by publication as an electronic notice (e-notice) on the Bureau website for the duration of the public comment period and by other means designated by the Director, if necessary. Such advance notice must be given and a public hearing must be held prior to issuance of any federally enforceable certificate of operation to any source. The Director shall, in a timely manner, provide U.S. EPA a copy of the final certificate of operation intended to be federally enforceable. h. If U.S. EPA deems such a proposed certificate of operation to fail to qualify as a federally enforceable certificate of operation, then the director shall notify the applicant of the position taken by U.S. EPA and either (1) the applicant may resubmit the application in amended or modified form for further processing under this section 4-8(c)(11) or (2) the director may issue a certificate of operation stating on its face that it is deemed not be federally enforceable. i. A source that has submitted a written request for synthetic minor source status to the director by September 1, 1995, with apparently approvable proposed physical or operational limitations on its potential to emit, or both, including a statement of basis comparing the source's potential to emit with its proposed synthetic limit to emit and a description of the procedures to be followed that will ensure its proposed limitations are not exceeded, will remain subject to the fees set forth in § 4-8 and not to the Part 70 Operating Permit Program fees set forth in § 4-60. If the board or the director determines after November 1, 1995, that such source is not eligible for synthetic minor source status, such source shall be liable for Part 70 Operating Permit Program fees set forth in § 4-60 retroactive to November 1, 1995, with interest pursuant to Tennessee Code Annotated Section 47-14-121. (12) Fees for Certificates of Operation. a. Fees. A source shall be required to pay the required fee prior to issuance of any certificate of operation to that source and to maintain the certificate of operation, once issued. b. Initial Certificate of Operation Fees. The following fee schedules shall apply to the initial issuance of any certificate of operation. The fees in these schedules may be adjusted each year, if necessary as determined by the Board, by up to the percentage, if any, by which the Consumer Price Index for All Urban Consumers (CPI-U) for the most recent completed calendar year exceeds the CPI-U for calendar year 2025. The CPI-U is compiled by the Bureau of Labor Statistics of the U.S. Department of Labor. The Board may review these fees annually to determine if they continue to meet the financial requirements of the Bureau to fulfill the activities allowed to be funded by these fees. Said fees shall be collected by the Bureau and remitted to the City of Chattanooga finance officer as fiscal agent for the Board, who shall accumulate such fees in an account dedicated to the Board for air pollution control activities. INITIAL CERTIFICATES OF OPERATION SCHEDULE 4-8-C-I. FUEL-BURNING EQUIPMENT Fuel Burning Rate (Million Btu per Hour) | Fee 0.5 to 4.99 | $900.00 5 to 14.99 | 1,020.00 15 to 99.99 | 1,200.00 100 or greater | 1,380.00 SCHEDULE 4-8-C-II. INCINERATORS Incineration Rate (Pounds per Hour) | Fee Up to 200 | $420.00 200 to 599 | 480.00 600 to 999 | 540.00 1,000 to 1,999 | 600.00 2,000 to 4,999 | 660.00 5,000 to 9,999 | 720.00 10,000 or greater | 780.00 SCHEDULE 4-8-C-III. PROCESS EQUIPMENT Process Weight (Pounds per Hour) | Fee Up to 999 | $540.00 1,000 to 9,999 | 720.00 10,000 to 49,999 | 900.00 50,000 to 149,999 | 1,080.00 150,000 and greater | 1,200.00 SCHEDULE 4-8-C-IV. ODOR PRODUCING EQUIPMENT Each unit shall be assessed a fee of four hundred eight dollars ($480.00). SCHEDULE 4-8-C-V. MISCELLANEOUS Each unit shall be assessed a fee of four hundred eight dollars ($480.00). c. Renewal Certificate of Operation Annual Fees. A source that has applied for renewal of one or more certificates of operation shall pay the required annual fee prior to issuance of any renewal certificate(s) of operation to it. Subsequent to issuance of any renewal certificate(s) of operation to a source, the source shall pay the required annual fee throughout the term of the permit, not later than the anniversary of issuance of any renewal certificate(s) of operation. The following annual fee schedules shall apply to the renewal of any certificate of operation. The fees in these schedules may be adjusted each year, if necessary as determined by the Board, by up to the percentage, if any, by which the Consumer Price Index for All Urban Consumers (CPI-U) for the most recent completed calendar year exceeds the CPI-U for calendar year 2025. The CPI-U is compiled by the Bureau of Labor Statistics of the U.S. Department of Labor. The Board may review these fees annually to determine if they continue to meet the financial requirements of the Bureau to fulfill the activities allowed to be funded by these fees. Said fees shall be collected by the Bureau and remitted to the City of Chattanooga finance officer as fiscal agent for the Board, who shall accumulate such fees in an account dedicated to the Board for air pollution control activities. RENEWAL CERTIFICATES OF OPERATION SCHEDULE 4-8-C-VI. FUEL-BURNING EQUIPMENT Fuel Burning Rate (Million Btu per Hour) | Fee 0.5 to 4.99 | $420.00 5 to 14.99 | 480.00 15 to 99.99 | 540.00 100 or greater | 620.00 SCHEDULE 4-8-C-VII. INCINERATORS Incineration Rate (Pounds per Hour) | Fee Up to 200 | $300.00 200 to 599 | 320.00 600 to 999 | 365.00 1,000 to 1,999 | 438.00 2,000 to 4,999 | 480.00 5,000 to 9,999 | 530.00 10,000 or greater | 575.00 SCHEDULE 4-8-C-VIII. PROCESS EQUIPMENT Process Weight (Pounds per Hour) | Fee Up to 999 | $300.00 1,000 to 9,999 | 420.00 10,000 to 49,999 | 540.00 50,000 to 149,999 | 660.00 150,000 to 499,999 | 780.00 500,000 to 999,999 | 900.00 1,000,000 or greater | 1,020.00 SCHEDULE 4-8-C-IX. ODOR PRODUCING EQUIPMENT Each unit shall be assessed a fee of three hundred dollars ($300.00). SCHEDULE 4-8-C-X. MISCELLANEOUS Each unit shall be assessed a fee of three hundred dollars ($300.00). (d) General provisions. (1) The issuance by the director or board of any installation permit or certificate of operation shall not be held to exempt the person to whom the permit or certificate of operation was issued, or any other person subject to this chapter, from prosecution for any violation of any provisions of this chapter, or from action under any other provisions of this chapter or any other provisions of law. [Formerly 4-8(d)(2)] (2) No person shall cause, suffer, allow or permit the operation of any equipment or installation subject to the provisions of this chapter in violation of an authorized seal of said equipment or installation. [Formerly 4-8(d)(3)] (3) The provisions of this section shall not apply to fuel-burning equipment used exclusively for heating the dwellings of less than three (3) families; nor to equipment for burning gas, or number one (1) or number two (2) fuel oil, with a design heat input capacity of less than five million (5,000,000) BTU per hour (BTU/hr). [Formerly Section 4-8(d)(4)] (4) Duplicate Permits. Duplicate permits or certificates of operation may be issued by the Director if requested by the owner or operator. A fee of seventy-five dollars ($75.00) shall be charged for issuing a duplicate installation permit or certificate of operation. A fee of three hundred dollars ($300.00) shall be charged for issuing a duplicate Part 70 operating permit. Said fees shall be collected by the Bureau and remitted to the City of Chattanooga finance officer as fiscal agent for the Board who shall accumulate such fees in an account dedicated to the Board for air pollution control activities. (5) The schedules of fees for certificates of operation for fuel-burning equipment, incinerators, and process equipment are to be based upon rated design input of said equipment. Whenever legally enforceable limitations on operating hours or production rate are included in a certificate of operation for a source, then the schedule of fees imposed on the source is to be based on the legally enforceable limitations. [Formerly 4-8(d)(6)] (6) An additional fee of 5.0 percent of the outstanding amount, compounded monthly, shall be assessed for any certificate of operation fee that has not been paid by thirty (30) days after the due date that is indicated on the corresponding invoice. Said fee shall be collected by the Bureau and remitted to the City of Chattanooga finance officer as fiscal agent for the Board who shall accumulate such fees in an account dedicated to the Board for air pollution control activities. (7) Administrative Amendments to a Certificate of Operation or an Installation Permit. a. An administrative amendment is a revision of a certificate of operation or an installation permit that: 1. Corrects typographical errors; 2. Identifies a change in the legal name, address, or telephone number of any person initially identified in the permit (but not transfer of ownership to a different party), or provides a similar minor administrative change at the source; or 3. Incorporates into the certificate of operation all applicable provisions of the installation permit. b. The director shall take no more than sixty (60) days after receipt of a request for an administrative amendment to take final action on such request, and may incorporate such changes without giving public notice or opportunity for public comment. (New based on concept in 40 CFR 70.7(d)) [Formerly 4-8(d)(9)] (e) Construction or modification permit. (1) Except as provided in paragraph (e)(2) of this section, the director shall not grant a permit for the construction or modification of any air contaminant source in any attainment area or unclassified area if such construction or modification will interfere with the maintenance of the air quality standard in an area where the construction or modification has a significant impact on air quality standards or will violate any provisions of this chapter or will violate any provisions of the Tennessee Air Quality Act. If an attainment area is redesignated to nonattainment status, the terms and conditions of the installation permits and certificates of operation issued in accordance with section 4-8 of the Chattanooga Air Pollution Control Ordinance immediately preceding the effective date of the redesignation shall remain in full force and effect for those sources to which section 4-8 had applicability prior to the effective date of the redesignation, until such time as revised or additional installation permits or certificates of operation are issued to those sources with revised or additional terms and conditions that are applicable to sources in nonattainment areas. (2) Nonattainment areas. If a nonattainment area is redesignated to attainment or unclassifiable or nonattainment status is otherwise eliminated, the requirements contained in this subsection 4-8(e)(2) shall remain in full force and effect for those sources to which this section 4-8 had applicability prior to the effective date of the redesignation. The director shall not grant a permit for construction or modification of any air contaminant source in a nonattainment area nor to any source that significantly impacts on a nonattainment area if such construction or modification will interfere with reasonable further progress in attainment of the specific air quality standards or will violate provisions of this chapter except in accordance with the following: a. All new or modified sources shall utilize good engineering practice, as determined by the director, in designing stacks. The director will consider only stack heights that represent good engineering practice in determining whether emission control measures are sufficient. b. All new or modified sources of criteria pollutants constructed or modified after the effective date of this provision which are not classified as major sources or major modifications shall utilize best available control technology (BACT) as determined by the director at the time of the permit application. 1. For the purposes of section 4-8(e), "major modification" is defined as follows: (i) "Major modification" means any physical change in or change in the method of operation of a major stationary source that would result in a significant net emissions increase for any pollutant subject to regulations under this chapter. (ii) Any net emissions increase that is considered significant for volatile organic compounds or nitrogen oxides shall be considered significant for ozone. (iii) A physical change or change in the method of operation shall not include: (A) Routine maintenance, repair, and replacement; (B) Use of an alternative fuel or raw material by reason of any order under section 2(a) and (b) of the Energy Supply and Environmental Coordination Act of 1974 (or any superseding legislation) or by reason of a natural gas curtailment plan pursuant to an applicable federal statute; (C) Use of an alternative fuel by reason of an order or rule under section 125 of the Federal Clean Air Act; (D) Use of an alternative fuel at a steam generating unit (burning equipment of two hundred fifty million (250,000,000) BTUs per hour or larger) to the extent that the fuel is generated from municipal solid waste as determined by the Tennessee Division of Solid Waste Management; (E) Use of an alternative fuel or raw material by a stationary source which the source was capable of accommodating before January 6, 1975, unless such change would be prohibited under a legally enforceable permit or certificate condition which was established after January 6, 1975, pursuant to Title 40 CFR Part 52.21 or under regulations approved pursuant to Title 40 CFR Part 51 Subpart I or Subpart 51.166, which have been incorporated by reference in Chapter 4 or the source is approved to use under any permit or certificate issued pursuant to this paragraph; (F) An increase in the hours of operation or in the production rate, unless such change would be prohibited under a legally enforceable permit or certificate of condition which was established after January 6, 1975, pursuant to Title 40 CFR Part 52.21 or regulations approved pursuant to Title 40 CFR Part 51 Subpart I or Subpart 51.166, which have been incorporated by reference in Chapter 4; or (G) Any change in ownership at a stationary source. 2. For the purposes of section 4-8(e), "net emissions increase" shall have the following meaning: (i) "Net emissions increase" means the amount by which the sum of the following exceeds zero: (A) Any increase in actual emissions from a particular physical change or change in the method of operation at a stationary source; and (B) Any other increases and decreases in actual emissions at the stationary source that are contemporaneous with the particular change and are otherwise creditable. (ii) An increase or decrease in actual emissions is creditable only if it occurs between: (A) The date five (5) years before a completed application for the particular change is submitted; and (B) The date that the increase from the particular change occurs. (iii) An increase or decrease in actual emissions is creditable only if the board or director has not relied on it in issuing a permit or certificate of operation for the source, under regulations approved pursuant to Title 40 CFR Part 51, Subpart I, which has been incorporated by reference in Chapter 4 which is in effect when the increase in actual emissions from the particular change occurs. (iv) An increase in actual emissions is creditable only to the extent that the new level of actual emissions exceeds the old level. (v) A decrease in actual emissions is creditable only to the extent that: (A) The old level of actual emissions or the old level of allowable emissions, whichever is lower, exceeds the new level of actual emissions; (B) It is legally enforceable at and after the time that actual construction on the particular change begins; (C) The board or director has not relied on it in issuing any permit or certificate of operation to a new or modified air pollutant source under regulations approved pursuant to Title 40 CFR Part 51, Subpart I, which has been incorporated by reference in Chapter 4 or the board or the director have not relied on it in demonstrating attainment or reasonable further progress; and (D) It has approximately the same qualitative significance for public health and welfare as that attributed to the increase from the particular change, considering the nature of the air pollutants to be released into the ambient air from the particular change. 3. For the purposes of section 4-8(e), "significant" means, in reference to a net emissions increase or the potential of a source to emit any of the following air pollutants, a rate of emissions that would equal or exceed any of the following rates: (i) Carbon monoxide: One hundred (100) tons per year (tpy) (ii) Nitrogen Oxides: Forty (40) tpy (iii) Sulfur dioxide: Forty (40) tpy (iv) Ozone: Forty (40) tpy of an ozone precursor (v) Lead: Six-tenths (0.6) tpy (vi) PM 10 : Fifteen (15) tpy 4. For the purposes of section 4-8(e), "ozone precursor" means volatile organic compounds and/or nitrogen oxides. A proposed new source or a net emissions increase at an existing source in an ozone nonattainment area can be classified as major based on either VOC or NO x emissions or both (but not in combination). That is, the determination of major must be made individually for each pollutant, since VOC and NO x emissions cannot be added to meet the minimum level required for such a demonstration. Notwithstanding the above, NO x shall not be considered an ozone precursor when: (a) Additional NO x emissions reductions would not be expected to decrease ozone; and (b) The EPA Administrator determines for certain classes or categories of sources, when approving a revision of the State Implementation Plan for Tennessee, that net air quality benefits would be greater in the absence of further nitrogen oxides reductions from sources concerned. [New: T.A.R. 1200-3-9-.01(5)(b)1.] c. A new major source or major modification shall meet the lowest achievable emission rate (LAER) as determined by the director at the time of the permit application. d. A major source or major modification shall also show that it will not interfere with reasonable further progress in attaining the ambient air quality standards by one (1) of the following methods: 1. Banked credits. (i) By agreeing to control the nonattainment emissions to a rate lower than the nonattainment emissions specified as reasonably available control technology (RACT), the owner or operator of an air contaminant source has reserved the right to utilize the incremental reduction between RACT and the banked credit agreed rate (BCAR) to provide for future growth in the nonattainment area. (ii) The banked credit agreed rate is an emission rate more restrictive than RACT which is mutually agreed to by the director and an air contaminant source for the purpose of establishing a banked credit. This emission level is in no way related to BACT or LAER. Only sources in existence at the time of a nonattainment state implementation plan revision for an area are eligible to establish a banked credit agreed rate. (iii) The following limitations shall apply to the issuance of a permit for construction or modification for sources using banked credit agreed rate: (A) All banked credits in a given nonattainment area shall become void upon official reclassification of that area as an attainment area. (B) An increase in pounds per hour shall be offset by a banked credit of that amount. The banked credit account will be reduced by that amount. (C) The owner or operator shall demonstrate by air quality modeling that there is a net air quality benefit in the nonattainment area, taking into account emissions credits used to offset them. (D) A banked credit shall not be used until the banked credit agreed rate level of control is attained by the source involved and demonstrated through a source test or through another method acceptable to the director. (E) The banked credit agreed rate shall be contained in the state implementation plan as the legally enforceable standard for the air contaminant source. If the source electing to use banked credits must reduce emissions to achieve the banked credit agreed rate level approved a compliance schedule shall be included in the state implementation plan revision. 2. Emission offsets. (i) For major sources, a larger than one (1) to one (1) offset of emissions of the nonattainment pollutant, based on both allowable and actual emissions, shall be employed. This offset must result in a net improvement in predicted air quality for the pollutant in the area under the influence of emissions from the new or modified major sources and ensure that reasonable further progress shall not be hindered. (ii) All or any portions of the offsets shall be consummated at the time new source operation commences and demonstrated through a source test or through another method acceptable to the director. (iii) The reductions shall come from sources in the emission inventory used in the approved control strategy for the nonattainment area state implementation plan revision. (iv) The amount of the proposed reduction shall be sufficient to offset both the emission increases directly associated with the proposed source construction or modification and those emissions attributed to permitted minor sources that have come into the area since the last reasonable further progress milestone was met. 3. Construction of new major sources or major modifications that have insufficient emission offsets or banked credits to meet the requirements of paragraphs (e)(2)d.1. and (e)(2)d.2. The director may issue a construction permit or proposed new or modified sources provided the sources' emissions will not prevent reasonable further progress in the nonattainment area or will not prevent the ambient air quality standards from being met. Completed applications from sources qualifying for this provision will be processed in the order received by the bureau. (Existing sources will not be required to offset any emissions resulting from permitting of a source for which no emission offsets or banked credits were provided.) 4. Combination of the provisions of paragraphs (e)(2)d.1., (e)(2)d.2. and (e)(2)d.3. of this section. e. A source is identified as major source for each pollutant as indicated below: 1. A major source for SO 2 is a source with uncontrolled emissions of more than one hundred (100) tons per year and allowable emissions (based on BACT) greater than any of the following: Fifty (50) tons per year; One thousand (1,000) pounds per day; One hundred (100) pounds per hour. 2. A major source for carbon monoxide is a source with uncontrolled emissions of greater than one thousand (1,000) tons per year and allowable emissions (based on BACT) greater than any of the following: Fifty (50) tons per year; One thousand (1,000) pounds per day; One hundred (100) per hour. 3. A major source for particulate matter is any source with uncontrolled emissions of more than one hundred (100) tons per year and allowable emissions of greater than five (5) tons per year, one thousand (1,000) pounds per day, or one hundred (100) pounds per hour (based on BACT). Piecemeal construction is cumulative. When an air contaminant source's new or modified allowable emissions equal or exceed the above levels, it becomes a major source. "Uncontrolled emissions" as used above means the capability at maximum capacity to emit a pollutant in the absence of air pollution control equipment. "Air pollution control equipment" includes control equipment which is not, aside from air pollution control laws and regulations, vital to production of the normal product of the source or to its normal operation. Annual uncontrolled emissions shall be based on the maximum annual rated capacity of the source, unless the source is subject to enforceable permit conditions which limit the annual hours of operation. Enforceable permit conditions on the type or amount of materials combusted or processed may be used in determining the uncontrolled emission rate of a source. f. An increase in emissions from a new or modified air contaminant source (all sources at a given plant location) is deemed to significantly impact on air quality within the nonattainment area when it contributes to air quality, in the following amounts or more: Pollutant | Annual | 24-hour | 3-hour | 8-hour | 1-hour Sulfur dioxide | 1 μg/m 3 | 5 μg/m 3 | 25 μg/m 3 Particulate matter | 1 μg/m 3 | 5 μg/m 3 Carbon monoxide | 0.5 mg/m 3 | 2 mg/m 3 g. The director shall not issue a permit to any major source in or significantly impacting a nonattainment area unless all other sources owned or operated by the applicant anywhere in the state are in compliance or on an approved compliance schedule. h. Regardless of the specific emission limitations contained in this rule, all sources identified in section 4-41, Rule 18.2 of this chapter, shall comply with the standards set pursuant to section 4-41, Rule 18.2. i. For existing fuel-burning equipment, credit shall be based on the allowable emissions under the applicable state implementation plan for the type of fuel being burned at the time the application for an installation permit for the proposed construction or modification is filed. If the existing source commits to switch to a cleaner fuel at some future date, emissions offset credit based on the allowable (or actual) emissions of the fuel involved is not acceptable, unless the permit and subsequent permits and certificates of operation are conditioned to require the use of a specified alternative control measure which would achieve the same degree of emissions reduction should the source switch back to a dirtier fuel at some later date. The director, or the board where appropriate, should ensure that adequate long-term supplies of the new fuel are available before granting emissions offset credit for fuel switches. j. Emissions reductions achieved by shutting down an existing source or permanently curtailing production or operating hours below baseline levels may be credited, provided that the work force to be affected has been notified of the proposed shutdown or curtailment. Source shutdowns and curtailments in production or operating hours occurring prior to the date the new source application is filed generally may not be used for emissions offset credit. However, where an applicant can establish that it shut down or curtailed production after August 7, 1977, or less than one (1) year prior to the date of permit application, whichever is earlier, and the proposed new source is a replacement for the shutdown or curtailment, credit for such shutdown or curtailment may be applied to offset emissions from the new source. k. All emission reductions claimed as offset credit shall be legally enforceable. l. Procedures relating to the permissible location of offsetting emissions shall be followed which are at least as stringent as those set out in 40 CFR Part 51 Appendix S, section IV.D. m. Credit for an emissions reduction can be claimed to the extent that the bureau, or the board where appropriate, has not relied on it in issuing any permit under regulations approved or has not relied on it in demonstrating attainment or reasonable further progress. n. Approval to construct shall not relieve any owner or operator of the responsibility to comply fully with applicable provisions of the plan and any other requirements under local, state or federal law. At such time that a particular source or modification becomes a major stationary source or major modification solely by virtue of a relaxation in any enforcement limitation which was established after August 7, 1980, on the capacity of the source or modification otherwise to emit a pollutant, such as a restriction on hours of operation, then the requirements of this section shall apply to the source or modification as though construction had not yet commenced on the source or modification. (f) Building demolition or renovation permit (Asbestos). (1) No person shall cause, suffer, allow or permit the renovation of any facility involving the removal or disturbance of friable asbestos-containing material subject to Section 4-41, Rule 17.5, of this chapter, until an application, together with the plans and specifications required by said rule, has been filed by the person or his agent in the office of, and has been approved by, the director and a permit issued for such renovation. For the purposes of this rule, the terms "renovation" and "facility" shall have the same meaning given them in Section 4-41, Rule 17.1, of this chapter. (2) No person shall cause, suffer, allow or permit the demolition of any facility until an application, together with the plans and specifications required by Section 4-41, Rule 17, of this chapter, has been filed by the person or his agent in the office of, and has been approved by, the director and a permit issued for such demolition. For the purposes of this rule, the terms "demolition" and "facility" shall have the same meaning given them in Section 4-41, Rule 17.1, of this chapter. (3) The plans and specifications, filed pursuant to paragraphs (f)(1) and (f)(2) above, shall be submitted on forms approved by the director. Such application shall be filed in accordance with the time requirements set forth in Section 4-41, Rule 17.5, of this chapter. In addition, Rule 17.5 contains the standard for demolition and renovation, including notification requirements applicable to all demolition projects and to certain renovation projects. (4) Fees. The following fee schedules shall apply to the issuance of permits for all demolitions or for those renovations involving friable asbestos-containing materials (ACM) subject to Rule 17.5, except in paragraphs (f)(5) and (f)(6) below. The fees in these schedules may be adjusted each year, if necessary as determined by the Board, by up to the percentage, if any, by which the Consumer Price Index for All Urban Consumers (CPI-U) for the most recent completed calendar year exceeds the CPI-U for calendar year 2025. The CPI-U is compiled by the Bureau of Labor Statistics of the U.S. Department of Labor. The Board may review these fees annually to determine if they continue to meet the financial requirements of the Bureau to fulfill the activities allowed to be funded by these fees. If work begins on any regulated renovation or demolition without having obtained the required permit, or if work is performed other than in accordance with the plans and specifications filed with and approved by the Director to obtain the permit, the Director may grant such permit; provided, however, that the permit fee is doubled in all such cases. Fees shall be collected by the Bureau and remitted to the City of Chattanooga finance officer as fiscal agent for the Board who shall accumulate such fees in an account dedicated to the Board for air pollution control activities. Only one initial fee shall be assessed for any renovation or demolition project occurring at an installation on one contiguous site owned by the same owner within six months after receipt of the initial application where the ACM is calculated (as set forth in Section 4-41, Rule 17.5 of this chapter) in both linear feet and in square feet. When ACM is to be removed and involves calculating in both linear and square feet, the ACM footage will be summed to determine the appropriate fee from Schedule 4-8-F-II or Schedule 4-8-F-III: SCHEDULE 4-8-F-I. DEMOLITIONS WHERE NO ASBESTOS IS PRESENT Fee | $250.00 per structure SCHEDULE 4-8-F-II. DEMOLITIONS WHERE REGULATED ASBESTOS IS PRESENT For ACM used to fireproof or insulate pipes, or to insulate any duct, boiler, tank, reactor, turbine, furnace, or structural member, including interior and exterior walls, floors, ceilings, and roofs: Linear/Square Feet of ACM | Fee 160 - 299 (square feet) | $390.00 plus $250.00 per structure 260 - 299 (linear feet) | 390.00 plus $250.00 per structure 300 - 499 | 625.00 plus $250.00 per structure 500 - 999 | 855.00 plus $250.00 per structure 1,000 - 1,499 | 1,015.00 plus $250.00 per structure 1,500 - 4,999 | 1,250.00 plus $250.00 per structure 5,000 and up | 1,560.00 plus $250.00 per structure SCHEDULE 4-8-F-III. RENOVATIONS WHERE REGULATED ASBESTOS IS PRESENT For ACM used to fireproof or insulate pipes, or to insulate any duct, boiler, tank, reactor, turbine, furnace, or structural member, including interior and exterior walls, floors, ceilings, and roofs: Linear/Square Feet of ACM | Fee 160 - 299 (square feet) | 390.00 260 - 299 (linear feet) | 390.00 300 - 499 | 625.00 500 - 999 | 855.00 1,000 - 1,499 | 1,015.00 1,500 - 4,999 | 1,250.00 5,000 and up | 1,560.00 (5) Schedule 4-8-F-I shall apply only to a demolition project in which at least twenty-five percent (25%) of one building is razed. If less than twenty-five percent (25%) of one building is being demolished, the notice required by Section 4-41, Rule 17.5 shall be required, but the fee established in Schedule 4-8-F-I shall be waived. (6) These fee schedules shall not apply to an owner or operator who has previously certified to the bureau that all asbestos-containing materials have been removed from a building, which was confirmed by the bureau at that time, that is the subject of a subsequent notification of a demolition subject to Rule 17.5 if the owner or operator certifies, at the time of notification to the bureau, that no asbestos-containing materials were added to or placed in the building after the date of original bureau confirmation. (g) Public Notice Requirements. The Bureau shall notify the public, on a monthly basis, by publication as an electronic notice (e-notice) on the Bureau website for the duration of the public comment period and by other means designated by the Director, if necessary, of any applicants seeking to obtain a permit to construct or modify an air contaminant source. Provided, however, that modifications which do not result in a net emissions increase in the potential emissions of any air pollutant or that qualify as a minor permit modification will not be subject to the notice requirements of this paragraph. The notice shall specify the general vicinity or location of the proposed source or modification, the type of source or modification, and opportunity for public comment. Comments shall be in writing and delivered to the Director within thirty (30) days after the publication of the public notice. If there is no application during a particular month, no notice shall be required for that month. The Bureau may publish the notice for a single application if the source so requests. Any costs for all public notices required to be published, including those for federally-enforceable initial certificates of operation, Part 70 major source operating permits (initial and renewal), installation (construction) permits, PSD permits, and applicable modifications of any permit, shall be assessed to the applicant in addition to the associated permit fee. Where multiple sources are included in the published notice, any costs shall be apportioned equally between or among those multiple sources. The Bureau shall be required to publish notices pursuant to this section only in those months for which an actual application has been received and which is subject to these provisions. Failure to pay these costs shall constitute a violation of this ordinance for which enforcement action may be taken
(Code 1986, § 4-8; Ord. No. 9846, § 2, 3-9-93; Ord. No. 10277, §§ 6—8, 27, 8-15-95; Ord. No. 10786, §§ 19—29, 58, 62, 10-27-98; Ord. No. 10924, §§ 1—15, 11-2-99; Ord. No. 10968, §§ 1—4, 2-8-00; Ord. No. 12054, §§ 1—7, 12-11-07; Ord. No. 13221, §§ 5—10, 9-19-17; Ord. No. 13998, §§ 14—18, 6-27-23; Ord. No. 14165, § 2, 10-29-24; Ord. No. 14324, §§ 2—6, 2-17-26)