§ 3.2.4.5 — Central Water Systems
Code of Ordinances of the City of Abilene, Texas (Supp. No. 15: codified through Ordinance No. 85-2026, enacted September 24, 2026) · Abilene Code of Ordinances § 3.2.4.5
Corpus is an independent public-information project, not the official City of Abilene website. Stable reference: corpuslaw.us/code/d7bc3d51-1c3d-4730-a323-c3aaec79e952
Section 3.2.4.5 - Central Water Systems
(a) Design and Construction. All water facilities within a subdivision shall be designed and constructed to City standards and to all state laws, policies, standards, rules and regulations for an approved public water system, including those covering the preparation, submittal and approval of plans and specifications for water systems and acceptable operating practices, and in conformance with all laws, policies, standards and rules and regulations for establishing the ISO rating of the City and current fire codes of the City. The entire water system may not meet these standards, but the part that serves the subdivision must meet these standards in order to be approved by the City. (b) Other Water Systems. For water systems other than the City system, the following apply: (1) If the water system that will serve a proposed development is not to be a part of the City water system, the developer must submit with the application for approval of the Preliminary Plat a current letter from the TCEQ certifying that the public water system that will serve the subdivision is in compliance with TCEQ rules and regulations. Plans and specifications for the subdivision's water system that will be built to serve the subdivision shall be submitted as part of the subdivision's Construction Plans. (2) The developer must submit a letter from the TCEQ verifying that the public water system proposed to serve the development holds a current valid certificate of convenience and necessity (CCN) for the area proposed for development. The letter must be accompanied by a map showing the boundaries of the water system CCN in the vicinity of the development. (3) If a water system cannot meet the standards of this Subsection, at the Planning and Zoning Commission's discretion, the subdivision may be approved, if arrangements have been made for an approved water system that will meet City standards to serve the subdivision upon annexation by the City. This shall be arranged by means of a mutually acceptable contract with the City, unless a contract with another entity ensures compliance with the technical requirements of this chapter, as determined by the City Attorney.
(Ord. No. 8-2010, pt. 1(Exh. A), 4-22-10)
Ask a question about Abilene law
Corpus searches the Abilene sections it holds and shows the ones that match, with their citations. Free, no sign-in.
