For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33-36 — Use of the public sewers

Code of Ordinances, City of Murfreesboro, Tennessee (Supp. No. 18: codified through Ordinance No. 26-O-38, enacted September 17, 2026) · Murfreesboro City Code § 33-36

Corpus is an independent public-information project, not the official City of Murfreesboro website. Stable reference: corpuslaw.us/code/b014558e-932d-4d49-a791-2e771e0402d0

Section 33-36 - Use of the public sewers.

(A) Prohibited discharges. (1) General Prohibitions. No User shall introduce or cause to be introduced into the POTW any pollutant or wastewater which causes Pass Through or Interference. These general prohibitions apply to all Users of the POTW whether or not they are subject to categorical Pretreatment Standards or any other National, State, or local Pretreatment Standards or Requirements. (2) Discharge of wastes having any of the following characteristics to the public sanitary sewer is specifically prohibited: (a) Any liquid or vapor having a temperature higher than 150 degrees (150°) Fahrenheit or in any combination of temperature and volume sufficient to raise the temperature of the wastewater plant influent to 100 degrees (100°) Fahrenheit (38 degrees (38°) centigrade) or which will inhibit biological activity in the treatment plant resulting in Interference. (b) Any water or waste which may contain more than 100 mg/L by weight of petroleum, mineral, silicon, nonbiodegradeable cutting oil, or other oil, wax or grease, whether emulsified or not, or containing any substances which may solidify or become viscous at temperatures between 32 degrees (32°) Fahrenheit and 150 degrees (150°) Fahrenheit at the point of discharge into the sewage system, or in concentrations which may cause interference or Pass Through. (c) Fats, oils, or greases of animal or vegetable origin in concentrations greater than 300 mg/L or in any such quantities that they interfere with the operation of the collection system or POTW, or become a removal problem at the POTW. (d) Pollutants which may create a fire or explosive hazard in the collection system or POTW, including, but not limited to, wastestreams with a closed-cup flashpoint of less than 140 degrees F (60 degrees C) using the test methods specified in 40 CFR 261.21. (e) Any garbage that has not been properly shredded. The use of garbage disposals by restaurants, institutional and/or commercial kitchens or food wholesalers or retailers is specifically prohibited. (f) Any ashes, cinders, sand, mud, straw, shavings, metal, glass, rags, hair, feathers, tar, plastics, wood, paunch manure, or any solid or viscous substance capable of causing obstruction to the flow in sewers which may result in any Interference, or cause other interferences with the proper operation of the lift stations or treatment plant, or the disposal of effluent or solids produced during treatment. (g) Any water or waste having a pH lower than 5.5 or higher than 10.5 or having any other corrosive property capable of causing damage or hazard to structures, equipment, personnel or the sewage works. (h) Any water and waste containing a toxic or poisonous substance in amounts exceeding standards established by the Environmental Protection Agency pursuant to Section 307(a) (b) or (c) of the Act or contained in 40 CFR 403.5.02. (i) Any water or waste which singularly or in combination with other substances in the sewage may result in the presence of toxic gases, vapors or fumes within the collection system or POTW in a quantity that may cause workers health and safety problems. (j) Any trucked or hauled pollutants except at discharge points given by written approval is granted by the Director. (k) Any radioactive wastes or isotopes of such half-life or concentration that they do not comply with regulations or orders issued by the appropriate authority having control over their use or which may be hazardous to plant facilities or personnel or which interfere with the reuse or disposal of effluent or solids produced by the treatment processes. (l) Any discharge which imparts color which cannot be removed by the normal and customary treatment processes of the POTW, such as, but not limited to, dye and ink wastes, vegetable tanning solutions, etc., which consequently imparts color to the POTW effluent. (m) Any pollutant including pollutants from any single User in excess of 1,700 pounds per day of BOD, or 1,700 pounds of suspended solids per day, or 300 pounds of edible oils per day, or 135 pounds of ammonia nitrogen per day, or any amount released at a flow rate and/or pollutant concentrations which either singly or by interaction with other pollutants will cause Interference or Pass Through violation at the POTW. (n) Any material which creates a hazard to the workers in the sanitary sewer system or treatment plant, including, but not limited to, medical and other sharps, infectious agents, toxins, or explosive agents. (o) No person shall discharge or cause to be discharged any storm water, surface water, ground water, roof runoff, subsurface drainage, cooling water or unpolluted industrial process water to any sanitary sewer. Storm water and all other unpolluted drainage shall be discharged to such sewers as are specifically designated as storm sewers, or to a natural outlet approved by the Director. Industrial cooling water or unpolluted process water may be discharged to a storm sewer upon approval of the Director or, when available, to a natural outlet subject to the NPDES permit conditions. (p) Fats, oils, or greases of animal or vegetable origin in concentrations greater than 300 mg/L or in any such quantities that they interfere with the operation of the collection system or POTW, or become a removal problem at the POTW (q) Intermittent slugs, or short time — high volume discharges, at such discharge rates or concentrations as to overload either the public sewers or the treatment facilities. The Industrial User shall notify the POTW immediately of any slug loading, as defined in Code § 33-32(B)(37). When grab samples indicate that slug loading has occurred, the Industrial User shall be liable for excessive strength surcharges or penalties as described in Code §§ 33-1 and 33-40. (r) The discharge of waste that would be otherwise considered hazardous waste or require the hazardous waste discharge notifications required in Tennessee rule 1200-4-14-.12(16). (B) Regulated Discharges: (1) Waste having any of the following characteristics may be accepted only under such conditions and/or limitations as may be established by the Director. (a) Any water or waste containing ammonia nitrogen, BOD, edible oils, suspended solids or any other constituents of such character or quantity that unusual attention or expense is required to handle or treat such constituents at the POTW. (b) Any waters or wastes having noxious or malodorous substances which either alone or in combination with other substances which may be present in the wastewater may cause an offensive odor or public nuisance. (c) Hauled septage may be discharged only at the POTW receiving station subject to the fees and conditions set forth in this article, and in conformance with the rules and policies of the Water Resources Department. [1] Types of Hauled Septage Accepted: [aa] Residential Septic tank pumpage. [bb] Sanitary wastes from holding tanks. [cc] Special wastes with prior approval. [2] Septage Hauler Permit Required: [aa] All haulers are required to possess a valid Discharge Permit prior to being allowed to discharge. Failure to adhere to the terms of the permit may result in penalties and/or suspension or revocation of the permit. [bb] Permits and renewals may be issued upon submission of completed application, required fees and satisfactory evidence of vehicle insurance. [cc] Permit renewals will not be issued to haulers who fail to comply with the terms and conditions set forth in the permit, City ordinance or state and federal statutes. [dd] The Permit holder shall immediately notify the City in writing of any changes in the business name, ownership, address, telephone number or registered vehicle. Changes to vehicles include addition, replacement, deletion or modification of the capacity of the registered vehicles. [ee] A copy of the Hauled Septage Permit shall be carried in each registered vehicle. [3] Vehicle Registration Required: [aa] Every vehicle used by the hauler to haul liquid wastes must be registered with the City. Registration shall include the make, model, tank capacity and license number of the vehicle. [bb] Each registered vehicle shall be issued a special discharge permit sticker which must be attached to the upper left corner of the windshield. [cc] Vehicles used to haul or store hazardous materials, petroleum products or petroleum derivative wastes, corrosives or toxic wastes are specifically prohibited. [4] Hauled Septage Prohibited Materials: [aa] In the case of multiple pump outs in a single load, any part of the load which is prohibited shall render the entire load unacceptable. [bb] Any wastes containing flammable, explosive, corrosive, or toxic material(s). [cc] Any wastes containing material(s) which may be inhibitory to the processes at the wastewater treatment plant, or which may result in a Pass Through violation in the plant effluent. [dd] Grease trap wastes, or other wastes containing floatables or materials which may exceed the capacity of the treatment plant. [ee] Any solids or other materials which may solidify and cause blockage or handling problems in the system. [ff] Wastes from portable toilets that contain formaldehyde or formalin based deodorizers. [gg] Groundwater from remedial or reclamation sites. [hh] Wastes from outside Rutherford County. [ii] The City reserves the unconditional right to accept or reject any hauled materials as it deems necessary to protect its employees, facilities, treatment processes or effluent quality. [5] Manifests Required for All Hauled Septage: [aa] Haulers must complete and submit a manifest for each load discharged, identifying the exact source(s) of the hauled material, including name, complete address, telephone number, waste characteristics, and approximate gallons for each site pumped, as well as the permit number of the hauler, vehicle license number and signature of the driver. [bb] Any haulage that does not originate from a single-family dwelling must include the generator's signature. [cc] Manifests shall conform to the sample provided by the Department, are due on the day of discharge to the sanitary system, and should be deposited in the receptacle provided at the receiving station. [6] Hauled Septage Fees: [aa] Fees shall be established and approved by City Council for activities related to septage hauling, including permit application and renewal, vehicle registration, and discharge to the POTW. [bb] Laboratory analysis fees shall be assessed in accordance with Code § 33-42 when evidence indicates that the permit holder has discharged prohibited materials. (d) Any waters or wastes which may violate pretreatment standards as adopted by EPA or any modification thereof which may be permitted by approval authorities. (e) Any waters or wastes having toxic, poisonous or incompatible pollutants in such quantities as to constitute a hazard to humans or animals, be deleterious to pipelines or structures, interfere with treatment processes or cause the treatment plant to violate its NPDES permit or applicable receiving water standards. (C) National Categorical Pretreatment Standards - Users must comply with the categorical Pretreatment Standards found at 40 CFR Chapter I, Subchapter N, Parts 405—471. (1) Where a categorical Pretreatment Standard is expressed only in terms of either the mass or the concentration of a pollutant in wastewater, the Director may impose equivalent concentration or mass limits in accordance with Section 33-36(C)(4). (2) When the limits in a categorical Pretreatment Standard are expressed only in terms of mass of pollutant per unit of production, the Director may convert the limits to equivalent limitations expressed either as mass of pollutant discharged per day or effluent concentration for purposes of calculating effluent limitations applicable to individual Industrial Users. (3) When wastewater subject to a categorical Pretreatment Standard is mixed with wastewater not regulated by the same Standard, the Director may impose an alternate limit in accordance with 40 CFR 403.6(e). (4) When a categorical Pretreatment Standard is expressed only in terms of pollutant concentrations, an Industrial User may request that the City convert the limits to equivalent mass limits. The determination to convert concentration limits to mass limits is within the discretion of the Director. The City may establish equivalent mass limits only if the Industrial User meets all the conditions set forth in Sections 33-36(C)(4)(a)[1] through 33-36(C)(4)(a)[5] below. (a) To be eligible for equivalent mass limits, the Industrial User must: [1] Employ, or demonstrate that it will employ, water conservation methods and technologies that substantially reduce water use during the term of its individual wastewater discharge permit; [2] Currently use control and treatment technologies adequate to achieve compliance with the applicable categorical Pretreatment Standard, and not have used dilution as a substitute for treatment; [3] Provide sufficient information to establish the facility's actual average daily flow rate for all wastestreams, based on data from a continuous effluent flow monitoring device, as well as the facility's long-term average production rate. Both the actual average daily flow rate and the long-term average production rate must be representative of current operating conditions; [4] Not have daily flow rates, production levels, or pollutant levels that vary so significantly that equivalent mass limits are not appropriate to control the Discharge; and [5] Have consistently complied with all applicable categorical Pretreatment Standards during the period prior to the Industrial User's request for equivalent mass limits. (b) An Industrial User subject to equivalent mass limits must: [1] Maintain and effectively operate control and treatment technologies adequate to achieve compliance with the equivalent mass limits; [2] Continue to record the facility's flow rates through the use of a continuous effluent flow monitoring device; [3] Continue to record the facility's production rates and notify the Director whenever production rates are expected to vary by more than 20 percent from its baseline production rates determined in paragraph 2.2F(1)(c) of this Section. Upon notification of a revised production rate, the Director will reassess the equivalent mass limit and revise the limit as necessary to reflect changed conditions at the facility; and [4] Continue to employ the same or comparable water conservation methods and technologies as those implemented pursuant to paragraphs 2.2E(1)(a) of this Section so long as it discharges under an equivalent mass limit. (c) When developing equivalent mass limits, the Director: [1] Will calculate the equivalent mass limit by multiplying the actual average daily flow rate of the regulated process(es) of the Industrial User by the concentration-based Daily Maximum and Monthly Average Standard for the applicable categorical Pretreatment Standard and the appropriate unit conversion factor; [2] Upon notification of a revised production rate, will reassess the equivalent mass limit and recalculate the limit as necessary to reflect changed conditions at the facility; and [3] May retain the same equivalent mass limit in subsequent individual wastewater discharger permit terms if the Industrial User's actual average daily flow rate was reduced solely as a result of the implementation of water conservation methods and technologies, and the actual average daily flow rates used in the original calculation of the equivalent mass limit were not based on the use of dilution as a substitute for treatment pursuant to Section 2.6. The Industrial User must also be in compliance with Section 13.3 regarding the prohibition of bypass. (5) The Director may convert the mass limits of the categorical Pretreatment Standards of 40 CFR Parts 414, 419, and 455 to concentration limits for purposes of calculating limitations applicable to individual Industrial Users. The conversion is at the discretion of the Director. When converting such limits to concentration limits, the Director will use the concentrations listed in the applicable subparts of 40 CFR Parts 414, 419, and 455 and document that dilution is not being substituted for treatment as prohibited by paragraph 2.6 of this ordinance (see 40 CFR 403.6(d)). In addition, the Director will document how the equivalent limits were derived for any changes from concentration to mass limits, or vice versa, and make this information publicly available (see 40 CFR 403.6(c)(7)). (6) Once included in its permit, the Industrial User must comply with the equivalent limitations developed in lieu of the promulgated categorical Standards from which the equivalent limitations were derived (see 40 CFR 403.6(c)(7)). (7) Where categorical Pretreatment Standards specify one limit for calculating maximum daily discharge limitations and a second limit for calculating maximum Monthly Average, or 4-day average, limitations, the same production or flow figure shall be used in calculating both the average and the maximum equivalent limitation. (D) State Pretreatment Standards. Users must comply with Tennessee Department of Environment and Conservation Pretreatment Standards Rules Chapter 1200-04-14. (E) Industrial User Production Levels. Any Industrial User operating under a permit incorporating equivalent mass or concentration limits calculated from a production-based Standard shall notify the Director within two business days after the User has a reasonable basis to know that the production level will significantly change within the next calendar month. Any User not notifying the Director of such anticipated change will be required to meet the mass or concentration limits in its permit that were based on the original estimate of the long term average production rate (see 40 CFR 403.6(c)(9)). (F) Local Limits. (1) The Director is authorized to establish instantaneous, Daily Maximum or Monthly Average Local Limits pursuant to 40 CFR 403.5(c). The ability of the wastewater treatment facility to function effectively and meet effluent limitations is contingent upon the incoming wastewater flow being within the Plant Protection Criteria parameters. Additional substances may be added to the Plant Protection Criteria whenever there is a reason to suspect the presence of such substances in quantities such as to interfere with the proper functioning of the treatment facility or its ability to meet effluent standards or when the effluent limits for discharge of wastewater plant effluent are changed. Policies for the control of regulated discharges in order to achieve and maintain plant protection criteria shall be proposed by the Director and recommended by the Board to the City Council, which shall adopt them by resolution. Such policies shall include provision for any regulated discharger to request and receive a hearing before the Board in regard to establishment of discharge conditions or violations thereof. The Director may impose mass limitations in addition to the concentration-based limitations of the adopted Plant Protection Criteria. (2) Grease, oil and sand interceptors and grease bins shall be provided when, in the opinion of the Director, they are necessary for the proper handling of liquid wastes containing grease in excessive amounts, or any flammable wastes, sand and other harmful ingredients; except that such interceptors shall not be required for private living quarters or dwelling units. Each interceptor shall be of a type and capacity specifically approved by the Director and shall be located in a site specifically approved by the Director. Grease and oil interceptors shall be constructed of impervious materials capable of withstanding abrupt and extreme changes in temperature. They shall be of substantial construction, watertight and equipped with easily removable covers, which, when bolted in place shall be gas tight and watertight. Where installed, all grease, oil and sand interceptors shall be maintained by the owner, at the owner's expense, in continuously efficient operation at all times. Whenever blockages occur downstream from the owner, the Director may require the owner to submit regular reports of pumping grease, oil and sand interceptors, or other actions taken by the owner to alleviate reoccurrence. (3) Accidental Discharge/Slug Discharge Control Plans. The Director shall evaluate whether each SIU needs an accidental discharge/slug discharge control plan or other action to control Slug Discharges, and may require any User to develop, submit for approval, and implement such a plan or take such other action that may be necessary to control Slug Discharges. Alternatively, the Director may develop such a plan for any User. An accidental discharge/slug discharge control plan shall address, at a minimum, the following: (a) Description of discharge practices, including non-routine batch discharges; (b) Description of stored chemicals, including quantities and chemical properties; (c) Procedures for immediately notifying the Director of any accidental or Slug Discharge, which include the permanent posting on the User's bulletin board or other prominent place advising employees to call the POTW in the event of such discharge and listing the current telephone number for the POTW. Employers shall ensure that all employees, who could cause such a discharge to occur, are advised of the emergency notification procedure. (d) Procedures to prevent adverse impact from any accidental or Slug Discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents, and/or measures and equipment for emergency response. All production facilities, including chemical storage areas, shall be open to inspection by the Director as required. (e) Significant Industrial Users are required to notify the Director immediately of any changes at its facility affecting the potential for a Slug Discharge. (4) Right of Revision. The City reserves the right to establish, by ordinance or in individual wastewater discharge permits, more stringent standards or requirements on discharges to the POTW consistent with the purpose of this chapter. (5) Dilution. No User shall ever increase the use of process water, or in any way attempt to dilute a discharge, as a partial or complete substitute for adequate treatment to achieve compliance with a discharge limitation unless expressly authorized by an applicable Pretreatment Standard or Requirement. The Director may impose mass limitations on Users who are using or suspected of using dilution to meet applicable Pretreatment Standards or Requirements or in other cases when the imposition of mass limitations is appropriate. (G) Discharge Permit Required. (1) Each Industrial User proposing to discharge to the sanitary sewer wastes of any description, exclusive of sanitary wastes, shall file with the Director an application for the discharge of such wastes at least 90 days prior to the commencement of discharge. (2) An Industrial User Discharge Permit shall be: (a) Issued for a specified time period, not to exceed five years from the effective date of the permit, or may be issued for a period less than five years, at the discretion of the Director. Each IUDP will indicate a specific date upon which it will expire. (b) Such permit is nontransferable unless it meets the requirements set forth in Code § 33-36(G)(10). (c) The permit shall specify effluent limits, concentration, and/or mass loading limits, including Best Management Practices based on applicable general pretreatment standards in TN Rule 1200-4-14-08(6)(a)3.(iii). (d) Self-monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include an identification of pollutants (or best management practice) to be monitored, sampling location, sampling frequency, and sample type based on Federal, State, and local law. (e) A statement of applicable civil and criminal penalties for violation of Pretreatment Standards and Requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable Federal, State, or local law. (f) Requirements to control Slug Discharge, if determined by the Director to be necessary. (g) Individual Wastewater Discharge Permit Application Contents: [1] All Users required to obtain an individual wastewater discharge permit must submit a permit application. The Director may require Users to submit all or some of the following information as part of a permit application: [aa] Identifying Information: (i) The name and address of the facility, including the name of the operator and owner. (ii) Contact information, description of activities, facilities, and plant production processes on the premises; [bb] Environmental Permits. A list of any environmental control permits held by or for the facility. [cc] Description of Operations. (i) A brief description of the nature, average rate of production (including each product produced by type, amount, processes, and rate of production), and standard industrial classifications of the operation(s) carried out by such User. This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes; (ii) Types of wastes generated, and a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW; (iii) Number and type of employees, hours of operation, and proposed or actual hours of operation; (iv) Type and amount of raw materials processed (average and maximum per day); (v) Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge; [dd] Time and duration of discharges; [ee] The location for monitoring all wastes covered by the permit; [ff] Flow Measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in Tennessee Rule 1200-4-14-.06(5). [gg] Measurement of Pollutants. (i) The categorical Pretreatment Standards applicable to each regulated process and any new categorically regulated processes for Existing Sources. (ii) The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the Standard or by the Director, of regulated pollutants in the discharge from each regulated process. (iii) Instantaneous, Daily Maximum, and long-term average concentrations, or mass, where required, shall be reported. (iv) The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in §§ 33-36 (G)(18) and 33-36(G)(19) of this ordinance. Where the Standard requires compliance with a BMP or pollution prevention alternative, the User shall submit documentation as required by the Director or the applicable Standards to determine compliance with the Standard. (v) Sampling must be performed in accordance with procedures set out in Section (G) (18) of this ordinance. [hh] Any other information as may be deemed necessary by the Director to evaluate the permit application. [ii] Incomplete or inaccurate applications will not be processed and will be returned to the User for revision. (3) An IUDP does not relieve the permittee of any responsibility for compliance with all Federal, State or Local pretreatment standards, including those which become effective during the term of the permit. (4) The expiration date of a permit shall be not construed as permission to exceed the limits set by the permit after the permit has expired. (5) It shall be the responsibility of existing Industrial Users to file new or updated data with the Director whenever: (a) The current permit period expires; (b) Prior to a substantial change in the volume or character of pollutants in their discharge, including the listed or characteristic hazardous waste for which the Industrial User has submitted initial notification under TN Rule 1200-4-14-.12(10). (c) Prior to any change of ownership or location. (6) Applications shall be filed on forms provided by the Director and shall include data on the raw materials used, finished products, process descriptions, chemicals used and stored, sources of process wastes proposed for discharge to the sanitary sewer, approximate number of employees, anticipated water consumption and proposed pretreatment. A baseline monitoring report shall accompany the permit if an Industrial User is classified as a new source or is subject to a new categorical regulation, and shall describe the average flows and concentrations of constituents, the pretreatment system and its operation, solvent management plans, and details for the disposal of solid and hazardous wastes. The application shall further describe the discharge rates and hours of operation. This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes, as well as site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge; a list of any environmental control permits held by or for the facility shall be appended to the application. (7) Confidential Information. Information and data on a User obtained from reports, surveys, wastewater discharge permit applications, individual wastewater discharge permits, and monitoring programs, and from the Director's inspection and sampling activities, shall be available to the public without restriction, unless the User specifically requests, and is able to demonstrate to the satisfaction of the Director that the release of such information would divulge information, processes, or methods of production entitled to protection as trade secrets under applicable State law. Any such request must be asserted at the time of submission of the information or data. When requested and demonstrated by the User furnishing a report that such information should be held confidential, the portions of a report which might disclose trade secrets or secret processes shall not be made available for inspection by the public, but shall be made available immediately upon request to governmental agencies for uses related to the NPDES program or pretreatment program, and in enforcement proceedings involving the person furnishing the report. Wastewater constituents and characteristics and other effluent data, as defined at 40 CFR 2.302 shall not be recognized as confidential information and shall be available to the public without restriction. (8) Permit applications, industry-generated reports and written acknowledgement of directions to the industry by the City shall be signed by a corporate officer or duly authorized representative provided the authorization is made in writing to the Director. If the authorization is no longer accurate because a different individual or position has responsibility for overall operation of the facility, a new authorization must be submitted to the Director within 30 days. (9) A fee shall be assessed for processing all Industrial User permit applications. The fee shall be set by the City Council upon recommendation of the Board and shall be subject to periodic review and adjustment. (10) Transfer of Industrial User Discharge Permit. An IUDP may be transferred to a new owner or operator only if the permittee submits a written request to the Director at least 90 days in advance of the change in ownership or operator, and the Director approves the transfer of the permit. The notice to the Director must include a written certification by the new owner or operator which: (a) States that the new owner and/or operator has no immediate intent to change the facility's operations and processes; (b) Identifies the specific date on which the transfer is to occur; and (c) Acknowledges full responsibility for complying with the existing individual wastewater discharge permit. (d) Provision of a copy of the existing permit to the new owner and/or operator. Failure to provide advance request for a transfer renders the existing IUDP void as of the date of facility transfer. (11) The Director may require updated information or additional data from any Industrial User at any time and failure to respond in a timely manner shall constitute a violation of the discharge permit conditions. (12) The Director shall provide written acknowledgement of the application and will either approve or reject the request to discharge or, when necessary request more data. If the application is approved, the City will issue a discharge permit setting forth the conditions under which the wastes may be discharged to the sewers. The permit shall set specific limits for toxic and other pollutants. For categorical industries, these limits shall be those specified by federal and state regulations, except where more stringent limits are required to protect the POTW processes or effluent. Flow, conventional, and nonconventional pollutants may be limited for significant non-categorical Users. (13) The permit may be revoked at any time for good and sufficient cause as described in Code §§ 33-37 and 33-40. (14) Compliance by existing sources with categorical Pretreatment Standards shall be within three years of the date the Standard is effective unless shorter compliance time is specified in the appropriate subpart of 40 CFR chapter 1, subchapter N. Existing Sources which become Industrial Users subsequent to promulgation of an applicable categorical Pretreatment Standard shall be considered existing Industrial Users except where such sources meet the definition of a New Source. New Sources shall install and have in operating condition, and shall "start up", all pollution control equipment required to meet all applicable Pretreatment Standards before beginning to discharge. Within the shortest feasible time (not exceeding 90 days), New Sources must meet all applicable Pretreatment Standards. (15) Where pretreatment is required, such equipment shall be operated continuously during periods of discharge. (16) Any industry discharging industrial process wastes of any description shall install a suitable monitoring manhole in the building sewer to facilitate observation, sampling and measurement of the wastes. Such manhole, when required, shall be accessible and safely located, and shall be constructed in accordance with plans approved by the Director. The manhole shall be installed by the owner at the owner's expense and shall be maintained by the owner so as to be safe and accessible at all times. (17) Any industry discharging industrial process wastes of any description shall be charged a surveillance fee as recommended by the Board and approved by the City Council to compensate the City for the added cost of collecting and analyzing waste samples on a periodic basis to insure compliance with the terms of this article. Results of such analyses will be furnished to the industry. The surveillance fee shall be levied in addition to all other applicable charges, Users fee and/or taxes, and shall be subject to adjustment on an annual basis. (18) Samples collected to satisfy reporting requirements must be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, based on data that is representative of conditions occurring during the reporting period. Sampling and analysis of industrial discharges shall be conducted as deemed necessary by the Director. No person shall interfere with the collection of a representative sample during any condition of flow by intentionally diluting for the purpose of altering the sample or discharge flow, intentionally altering the sample or discharge flow to produce inaccurate test values, diverting flows around sampling points, disconnecting or disrupting the operation of samplers, discharging in such a manner as to avoid sampling, or taking any other action to defeat sampling. [Note: The Control Authority is required to indicate the frequency of monitoring necessary to assess and assure compliance by the User with applicable Pretreatment Standards and Requirements.] (a) Except as indicated in Sections (b) and (c) below, the User must collect wastewater samples using 24-hour flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by the Director. Where time-proportional composite sampling or grab sampling is authorized by the Department, the samples must be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides, the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the Department, as appropriate. In addition, grab samples may be required to show compliance with Instantaneous Limits. (b) Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. (c) For sampling required in support of baseline monitoring and 90-day compliance reports required [Tennessee Rule 1200-4-14-.12(2) and (4)], a minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, the Director may authorize a lower minimum. For the reports required by Tennessee Rule 1200-4-14-.12(5) and (8), the Industrial User is required to collect the number of grab samples necessary to assess and assure compliance by with applicable Pretreatment Standards and Requirements. (19) Analytical Requirements. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and amendments thereto, unless otherwise specified in an applicable categorical Pretreatment Standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the Director or other parties approved by EPA. (a) If an Industrial User subject to the reporting requirement in TN Rule 1200-4-14-.12(5) or (8) monitors any regulated pollutant at the appropriate sampling location more frequently than required by the Director, using the procedures in paragraph (19), the results of this monitoring shall be included in this report. (b) The reports required by TN rule 1200-4-14-.12(2)(4)(5) and (8) must be based upon data obtained through appropriate sampling and analysis performs during the period covered by the report, which data are representative of conditions occurring during the reporting period. The Director shall require that frequency of monitoring necessary to access and assure compliance by Industrial Users with applicable Pretreatment Standards and Requirements. Grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide, and volatile organic compounds. For all other pollutants, 24-hour composite samples must be obtained through flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by the Director. Where time-proportional composite sampling or grab sampling is authorized by the Director, the samples must be a representative of the discharge, and the decision to allow the alternative sampling must be documented in the Industrial User file for that facility or facilities. Using protocols (including appropriate preservation) specified in 40CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: For cyanide, total phenols, and sulfides, the samples may be composited in the laboratory or in the field; for volatile organics and oil & grease the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the Director, as appropriate. (20) Automatic samplers may be required: (a) Where the nature of the manufacturing operation or process wastes provides a reasonable possibility for an accidental or intentional discharge in violation of this chapter. (b) Where the installation of such monitoring unit is a condition for acceptance of the wastes in the public sewer. (c) Where accidental or intentional interference with the collection of a representative sample is detected on more than one occasion during a 12-month period. Where automatic sampling and/or monitoring units are utilized, the Industrial User shall provide all necessary site modifications, provide the necessary electricity, and shall pay an additional monthly rental on the unit(s). The rental charge shall be based on the cost of purchasing and maintaining the unit(s). The monthly rental charge shall be established by action of the Board and approval by the City Council and shall be subject to periodic review. (21) The results of any sampling and analysis of industrial discharge to the sanitary sewer conducted by or on behalf of an industry shall be forwarded to the Department. If sampling performed by a User indicates a violation, the User must notify the Director within 24 hours of becoming aware of the violation. The User may repeat the sampling and analysis and submit the results of the repeat analysis to the Director within 30 days after becoming aware of the violation. Resampling by the Industrial User is not required if the City has performed the sampling at the User between the time when the initial sampling was conducted and the time when the User or the Department receives the results of this sampling, or if the Department has performed the sampling and analysis in lieu of the Industrial User. (22) Waste concentration in excess of those prescribed by the Industrial User discharge permit: (a) Wastes having an average five-day BOD in excess of 250 mg/L, edible oils in excess of 100 mg/L, suspended solids in excess of 300 mg/L or ammonia in excess of 15 mg/L may be accepted into the sanitary sewer subject to a surcharge in accordance with Code § 33-1 to cover the additional cost of treating such wastes. The surcharge will be based on the equally weighted average of all samples collected within the billing cycle and the metered water consumption (less any metered water excluded from the sewage system, if applicable, in accordance with Code § 33-51) or the metered sewage discharge. The surcharge shall be subject to review and adjustment on an annual basis to reflect changes in operating costs. (b) Wastes having an ammonia concentration in excess of 150 mg/L, BOD in excess of 1,500 mg/L, edible oils in excess of 300 mg/L, or suspended solids in excess of 1,500 mg/L may be accepted into the sanitary sewer subject to a surcharge at twice the normal surcharge rate provided that these conventional and/or nonconventional pollutants do not result in upset, Pass Through or interference with the POTW processes. The surcharge calculation shall utilize one-fourth of the volume recorded for the 30-day billing period for each week or fraction thereof that the extraordinary concentration(s) occur. The maximum amount of the extraordinary surcharge shall not exceed the average total cost for POTW operation during the period of the discharge, plus the period required for recovery of the POTW processes when such processes are upset as a result of the extraordinary strength discharge(s). (c) All applicable surcharges shall be independent of penalties which may be imposed for violation of Industrial User permit violations. (d) The daily maximum limit for toxic pollutants shall be deemed in violation whenever the concentration of wastes collected within a 24-hour period are greater than or equal to twice the maximum monthly average specified in the Industrial User discharge permit and are subject to penalties as described in Code § 33-40. (e) The monthly average maximum limit for toxic pollutant substances shall be deemed in violation whenever the average of all samples collected during the month exceeds the maximum monthly average specified in the Industrial User discharge permit and penalties shall be assessed in accordance with Code § 33-40. (f) All Industrial Users shall notify the POTW immediately by telephone of any discharge, including, but not limited to, accidental discharges, discharges of a nonroutine, episodic nature, a noncustomary batch discharge, a Slug Discharge or Slug Load, that might cause potential problems for the POTW. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the User. A notice shall be permanently posted on the User's bulletin board or other prominent place advising employees to call the POTW in the event of a discharge as described Employers shall ensure that all employees, who could cause such a discharge to occur, are advised of the emergency notification procedure. (g) Within five days following such discharge, the User shall, unless waived by the Director, submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the User to prevent similar future occurrences. Such notification shall not relieve the User of any expense, loss, damage, or other liability which might be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the User of any fines, penalties, or other liability which may be imposed pursuant to this ordinance. (23) If any discharge to the wastewater system, or any proposed discharge to the system is responsible for or is likely to be responsible for an Upset, Interference, or Pass Through violation at the POTW, the Director may take any action necessary to: (a) Prohibit the discharge of such wastewater. (b) Require a discharger to demonstrate that in-plant modifications will reduce or eliminate the discharge of such substances in conformity with this article. (c) Require pretreatment, including storage facilities, or flow equalization necessary to reduce or eliminate the objectionable characteristics or substances so that the discharge will not violate these rules and regulations. (d) Take such other remedial action as may be deemed to be desirable or necessary to achieve the purpose of this article. (24) Where pretreatment or equalization of wastewater flows prior to discharge into any part of the wastewater treatment system is required, plans, specifications and other pertinent data or information relating to such pretreatment or flow-control facilities shall first be submitted to the Director for review and approval. Such approval shall not exempt the discharge or such facilities from compliance with any applicable code, ordinance, rule, regulation or order of any governmental authority. Any subsequent alterations or additions to such pretreatment or flow-control facilities shall not be made without due notice to and prior approval of the Director. (25) Where preliminary treatment facilities are provided for any water or waste, they shall be maintained continuously in satisfactory and effective operation by the owner at the owner's expense, and bypass of such pretreatment facilities is prohibited unless: (a) The bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; (b) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime; (c) This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and (d) The User submitted notices as required under paragraph (27) of this section. For the purposes of this subsection: [1] Bypass means the intentional diversion of wastestreams from any portion of a User's treatment facility. [2] Severe property damage means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. The Director may approve an anticipated bypass, after considering its adverse effects, if it is determined that it will meet the three conditions listed in this paragraph (25), or it is for essential maintenance to assure efficient operation and will not cause the Pretreatment Standards or Requirements to be violated. (26) Each Industrial User shall provide protection from accidental discharge of prohibited materials or other wastes regulated by this article. Facilities to prevent accidental discharge of prohibited materials shall be provided and maintained at the owner or operator's own cost and expense. Detailed plans showing facilities and operating procedures to provide this protection shall be submitted to the Director for review, and shall be approved before construction of the facility. Review and approval of such plans and operating procedures shall not relieve the Industrial User from the responsibility to modify the facility as necessary to meet the requirements of this article. (27) If a User knows in advance of the need for a bypass, it shall submit prior notice to the Director at least ten days before the date of the bypass, if possible. In the event that an unanticipated bypass that exceeds applicable Pretreatment Standards, the User shall submit oral notice to the Director within 24 hours from the time it becomes aware of the bypass. A written submission shall also be provided within five days of the time the User becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the bypass. The Director may waive the written report on a case-by-case basis if the oral report has been received within 24 hours. (28) A Notice of Violation/Repeat Sampling and Reporting. If sampling performed by a User indicates a violation, the User must notify the Director within 24 hours of becoming aware of the violation. The User shall also repeat the sampling and analysis and submit the results of the repeat analysis to the Director within 30 days after becoming aware of the violation. Re-sampling by the Industrial User is not required if the Department performs sampling at the User's facility at least once a month, or if the Department performs sampling at the User between the time when the initial sampling was conducted and the time when the User or the Department receives the results of this sampling, or if the Department has performed the sampling and analysis in lieu of the Industrial User. (29) All measurements, tests and analyses of the characteristics of water and waste to which reference is made throughout this Chapter shall be determined in accordance with procedures set forth in 40 CFR Part 136 or equivalent methods approved by EPA and shall be determined at the control manhole provided for in subsection (16) herein. (30) Any User of the public sewer who discharges industrial waste or matter must satisfy and meet the United States Federal Government guidelines for pretreatment as may be prescribed from time to time by the Environmental Protection Agency or its successor agency and the guidelines for pretreatment as may be prescribed from time to time by the water quality control division of the Tennessee Department of Health and Environment or its successor agency and further must furnish at its own expense any additional monitoring equipment as reasonably may be necessary in the opinion of the Director of the Department. (31) The Director must require appropriate reporting from those Industrial Users with discharges that are nor subject to categorical Pretreatment Standards. Significant Non-Categorical Users must submit to the Control Authority at least once every six months (on dates specified by the Director) a description of the nature, concentration, and flow of pollutants required to be reported by the Control Authority. In cases where local limit requires compliance with Best Management Practice or pollution prevention alternative, the User must submit documentation required by the Control Authority to determine the compliance status of the User. These reports must be based on sampling and analysis performed in the period covered by the report, and in accordance with the sampling techniques described in 40 CFR part 136 and amendments thereto. This sampling and analysis may be performed by the Control Authority in lieu of the significant noncategorical industrial user. The Director may require categorical Users to submit semi-annual self-monitoring reports to the Department. These reports shall describe effluent quality (analysis) and quantity (flow measurement), significant changes in operations or processes, personnel, hours of operation, and current solvent management and hazardous waste disposal. The reports shall include the results of all sampling and actions by the User during the period covered by the report. The report shall indicate the time, date, location of sampling and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected discharges to the POTW and that it has been done by a qualified professional in accordance with prescribed methods. In the event that the User is not meeting IUDP limits, the report shall contain a proposed compliance schedule which shall incorporate the major events leading to compliance; i.e., the hiring of a consulting engineer, submission of pretreatment plans and specifications, construction timetables, etc., where applicable. The City may accept, reject or modify the proposed compliance schedule, issue a different compliance schedule, revised IUDP or administrative order. The Director may require more frequent reporting from any categorical or Significant Industrial User. (32) Certification statement. The following certification statement is required to be signed and submitted by a duly Authorized Representative of Users submitting permit applications, baseline monitoring reports, reports on compliance with the Categorical Pretreatment Standard deadlines, periodic compliance reports. "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who managed the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." The certificate statement shall be signed and dated by a corporate officer or a duly authorized representative as described in subsection (G)(5) of this section, and shall bear the name and title of that officer or representative. (33) Record keeping. Users subject to the reporting requirements of this ordinance shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this ordinance, any additional records of information obtained pursuant to monitoring activities undertaken by the User independent of such requirements, and documentation associated with Best Management Practices. Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the User or the City, or where the User has been specifically notified of a longer retention period by the Director. (34) Date of Receipt of Reports. Written reports will be deemed to have been submitted on the date postmarked. For reports which are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern. (35) Violations of this article may include any or all of the following actions, none of which are necessarily prerequisite to another. (a) Notice of Violation (NOV). Whenever the Department finds that any User has violated or is violating this article, or a discharge permit or order issued hereunder, the Director or agent may serve upon such User a written notice of violation. Within 15 days of the receipt date of this notice, an explanation of the violation and a plan for the satisfactory correction and prevention thereof, to include specific required actions, shall be submitted to the Director. Submission of this plan in no way relieves the User of liability for any violation occurring before or after receipt of the notice of violation. (b) Consent Orders (CO). The Director is hereby empowered to enter into consent orders, assurances of voluntary compliance or other similar documents establishing an agreement with the User responsible for noncompliance. Such orders will include specific action to be taken by the User to correct the noncompliance within a time period specified by the order. Consent orders shall have the same force and effect as administrative orders. (c) Administrative Orders (AO). When the Director finds that a User has violated the article or a permit or order issued thereunder, the Director may issue an order to the User responsible directing that, following a specified period, sewer service shall be discontinued unless adequate treatment facilities, devices or other related appurtenances have been installed and are properly operated. Orders may also contain such other requirements as might be reasonably necessary and appropriate to treatment technology, additional monitoring and management practices. (d) Show cause hearing. The Director may order any User who causes or contributes to violations of this article or any permit or order issued hereunder to show cause why a proposed enforcement action should not be taken. Notice shall be served on the User specifying the time and place for the meeting, the proposed enforcement action and a request that the User show cause why this proposed enforcement action should not be taken. The notice of the meeting shall be served personally or by registered or certified mail at least ten days prior to the hearing. Whether or not a duly notified User appears as noticed, immediate enforcement may be pursued. (e) Cease and desist orders. When the Department finds that a User has violated or is violating this article or any permit or order issued hereunder, the Director may issue an order to cease and desist all such violations and direct those persons in noncompliance to comply forthwith and/or take such appropriate action as may be needed to correct continuing or threatened violation, including halting operations and terminating the discharge. (f) Penalties. Notwithstanding any other portion of this article, any User who is found to have violated any provision of this article, permits or orders issued hereunder shall be assessed penalties in accordance with Code § 33-40. Such assessments may be added to the User's next scheduled sewer bill and the Director shall have such other collection remedies to collect other service charges. Unpaid charges and penalties shall constitute a lien against the User's property. Users desiring to dispute such charges must file a request for the Director to reconsider the penalty. Where the Director believes a request has merit, the Director shall convene a hearing on the matter within 30 days of receiving the request from the User. (g) Emergency suspensions. The Director may suspend service to a User when it is necessary to stop an actual or threatened discharge presenting or causing an imminent or substantial endangerment to the health or welfare of a person, the POTW or the environment. In the event the User fails to voluntarily comply with the suspension order, the Director shall take such steps as deemed necessary, including immediate severance of the sewer connection. A User who is responsible, in whole or in part, for imminent endangerment shall submit to the Director a detailed written report describing the causes of the event and the measures taken to prevent any further reoccurrence. The Director may allow the User to recommence discharge when the endangerment has passed. (h) Revocation of a permit. Any User who violates the conditions of this article or a permit or order or any applicable state or federal law is subject to revocation of a discharge permit and to permanent termination of service. Causes include, but are not limited to: [1] Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application; [2] Violation of permit conditions, pretreatment requirement, or this ordinance; [3] Failure to accurately report wastewater constituents and discharge characteristics; [4] Failure to notify the Director of significant changes to the wastewater prior to the changed discharge; [5] Illegal discharge; [6] Refusal of reasonable access to the User's premises for the purpose of inspection, monitoring or sampling; [7] Tampering with monitoring equipment; [8] Failure to pay sewer charges, administrative penalties or other fees; [9] Failure to meet compliance deadlines; [10] Failure to provide advance notice of the transfer of ownership of the permitted facility; and [11] Other actions which endanger the POTW processes, the health of individuals or the environment. (i) Publication of violations. The Director shall publish annually, in a newspaper of general circulation that provides meaningful public notice within the jurisdictions served by MWSD a list of the Users which, at any time during the previous 12 months, were in Significant Noncompliance with applicable Pretreatment Standards and Requirements. The term Significant Noncompliance shall be applicable to all Significant Industrial Users or any other Industrial User that violates paragraphs (c), (d) or (h) of § 33-32(A)(73) and shall mean: [1] Chronic violations of wastewater discharge limits, defined here as those in which 66% or more of all the measurements taken for the same pollutant parameter taken during a six-month period exceed by any magnitude a numeric Pretreatment Standard or Requirement, including Instantaneous Limits as defined herein; [2] Technical Review Criteria (TRC) violations, defined here as those in which 33% or more of wastewater measurements taken for each pollutant parameter during a six-month period equals or exceeds the product of the numeric Pretreatment Standard or Requirement including Instantaneous Limits, multiplied by the applicable criteria (1.4 for BOD, TSS, fats, oils and grease, and 1.2 for all other pollutants except pH); [3] Any other violation of a Pretreatment Standard or Requirement such as Daily Maximum, long-term average, Instantaneous Limit, or narrative standard that the Director determines has caused, alone or in combination with other discharges, Interference or Pass Through, including endangering the health of POTW personnel or the general public; [4] Any discharge of a pollutant that has caused imminent endangerment to the public or to the environment, or has resulted in the Director's exercise of the emergency authority to halt or prevent such a discharge; [5] Failure to meet, within 90 days of the scheduled date, a compliance schedule milestone contained in an individual wastewater discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance; [6] Failure to provide within 45 days after the due date, any required reports, including baseline monitoring reports, reports on compliance with categorical Pretreatment Standard deadlines, periodic self-monitoring reports, and reports on compliance with compliance schedules; [7] Failure to accurately report noncompliance; or any other violation(s), which may include a violation of Best Management Practices, which the Director determines will adversely affect the operation or implementation of the local pretreatment program. (j) Enforcement response. Whenever the Director finds that any person has violated this article or any prohibition, limitation or requirement contained in this article or permit or order issued hereunder, the Director will initiate the appropriate enforcement response as outlined in the Enforcement Response Guide which is incorporated herein as if copied verbatim. The Enforcement Response Guide may be found on file for review in the City Recorder's office and on the City's web site at murfreesborotn.gov. (k) Review hearing. Whenever a User believes that an enforcement response is in error, a hearing before the Board may be requested, provided that such request is made before the deadline specified by the enforcement response. The Board will review the noncompliance event and enforcement response at its next scheduled meeting and render a final decision. (l) Legal action. Upon any indication of a lack of response to a duly-issued enforcement order, the matter will be referred to the City Attorney for appropriate legal action, including court citation. (36) No Industrial User may accept or treat liquid wastes from any other site for the purpose of pretreatment and discharge to the public sewer system without such arrangement having been reviewed by the Board and approved in writing by the Director. (37) Remedies Nonexclusive. The remedies provided for in this ordinance are not exclusive. The Director may take any, all, or any combination of these actions against a noncompliant User. Enforcement of pretreatment violations will generally be in accordance with the City's enforcement response plan. However, the Director may take other action against any User when the circumstances warrant. Further, the Director is empowered to take more than one enforcement action against any noncompliant Use. (38) The City of Murfreesboro has the legal authority to seek injunctive relief for noncompliance by Industrial Users with Pretreatment Standards and Requirements. The City of Murfreesboro shall also have authority to seek or assess civil or criminal penalties in at least the amount of $1,000.00 a day for each violation by Industrial Users of Pretreatment Standards and Requirements. (H) Baseline Monitoring Reports. Users that become subject to new or revised categorical Pretreatment Standards are required to comply with the following reporting requirements. (1) Within either 180 days after the effective date of a categorical Pretreatment Standard, or the final administrative decision on a category determination under Tennessee Rule 1200-4-14-.06(1)(d), whichever is later, existing Categorical Industrial Users currently discharging to or scheduled to discharge to the POTW shall submit to the Director a report which contains the information listed in paragraph (2), below. At least 90 days prior to commencement of their discharge, New Sources, and sources that become Categorical Industrial Users subsequent to the promulgation of an applicable categorical Standard, shall submit to the Director a report which contains the information listed in paragraph (2), below. A New Source shall report the method of pretreatment it intends to use to meet applicable categorical Standards. A New Source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged. (2) Users described above shall submit the information set forth below. (a) All information required in § 33-36(G)(2)(g)(1)[aa] - [ii]. (b) Measurement of pollutants. [1] The User shall provide the information required in § 33-36(G)(2)(g)(1)[gg]. [2] The User shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this paragraph. [3] Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment the User should measure the flows and concentrations necessary to allow use of the combined wastestream formula in Tennessee Rule 1200-4-14-.06(5) to evaluate compliance with the Pretreatment Standards. Where an alternate concentration or mass limit has been calculated in accordance with Tennessee Rule 1200-4-14-.06(5), this adjusted limit along with supporting data shall be submitted to the Director. [4] Sampling and analysis shall be performed in accordance with § 33-36(G)(18) and (19). [5] The Director may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures. [6] The baseline report shall indicate the time, date and place of sampling and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant Discharges to the POTW. (c) Compliance Certification. A statement, reviewed by the User's Authorized Representative as defined in § 33-32(A)(4) and certified by a qualified professional, indicating whether Pretreatment Standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the Pretreatment Standards and Requirements. (d) Compliance Schedule. If additional pretreatment and/or O&M will be required to meet the Pretreatment Standards, the shortest schedule by which the User will provide such additional pretreatment and/or O&M must be provided. The completion date in this schedule shall not be later than the compliance date established for the applicable Pretreatment Standard. A compliance schedule pursuant to this Section must meet the requirements set out below in (e). (e) Compliance Schedule. The following conditions shall apply to the compliance schedule: [1] The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the User to meet the applicable Pretreatment Standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation); [2] No increment referred to above shall exceed nine months; [3] The User shall submit a progress report to the Director no later than 14 days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the User to return to the established schedule; and [4] In no event shall more than nine months elapse between such progress reports to the Director. (f) Signature and Report Certification. All baseline monitoring reports must be certified in accordance with § 33-36(G)(32) of this ordinance and signed by an Authorized Representative as defined in § 33-32(A)(4). (3) Compliance schedule for meeting categorical Pretreatment Standards. The following conditions shall apply to the schedule required by (2)(e) of this section: (a) The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the Industrial User to meet the applicable categorical Pretreatment Standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, etc.). (b) No increment referred to in subparagraph(a) of this chapter shall exceed nine months. (c) Not later than 14 days following each date in the schedule and the final date for compliance, the Industrial User shall submit a progress report to the Control Authority including, at a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the Industrial User to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports to the Control Authority. (I) Affirmative Defenses To Discharge Violations. (1) Upset: (a) For the purposes of this Section, upset means an exceptional incident in which there is unintentional and temporary noncompliance with categorical Pretreatment Standards because of factors beyond the reasonable control of the User. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. (b) An upset shall constitute an affirmative defense to an action brought for noncompliance with categorical Pretreatment Standards if the requirements of paragraph (c), below, are met. (c) A User who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence that: [1] An upset occurred and the User can identify the cause(s) of the upset; [2] The facility was at the time being operated in a prudent and workman-like manner and in compliance with applicable operation and maintenance procedures; and [3] The User has submitted the following information to the Director within 24 hours of becoming aware of the upset. If this information is provided orally, a written submission must be provided within five days: [aa] A description of the indirect discharge and cause of noncompliance; [bb] The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue; and [cc] Steps being taken and/or planned to reduce, eliminate, and prevent recurrence of the noncompliance. (d) In any enforcement proceeding, the User seeking to establish the occurrence of an upset shall have the burden of proof. (e) Users shall have the opportunity for a judicial determination on any claim of upset only in an enforcement action brought for noncompliance with categorical Pretreatment Standards. (f) Users shall control production of all discharges to the extent necessary to maintain compliance with categorical Pretreatment Standards upon reduction, loss, or failure of its treatment facility until the facility is restored or an alternative method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of power of the treatment facility is reduced, lost, or fails. (2) Prohibited Discharge Standards. A User shall have an affirmative defense to an enforcement action brought against it for noncompliance with the general prohibitions in § 33-36(A)(1) of this ordinance or the specific prohibitions in § 33-36(A)(2)(a)(b)(f)(h)(m)(n) of this ordinance if: (a) It can prove that it did not know, or have reason to know, that its discharge, alone or in conjunction with discharges from other sources, would cause Pass Through or Interference; and (b) A Local Limit exists for each pollutant discharged and the User was in compliance with each limit directly prior to, and during, the Pass Through or Interference; or (c) No Local Limit exists, but the discharge did not change substantially in nature or constituents from the User's prior discharge when the Department was regularly in compliance with its NPDES permit, and in the case of Interference, was in compliance with applicable sludge use or disposal requirements. (3) Bypass: (a) For the purposes of this Section: [1] Bypass means the intentional diversion of wastestreams from any portion of a User's treatment facility. [2] Severe property damage means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. (b) A User may allow any bypass to occur which does not cause Pretreatment Standards or Requirements to be violated, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provision of paragraph (c) below and paragraph (4) of this Section. (c) Bypass Notifications: [1] If a User knows in advance of the need for a bypass, it shall submit prior notice to the Director, at least ten days before the date of the bypass, if possible. [2] A User shall submit oral notice to the Director of an unanticipated bypass that exceeds applicable Pretreatment Standards within 24 hours from the time it becomes aware of the bypass. A written submission shall also be provided within five days of the time the User becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the bypass. The Director may waive the written report on a case-by-case basis if the oral report has been received within 24 hours. (4) Bypass: (a) Bypass is prohibited, and the Director may take an enforcement action against a User for a bypass, unless: [1] Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; [2] There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and [3] The User submitted notices as required under paragraph (c) of this section. (b) The Director may approve an anticipated bypass, after considering its adverse effects, if the Director determines that it will meet the three conditions listed above in paragraph (a) of this Section.

(Ord. No. 75-1 §§ 5-7, 02-27-75; Ord. No. 82-2 § 1, 03-18-82; Ord. No. 86-11 § 1, 03-20-86; Ord. No. 90-47 §§ 4-16, 10-11-90; Ord. No. 94-O-05 §§ 1-4, 03-03-94, Ord. No. 98-O-53R §§ 12-26, 01-18-01; Ord. No. 01-O-35 § 6, 10-18-01; Ord. No. 08-O-22 § 11, 07-01-10; Ord. No. 18-O-47, § 7, 8-16-18)

Ask a question about Murfreesboro law

Corpus searches the Murfreesboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.