For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-106 — Objectives and policy

Municipal Code of the City of Franklin, Tennessee (Codified through Ordinance No. 2026-13, adopted June 23, 2026 (Supp. No. 30)) · Franklin Municipal Code § 23-106

Corpus is an independent public-information project, not the official City of Franklin website. Stable reference: corpuslaw.us/code/fff3fb02-870f-4c40-9c7b-43491aed3fee

Sec. 23-106. - Objectives and policy.

(1) Objectives. The objectives of this title are pursuant to the small MS4 permit issued by the state to the city and are as follows: (a) To protect human life and health. (b) To minimize the need for rescue and relief efforts associated with flooding. (c) To eliminate any non-allowable discharges to the city's MS4 that impact water quality. (d) To help maintain a stable tax base by providing for the sound use and development of flood-prone areas in such a manner as to maximize beneficial use without increasing flood hazard potential or diminishing the quality of the natural stormwater resources. (e) To ensure that potential homebuyers are notified that property is in a flood area and generally increase the public awareness of flooding potential. (f) To minimize prolonged business interruptions. (g) To minimize damage to public facilities and utilities such as water and gas mains; electric, telephone, and sanitary sewer lines; and streets and bridges located in floodplains. (h) To ensure a functional public and private stormwater quantity and quality management system that will not result in excessive maintenance costs. (i) To encourage the use of natural and aesthetically pleasing design that maximizes preservation of natural areas. (j) To guide the construction of stormwater management facilities by developing comprehensive master plans to address stormwater quantity and quality. (k) To encourage preservation of floodplains, floodways, and open spaces to protect and benefit the community's quality of life and natural resources. (l) To encourage community stewardship of the city's water resources and their impacts on the community character and quality of life. (2) Implementation. To implement the objectives presented above, the following standards and general policy statements shall be enforced: (a) Permits. All new development and redevelopment under the jurisdiction of this chapter shall obtain a stormwater management permit and/or grading permit. If site disturbance is over one acre, is part of a larger common plan of development, or is required to have lot level coverage, the applicant shall obtain a notice of coverage through the city's qualified local program process. (i) The city engineer shall issue a grading and stormwater management permit for stormwater management plans that meet the guidelines of this title and any other provision given authority under section 23-110 of this title. Application for a permit shall be accompanied by a fee as specified in appendix A, comprehensive fees and penalties. (ii) Technical, administrative, or procedural matters may be modified by the city engineer as needed to meet the objectives and policies defined in this title, so long as such modifications as to technical, administrative, or procedural matters are not contrary or beyond the intent of the objectives and policies of this title. (iii) Approved permits shall be displayed in a conspicuous location on all active construction sites. (iv) A pre-construction meeting with the city engineer, or his designee shall be held with construction site operators prior to the issuance of a grading and/or stormwater management permit. (v) All site permittees and/or operators shall apply for a notice of termination to the city's engineering department stating that all areas have been stabilized and vegetated, and all construction activities have been completed related to that sections or site's corresponding stormwater and grading permit and notice of coverage. This shall be completed prior to the release of all performance sureties. (vi) Site owner or developer and/or contractor that wish to transfer stormwater and grading permit coverage to a new owner or developer and/or contractor shall do so by applying for a notice of transfer request in the city's engineering department. The site owner or developer shall also be required to transfer performance sureties to the new site owner or developer prior to the City of Franklin approving the notice of transfer. (vii) The permittee(s) shall be responsible for all EPSC measures and maintenance located within the sites or sections defined in the permit regardless of individual lot ownership until a notice of transfer or notice of termination is issued by the city's engineering department. (viii) Stormwater and grading permits shall be terminated after one year of site inactivity, unless otherwise determined by the city engineer. After permit termination a new permit application shall be submitted and approved, and a new site pre-construction meeting shall be required before construction is to resume. (b) Stormwater plan submittal requirements. All new development and redevelopment under the jurisdiction of this title shall be required to submit and have approval of all construction plans, NOI, and SWPPP prior to issuance of stormwater and/or grading permit approval. (i) An engineer shall stamp all proposed plans for construction in the city. This shall include all proposed improvements or modifications to the existing or new stormwater infrastructure, EPSC practices, and other related improvements or modifications. (ii) All development or redevelopment plans and/or site plans submitted to the city for review shall conduct an environmental site assessment which evaluates the property for water resources. This shall be done before initial submittal for review. Failure to do so shall result in rejection of plan submittal. (c) Stormwater master plan. Each individual project shall be evaluated for consistency with the master stormwater management plan for the major watershed or watersheds within which the project site is located. The individual project evaluation will determine if stormwater quantity and quality management practices can adequately serve the property and limit impacts to downstream public and private properties. The presence of a regional stormwater management feature(s) will be considered in determining the extent to which quantity and/or quality controls will be necessary. (i) In the absence of such a stormwater quantity and/or quality master plan, a system of uniform requirements shall be applied to each individual project site. In general, these uniform requirements will be based on the criteria that post-development stormwater peak runoff, volume over the critical design-storm period, and water quality must not differ significantly from pre-development conditions. These criteria shall be included in the stormwater management plan for the site. (d) Peak runoff control. Peak runoff control facilities for new development and redevelopment shall be designed to address the rate at which flow is released over the entire runoff discharge period and the volume of discharge over the critical design-storm period. This shall be applied for two-, five-, ten-, 25-, 50- and 100-year 24-hour storm peak discharge rate not to exceed the pre-development (or undisturbed natural conditions) discharge rate. (i) Calculation of peak runoff flow. Acceptable methodologies for computing pre- and post-development conditions shall include: A. The rational method (used when the drainage area is 25 acres or less). B. The peak discharge method as described in USDA Technical Release Number 55 (TR-55) (drainage area is 2,000 acres or less). (ii) Peak runoff flow requirements. If the total land disturbance area is less than 50 percent of the property, then peak runoff control shall be required for the disturbed area only. If the total land disturbance area is greater than 50 percent of the property, then peak runoff control shall be required for the entire site area. (iii) Redevelopment of property without existing detention shall be evaluated using one of the following methods unless otherwise determined by the city engineer: A. Rational method shall evaluate pre-development conditions utilizing the appropriate turf meadows runoff coefficient or as existing conditions. The more stringent conditions shall govern. B. USDA Technical Release Number 55 (TR-55) shall evaluate the pre-development conditions as either grassland conditions or as existing conditions. The more stringent conditions shall govern. (iv) No more than five percent of impervious surface on a site can bypass water quality treatment unless otherwise approved by the city engineer. (e) Stormwater design requirements. New development shall meet a stormwater quantity level of service defined by: (i) Designing road catch basins and connecting culverts to convey the ten-year design-storm runoff. No portion of the storm pipe network shall be surcharged above the interior crown elevation. (ii) Designing bridges, culverts, channels, and cross-drains to pass the 50-year design-storm runoff. No portion of the storm pipe network shall be surcharged above the interior crown elevation. (iii) Providing emergency bypass of the 100-year flood event. (iv) New roadway, existing roadways, and critical service roads are not inundated by more than three inches of water over one-half the roadway width under a 100-year flood event. (f) Easements. (i) All new development and redevelopment shall be designed and graded in such a way as to forbid stormwater from discharging onto adjacent property where not supported by adequate public infrastructure, easements, and rights-of-way. (ii) All new development and redevelopment shall be designed and graded so that a minimum ten-foot drainage easement and stormwater conveyance exist between each property. (iii) All new development and redevelopment shall be designed to provide a minimum 20-foot drainage easement on all stormwater infrastructure, including channels, serving more than two properties. (iv) No obstructions or encroachments which impede the flow of stormwater shall be permitted within public drainage easements. (v) The city is not responsible for repair or replacement of any encroachments that are damaged or removed in the course of maintenance activity within easements. (vi) Green infrastructure easements shall be required on all green infrastructure practices. A. Any and all activities within a green infrastructure easement, except as specifically permitted by notation on the current plat of record and/or within the recorded inspection and maintenance agreement, shall be strictly prohibited without the written consent of the city engineer or his designee. (vii) Public drainage easements shall be required on all stormwater management features. A. Public utility and/or drainage easements do not imply any ownership or Maintenance responsibility to the city, only to allow the city right-of-entry for inspection and maintenance if deemed necessary. Any type of alteration, building, construction, storage, blockage, or disturbance of any kind by the property owner(s) within the easement is strictly prohibited unless approved by the city engineer. (g) Erosion prevention and sediment control. All construction sites regardless of size or disturbed area shall follow proper EPSC practices to control unwarranted sediment from leaving a site. All construction sites receiving grading or stormwater permits from the City of Franklin shall be subject to the requirements outlined in the State of Tennessee's Construction General Permit, EPSC Handbook, the city stormwater BMP Manual, and this title (whichever is more stringent), including the following: (i) Construction shall only be permitted after temporary, or permanent EPSC management practices have been placed or constructed and are operational to the city's satisfaction, and a grading and/or stormwater management permit has been issued and signed by the city stormwater inspector. (ii) The design-storm for EPSC practices shall be as described in the City of Franklin Stormwater BMP Manual or the Tennessee EPSC Handbook and consistent with the Tennessee Construction General Permit. (iii) The city may require more stringent EPSC practices on properties adjacent to water resources with unavailable parameters, or within watersheds with water resources with unavailable parameters, watersheds with TMDLs, or sites in close proximity to water resources. This may include measures that limit or eliminate, with a greater safety factor, the potential for sediment or other forms of water pollution from entering sensitive areas as designated by TDEC or the city engineer. (iv) Unwarranted acceleration of erosion or sedimentation, or transport of other pollutants or forms of pollution, due to various land development activities shall be controlled. (v) If deemed appropriate, the city may require the addition, removal, or modification of EPSC measures and/or EPSC locations at any time during the construction process to ensure proper EPSC performance. (vi) The city may impose enforcement actions outlined in section 23-111 of this title if any site, development, or construction is found to be in violation of this title or the State of Tennessee's Construction General Permit in order to achieve EPSC compliance. (vii) The design-storm for erosion prevention and sediment control practices shall be as described in the City of Franklin Stormwater BMP Manual and consistent with the Tennessee General Construction Permit. (viii) Inlet protection shall be specified on all construction plans to include an overflow protection device. Other measures may be approved on a case-by-case basis by the city engineer. (ix) For priority construction activity the permittee shall schedule a pre-construction meeting with city staff prior to the commencement of work, city staff shall perform monthly inspections of the site, and city staff shall document related meetings and inspections. (h) Floodplain alterations. (i) Floodplain alterations or filling shall not cause a net decrease in flood storage capacity below the projected 100-year flood elevation unless it is shown that the proposed alteration or filling will not cause an increase in the high-water level, increase velocities, or aggravate flooding on other properties and will not unduly restrict flood flows. Any grading within floodplains shall result in a net volumetric compensatory cut of at least 150 percent (1.5:1.0) for all fill in floodplains. Floodplain may be used for application of water quality devices. This may only be permitted provided EPSC, water quality, and cut-fill policies are adequately addressed as determined by the city engineer according to the provisions in section 23-110 of this title. Detention/retention volumes in the floodplain shall count as fill if applied in a manner where floodplain storage is lost. (i) General stormwater regulations. (i) The city encourages regional stormwater management features, serving 40 to 300 acres of tributary area, which may be consistently and efficiently managed and maintained. These types of practices will be encouraged to replace or reduce the implementation of on-site stormwater management practices redevelopment of properties containing on-site stormwater management practices may be permitted, at the discretion of the city engineer, provided the property and downstream public and private properties, infrastructure or waters of the state are adequately protected by a regional stormwater management feature(s) from stormwater quantity or quality impacts. (ii) No development, redevelopment, construction, storage, grading, or alteration of property of any other kind, shall be performed in a manner that will cause increased runoff or flooding or negatively impact stormwater quantity or quality in upstream or downstream areas of public property. Areas deemed by the city engineer to be private drainage issues shall not be the responsibility of the city to enforce upon. (iii) New construction, development or redevelopment shall not aggravate upstream or downstream flooding. Existing downstream or upstream problems may be required to be corrected in conjunction with new development and redevelopment. (iv) In no instance shall new development or redevelopment cause or have the potential to cause water quality degradation to immediate or downstream water resources. (v) The construction and financing of any required off-site drainage improvement necessitated by private development within the same watershed shall be the responsibility of the developer. (vi) Under no circumstances shall a site be graded or drained in such a way as to change pre- versus post-runoff conditions, drainage areas, or volumes to sinkholes, dry wells, or drainage wells. (vii) Soil bioengineering, "green" and other "soft" slope and stream bank stabilization methods shall receive preference over riprap, concrete, and other hard armoring techniques. "Hard" alternatives shall only be permitted when their necessity can be demonstrated given site-specific conditions. (viii) The city may require maintenance or modification of stormwater management features that are not operating within the guidelines established by this title, as determined by the city engineer. (ix) The city encourages the use of greenway rights-of-way for appropriate properties. (x) As new development construction is completed, an "as-built" plan, certified by an engineer and/or land surveyor as appropriate, must be submitted upon completion of the stormwater management facilities included in the stormwater management plan. The licensed professional shall certify that: the facilities have been constructed as shown on the "as-built" plan, and facilities meet the approved stormwater management plan and specifications or achieve the function for which they were designed. Coordinate data shall be presented in the State of Tennessee Plane System with the North American Datum 1983 (NAD83) and North American Vertical Datum (NAVD) of 1988 (as added by Ord. No. 2001-53, 2002). (xi) Corrugated metal pipe shall not be allowed within the City of Franklin. Extensions of existing corrugated metal pipe shall not be allowed. Existing corrugated metal pipe shall be replaced in its entirety. (xii) No other structures, building, construction, storage, debris, vegetation, etc. except for those required for the proper function of the stormwater management feature shall be allowed within the stormwater management feature or within its associated easement width. (xiii) All stormwater management features for a site/section shall be installed within 90 days of issuance of a temporary certificate of use and occupancy (TCUO)/temporary certificate of completion (TCOC) and/or when a stormwater management features contributing drainage area is built out and/or stabilized (as determined by the sites stormwater inspector). Furthermore, stormwater control measures shall be inspected by a licensed professional engineer documenting the SCM's have been installed per the approved site plan. An inspection report documenting this shall be required to be submitted to the city's engineering department within 90 days of the SCM's completion. (j) Maintenance responsibility. (i) Any stormwater management feature or BMP which services individual property owners or subdivisions shall be privately owned with general routine maintenance (controlling vegetative grown and removing debris, or as otherwise defined in the recorded inspection and maintenance agreement) provided for by the owner(s). The owner shall maintain a perpetual, non-exclusive easement, which allows for access for inspection and other maintenance by the city. (ii) Any stormwater management feature or BMP which services an individual subdivision in which the feature or BMP is within designated open areas or an amenity with an established homeowners' association shall be privately owned and maintained consistent with provisions of this title. The owner shall maintain a perpetual, nonexclusive easement, which allows for access for inspection and emergency maintenance by the city. (iii) Any stormwater management feature or BMP which services commercial and industrial development shall be privately owned and maintained consistent with the provisions of this title. The city has the right, but not the duty to enter premises for emergency repairs through a perpetual nonexclusive easement. All stormwater management features proposed by the owners, if accepted by the city engineer and approved by the board of mayor and aldermen for dedication as a public regional stormwater management feature shall be publicly owned and maintained. (iv) All other stormwater management features shall be publicly owned and/or maintained only if accepted for maintenance by the city through a formal agreement recorded at the Williamson County, Tennessee, register of deeds. Existing or proposed public utility or drainage easements shall not constitute a formal agreement and shall not constitute any real or implied maintenance requirement upon or by the city. (v) The city engineer may require dedication of privately owned stormwater management features that discharge to the city's stormwater MS4 system. (vi) All stormwater BMPs shall be required to place maintenance signs approximately nine inches by twelve inches on or near BMPs in order to ensure identification and proper maintenance of features. (vii) An inspection and maintenance agreement for stormwater management facilities and long-term maintenance plan shall be submitted for review and approval by the city engineer and then recorded with the register of deeds for Williamson County, TN, for all stormwater management features, in new development and redevelopment that require more than general maintenance (i.e., mowing, weeding, etc.). Any subsequent site plan revisions, amendments, field changes, etc. shall require modification of both the IMA and the LTMP. The plan shall address through exhibits, schedules and techniques for inspections and maintenance of the facilities and devices. Documentation of the inspection schedule, times of inspection, remedial actions taken to repair, modify or reconstruct the system and the state of control measures shall be submitted by the owner to the city engineer on or before July 1 of each year. (3) Green infrastructure runoff reduction requirements. This section shall be effective for all development and redevelopment under the jurisdiction of this title submitted for plan review on or after January 1, 2014. (4) Pollutant removal. New development and redevelopment will be required to minimize the impact to stormwater quality by applying structural and/or nonstructural management practices selected to address site-specific conditions. New development and redevelopment that cannot meet 100 percent of the RRM must implement pollutant removal BMPs that are designed and constructed in accordance with the site design standards, criteria, and specifications for pollutant removal BMPs that are provided in the current City of Franklin Stormwater BMP Manual. The water quality treatment for the runoff resulting from a rainfall depth of 1.1 inches shall be a minimum of 80 percent total suspended solids (TSS) removal through appropriate use of BMP controls as detailed in the current City of Franklin BMP Manual.

(Ord. No. 2025-24, § I, 10-14-2025; Ord. No. 2026-01, §§ I—III, 4-28-2026)

Ask a question about Franklin law

Corpus searches the Franklin sections it holds and shows the ones that match, with their citations. Free, no sign-in.