§ 3.2.4.3 — Location; Performance Guarantees
Code of Ordinances of the City of Abilene, Texas (Supp. No. 15: codified through Ordinance No. 85-2026, enacted September 24, 2026) · Abilene Code of Ordinances § 3.2.4.3
Corpus is an independent public-information project, not the official City of Abilene website. Stable reference: corpuslaw.us/code/cce045a7-99c5-4516-96d1-34af125f0bba
Section 3.2.4.3 - Location; Performance Guarantees
(a) Construction Plans. The location of all fire hydrants, all water supply improvements and the boundary lines of special districts, private systems and certified water service areas, indicating all improvements proposed to be served, shall be shown on the Construction Plans. (b) Cost. The cost of installing all water supply improvements to be made by the developer, including required off-site public facilities, shall be included in the performance guarantees furnished by the developer. (c) Location of Lines. Extension of water and wastewater lines shall be made along the entire frontage of the plat adjacent to a street or thoroughfare. (1) If the subdivision is not adjacent to a thoroughfare, the extension of utilities shall be accomplished in such a manner as to allow future connections to said utilities by new subdivisions. (2) If new subdivisions will never be constructed beyond a developing subdivision due to physical constraints, the City Engineer may waive the requirement for adjacent utility line construction at the time of Final Plat approval and prior to construction of the subdivision. (d) Compliance with Other Regulations. Installation, operations and maintenance of utilities not specifically referenced herein shall comply with regulations of the TCEQ, and with any other applicable State rules and regulations, whichever is the most stringent requirement.
(Ord. No. 8-2010, pt. 1(Exh. A), 4-22-10)
Ask a question about Abilene law
Corpus searches the Abilene sections it holds and shows the ones that match, with their citations. Free, no sign-in.
