§ 12-52 — Specific standards
Code of Ordinances, City of Knoxville, Tennessee (Supplement 81; codified through Ordinance O-51-2026, June 23, 2026; online September 9, 2026; later unincorporated ordinances excluded) · Knoxville Code of Ordinances § 12-52
Corpus is an independent public-information project, not the official City of Knoxville website. Stable reference: corpuslaw.us/code/7c3feaad-183f-45d7-9abd-9eeb53b04b19
Sec. 12-52. - Specific standards.
In all special flood hazard areas, the following provisions, in addition to those set forth in section 12-5, are required: (1) Residential construction. In AE and shaded X zones where base flood elevation data is available, new construction or substantial improvement of any residential building (or manufactured home) shall have all utilities (including electrical (utility meters not included), heating, ductwork, ventilating, plumbing, and air conditioning equipment) and the lowest floor, including basement, elevated to no lower than one (1) foot above the base flood elevation. Along any TVA dam-controlled river (Tennessee, French Broad, Holston), new construction and/or substantial improvement of any commercial, industrial, or nonresidential building in AE and/or shaded X zones when base flood elevation data is available, shall have all utilities (including electrical (utility meters not included), heating, ductwork, ventilating, plumbing, and air conditioning equipment) and the lowest floor, including basement, elevated to no lower than three (3) feet above the one (1) percent annual chance flood. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls and to ensure the unimpeded movement of floodwaters shall be provided in accordance with standards of article III, section 12-52(3). Within approximate A zones, where baseflood elevations have not been established and where alternative data is not available, the ordinance administrator shall require the lowest floor of a building to be elevated to a level of at least three (3) feet above the highest adjacent grade (lowest floor and highest adjacent grade being defined in section 12-3.1 of this chapter). All applicable data including elevations or floodproofing certifications shall be recorded as set forth in article II, section 12-32. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with the standards of subsection (2). (2) Nonresidential construction. In AE and shaded X zones, new construction and/or substantial improvement of any commercial, industrial, or nonresidential building, when base flood elevation data is available, shall have all utilities (including electrical (utility meters not included), heating, ductwork, ventilating, plumbing, and air conditioning equipment) and the lowest floor, including basement, elevated or floodproofed to no lower than one (1) foot above the level of the base flood elevation. Along any TVA dam-controlled river (Tennessee, French Broad, Holston), new construction and/or substantial improvement of any commercial, industrial, or nonresidential building in AE and/or shaded X zones when base flood elevation data is available, shall have all utilities (including electrical (utility meters not included), heating, ductwork, ventilating, plumbing, and air conditioning equipment) and the lowest floor, including basement, elevated or floodproofed to no lower than three (3) feet above the one (1) percent annual chance flood. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with the standards of subsection (2). Within approximate A zones, where base flood elevations have not been established and where alternative data is not available, new construction and substantial improvement of any commercial, industrial, or non-residential building shall have the lowest floor of a building, including the basement, to be elevated or floodproofed to a level of at least three (3) feet above the highest adjacent grade (lowest floor and highest adjacent grade being defined in section 12-3.1 of this chapter). Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with the standards of subsection (2). Non-residential buildings located in all A zones may be floodproofed in lieu of being elevated, provided that all areas of the building below the required elevation are watertight with walls substantially impermeable to the passage of water, and are built with structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effects of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above and shall provide such certification to the ordinance administrator as set forth in article II, section 12-32(2). (3) Standards for manufactured homes and recreational vehicles. a. All manufactured homes placed, or substantially improved, on: 1. Individual lots or parcels; 2. In expansions to existing manufactured home parks or subdivisions; or 3. In new or substantially improved manufactured home parks or subdivisions; must meet all the requirements of new construction, including elevations and anchoring. b. All manufactured homes placed or substantially improved in an existing manufactured home park or subdivision must be elevated so that either: 1. In AE and shaded X zones with base flood elevations, the lowest floor of the manufactured home is elevated on a permanent foundation no lower than one (1) foot above the level of the base flood elevation; or 2. Along any TVA dam-controlled river (Tennessee, French Broad, Holston) in AE and shaded X zones with base flood elevations, the lowest floor of the manufactured home is elevated on a permanent foundation no lower than three (3) feet above the one (1) percent annual chance flood; or 3. In approximate A zones without base flood elevations, the manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of equivalent or greater strength) at least three (3) feet in height above the highest adjacent grade. (4) Standards for subdivisions and other proposed new development proposals. Subdivisions and other proposed new development, including manufactured home parks, shall be reviewed to determine whether such proposals will be reasonably safe from flooding. a. All subdivisions and other proposed new development proposals shall be consistent with the need to minimize flood damage. b. All subdivisions and other proposed new development proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize or eliminate flood damage. c. All subdivisions and other proposed new development proposals shall have adequate drainage provided to reduce exposure to flood hazards. d. In all approximate A zones, base flood elevation data shall be provided by the project engineer for subdivision proposals and other proposed development (including manufactured home parks and subdivisions), which are greater than fifty (50) lots or five (5) acres in area.
(Ord. No. O-112-2013, § 1, 6-25-13; Ord. No. O-97-2019, § 3, 7-2-19; Ord. No. O-170-2020, § 7, 11-17-20; Ord. No. O-51-2023, § 3, 3-21-23)
Ask a question about Knoxville law
Corpus searches the Knoxville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
