Sec. 23-107. - Riparian resources buffer requirements.

(1) A riparian buffer shall be applied to all water resources located in, or adjacent to, new construction, development or redevelopment. There shall be no mowing, clearing, grading, construction, storage, or disturbance of vegetation except as permitted by the city engineer, his designee, or a sites approved buffer management plan. Final determination shall be made by the city engineer regarding riparian buffer delineation, top of bank, areas where the riparian buffer shall apply and riparian buffer width requirements. (2) Riparian buffer zones. The riparian buffer shall be applied in two zones: riparian zone 1 and riparian zone 2. All uses, other than those allowable in each zone, shall be prohibited. (a) Riparian zone 1. The riparian zone 1 shall begin at the top of bank of the water resource and extend a minimum of 30 linear feet perpendicular for water resources that have tributary area less than one square mile. This distance shall be 60 linear feet perpendicular from top of bank for water resources that drain one square mile or greater. (i) Allowable uses within zone 1: (A) Utility crossings according to subsection 23-107(5)(b) of this title. (B) Passive recreation, educational opportunities, natural trails, canoe launches, and boardwalks placed perpendicular to the top of bank and the riparian zone to approach the water resource as approved by the city engineer. (C) Stabilization practices to prevent channelization and erosion in the riparian buffer from stormwater runoff adjacent to the water resource. (D) Landscaping to allow for climax successional vegetation through the removal of exotic invasive vegetation and the establishment of native vegetation, and/or other practices that restore the ecological integrity of the riparian buffer. (E) Clearing of individual trees or limbs within the riparian buffer which have the potential of causing damage to dwellings or other structures, or causing blockage of the water resource. An arborist certification may be required in order to determine tree health in some circumstances. Riparian buffer mitigation of the riparian buffer shall be required if disturbance to soil or vegetation occurs. (F) Existing structures or impervious surface approved on prior site plans. This does not apply to modified existing surface. (ii) Riparian zone 1—Special conditions. Riparian zone 1 widths shall vary depending on the tributary area of the water resource, location of water pollution hazards, or steep slopes. The following riparian zone 1 widths shall apply: (A) For certain land uses and/or activities designated as potential water pollution hazards: 1. Drain fields from on-site sewage disposal and treatment systems (i.e., septic systems) require 100 feet. 2. Land application of biosolids requires 100 feet. 3. Subsurface discharge from a wastewater treatment plant requires 100 feet. 4. Above ground or underground petroleum storage or storage of hazardous substance facilities require 150 feet. 5. Raised septic systems require 250 feet. 6. Solid waste landfills or junkyards require 300 feet. (B) For areas containing steep slopes: 1. Where the average slope of the land within the riparian zone 1 is between 15 percent and 25 percent, an additional 20 feet shall be added to the minimum riparian buffer width. 2. Where the average slope of the land within the riparian zone 1 is greater than 25 percent, an additional 50 feet shall be added to the minimum riparian buffer width. (b) Riparian zone 2. A riparian zone 2 shall be applied to water resources that drain less than one square mile. The riparian zone 2 shall begin at the edge of the riparian zone 1 (which includes any additional width as specified above in "riparian zone 1—special conditions") and extend 30 linear feet perpendicular to riparian zone 1. (i) Allowable uses within riparian zone 2. (A) Those uses allowed in riparian zone 1. (B) Biking or hiking paths, trails, and greenways. View corridors shall be allowed along greenways as approved by the city engineer. These shall be designed to prevent the channelization of stormwater runoff. Stormwater quality and quality requirement may be required if constructed of impervious materials. The water resource riparian buffer width shall be increased by the width of impact associated with the path, greenway, or trail. (C) Limited passive recreation. (D) Changes to existing stormwater channels. (3) Riparian buffer ENHANCEMENT. Evaluation of the current riparian buffer conditions shall be required in riparian buffer zone 1 and riparian buffer zone 2 areas of the riparian buffer and from top of bank to water edge on all water resources. This is to ensure the preservation and propagation of the riparian buffer areas and to provide the necessary conditions to ensure proper water resource function. If the riparian areas are found to be in any other vegetative state than that outlined below, then the riparian buffers shall be enhanced. Reference the Tennessee Urban Riparian Buffer Handbook for guidance and more information. (a) Vegetative state. (i) The riparian buffer shall be enhanced to allow for climax successional vegetation through the establishment of native vegetation and the removal of exotic invasive vegetation. The native vegetation established shall be consistent with that of an undisturbed forest ecosystem with all classes of vegetation equally represented. Where appropriate the riparian buffer may be enhanced to allow for a native riparian meadow ecosystem to be established. (ii) The riparian buffer shall consist of native vegetation along both sides of a water resource measured linearly perpendicular from top of bank. (iii) Riparian buffers shall be maintained perpetually on all properties in a manner that allows for growth of climax successional vegetation. (iv) No clearing of existing native vegetation in the riparian zones shall be allowed, except as permitted in subsection 23-107(3) of this title. (b) Riparian buffer management plans. Proposals for enhancement to restore the ecological integrity of the riparian buffer shall be submitted as a riparian buffer management plan to the city engineer during the development and site plan review process, and any pertinent local, state, or federal permits shall be obtained. The city engineer shall approve the specific requirements of such plan prior to site plan approval or the issuance of a grading and stormwater permit or grading permit. (4) Stream relocations. Stream relocations shall only be permitted in rare circumstances where the need to address a highly unstable hydrological condition can be clearly demonstrated by the following: (a) The applicant shall apply for a variance pursuant to chapter 3 of this title. (b) The relocation shall create a high-quality aquatic habitat, restore natural flow regimes and natural streamside conditions, and shall result in overall water quality improvements. (c) The applicant shall submit a riparian buffer management plan and long-term maintenance plan as prescribed in the grading and stormwater management permit requirements. A copy of any applicable federal or state permits shall be supplied to the city engineer prior to the commencement of relocation. (5) Riparian buffer width averaging, clearing activities, and crossings. (a) The riparian buffer zone 2 width may be averaged in limited areas in conjunction with targeted restoration plans that make comparable improvements to both the ecological integrity within the riparian buffer and water quality of the water resource. Restoration plans may include stream bank restoration, revegetation, habitat improvements, or other bioengineering methods, as approved in a riparian buffer management plan by the city engineer, or his designee. Averaging of the riparian buffer zone 2 width in limited areas may be applied to specific areas of an overall development and shall be approved on a case-by-case basis (in no case shall averaging be allowed in the zone 1 riparian buffer). Averaging shall occur on the same water resource and on the same side of the water resource as the encroachment. Riparian buffers shall be evenly averaged in limited areas and shall be placed in areas that provide the same water quality and ecological water resource benefit. Averaging request shall demonstrate the same practical difficulty as a variance request outlined in subsection 23-304(3)(a). (b) Riparian buffer crossings shall be approved by the city engineer, or his designee on a case-by-case basis. Attempts should be made to limit the number and width of road and utility crossings across water resources. Utilities shall be located under pavement where possible. Riparian buffer crossings shall be approved in a riparian buffer management plan by the city engineer, or his designee. (i) Above and underground utilities such as, but not limited to, sanitary sewer mains, water mains, gas, electric, phone, and internet shall be located outside of the riparian buffer except for crossings. (ii) Crossing water resources with utilities shall be minimized and shall cross with road crossings where possible. If crossings at roads is impractical, the utility shall cross perpendicular, ± 15 degrees to the water resource. Riparian buffer encroachment due to impacts from crossing activities shall be averaged or mitigated on a 1:1 basis on-site. Note that such crossings may still require federal, state, and/or local permits. (iii) The city engineer, or his designee, may approve new driveways or road crossings through or across riparian buffer zones on a case-by-case basis. It shall be demonstrated that access across the riparian buffer is necessary and that the riparian buffer will not be impacted excessively. In these cases, the driveway or road crossing shall be constructed perpendicular, ± 15 degrees, to the water resource and/or riparian buffer with careful detail to protecting trees and vegetation and minimizing site grades. Crossings shall utilize a spanning open bottom culvert with footings located outside of the stream and embankments. Stream encapsulations shall be prohibited. Riparian buffer square footage lost due to impacts from crossing activity shall be mitigated on a 1:1 basis on-site. Note that such crossings may still require federal, state, and/or local permits. (6) Development plan, site plan and construction activity requirements. (a) The parameters of the riparian buffer shall be delineated by the applicant prior to the pre-application phase of a development submittal. A riparian buffer management plan shall be required for any project that contains water resources and riparian buffers. The riparian buffer management plan shall show all riparian buffer encroachments, averaging, mitigation, offsets, comparable improvements to water quality and any riparian buffer enhancements outlined in subsection 23-107(3). (b) Riparian buffer boundaries shall be clearly indicated on all plats and plans including development plans, regulating plans, site plans, conservation subdivisions, preliminary plats, final plats, as well as permits and official maps, and shall: (i) Show the extent of any riparian buffer on the subject property and clearly label as "riparian buffer" along with the required riparian buffer zone and width. (ii) Provide a note to reference the riparian buffer, labeled as: "There shall be no mowing, clearing, grading, construction, storage, or disturbance of vegetation in riparian buffers except as permitted by the city engineer, or his designee." (iii) Provide a note to reference protective covenants governing all riparian buffer areas, labeled as: "Any riparian buffer is subject to protective covenants recorded in the register of deeds (Williamson County). Disturbance and use of these areas is restricted; severe penalties apply." (iv) Offset five feet from any structure(s) including but not limited to buildings, parking lots, SCMs, roads, drive aisles, outfalls, EPSC measures, bridges, culverts, retaining walls, channels, etc., unless it can be demonstrated that the construction of the structure can be accomplished without encroachment into the riparian buffer. (c) Riparian buffer areas shall be protected during all development activities. Construction layout survey shall include fencing and labeling of the riparian buffer areas. Use of a combination of fencing and flagging to ensure adequate visibility shall be required. Riparian buffer boundaries shall be marked with signs that persist before, during, and after construction to prevent entry of construction equipment, storage, and stockpiling. (d) Permanent boundary markers, in the form of signage approved by the city engineer, or his designee, shall be installed prior to the issuance of a grading and stormwater permit. Signage shall be posted and clearly observable at the edge of the riparian buffer, each lot line, and at a maximum spacing of 150 feet. Properties with a large amount of riparian buffer frontage may request a reduction in spacing requirements, subject to approval from the city engineer, or his designee. The size of the sign shall be a 12 inch by 18 inch rectangle or greater and shall contain the message, "Riparian Buffer Do Not Disturb" or other language approved by the city engineer, or his designee. (e) All riparian buffers shall be placed in open space lot to be maintained per section 23-108 of this chapter. Commercial developments shall be allowed to place riparian buffers in a riparian buffer conservation easement in lieu of open space lots. (f) Stormwater management features shall not be allowed or placed within the riparian buffer. All concentrated flow from stormwater management features shall be converted to sheet flow before entering the riparian buffer or water resources. (7) Enforcement procedures. (a) Any person violating the provisions of this chapter shall be subject to the penalties set forth in section 23-111 of this title. (b) Riparian buffers shall be actively managed with periodic buffer surveys. Violators shall be served with civil penalties per subsection 23-111(4)(d) of this chapter and shall be required, at their own expense, to revegetate, according to an approved Riparian Buffer Management Plan, and maintain the section of the riparian buffer encroached upon, using only plants from a list of native vegetation provided by the city engineer. Equivalent native plants and trees that were removed shall be replaced on a tree per tree basis or as approved by the city engineer, or his designee. Specimen trees shall be replaced as required by the city's zoning ordinance. (8) Variance and appeal procedures. Variance and appeal requests shall be submitted pursuant to section 23-301 et seq. of this title. (9) Other requirements. If deemed appropriate by the city engineer, or his designee, during the plan review process, each new development shall evaluate water resource conditions and shall be required to address the following: (a) Stabilization and/or restoration within or adjacent to the water resource. (b) Additional water quality protection. (c) Channel erosion. (d) Stream pollution. (e) Habitat degradation.

(Ord. No. 2025-24, § I, 10-14-2025)