Sec. 6-181. - General requirements.
(a) Private property owners, developers, operators or builders shall be responsible for the movement of soil from their property or construction site which results in accumulation of sediment in dedicated streets, alleys, lakes, ponds, any waterway or other private properties. Any accumulation or deposit of soil material beyond the limits of the property or in city streets, alleys or drainage facilities in an amount sufficient to constitute a threat to public health, safety and comfort as determined by the director shall constitute a nuisance and violation of this section. The only exemptions to this provision are lands under active agricultural use. As soon as construction or modification to the exempted land is to begin so that the use of land will change from agriculture to any other use, then the land shall lose its exemption and become subject to the provisions of this article. (b) Private property owners, developers, operators or builders shall immediately initiate erosion control and stabilization measures on portions of the site where construction activities have temporarily ceased and will not resume for a period exceeding fourteen (14) calendar days. Stabilization measures that provide a protective cover must be initiated immediately in portions of the site where construction activities have permanently ceased. These measures must be completed as soon as practicable, but no more than fourteen (14) calendar days after the initiation of soil stabilization measures and best management practices. (c) All operators of construction sites shall use best management practices to control and reduce the discharge to the MS4 and to waters of the United States, of sediment, silt, earth, soil, and other material associated with demolition, clearing, grading, excavation, and other construction activities to the maximum extent practicable. Permanent BMPs as required for post-construction water quality maintenance by the NPDES or TPDES construction general permit or other ordinances may be used during construction, as appropriate, for sediment and other pollutant control, and be restored to serve their post-construction function before development or redevelopment activities are completed. (d) The best management practices used at construction sites may include, but are not limited to, the following measures: (1) Ensuring that existing vegetation is preserved where feasible; (2) In drought conditions, alternative stabilization measures must be employed as approved by the director, to stabilize all disturbed areas, and can be irrigated in accordance with the water conservation and water resource management plan; (3) Minimizing the disturbance of areas using erosion and sediment controls and BMPs to protect areas, if necessary, adjacent to construction areas; (4) Use of structural practices to divert flows from exposed soils, store flows, or otherwise limit runoff and the discharge of pollutants from the site to the maximum extent practicable; (5) Minimization of the tracking of sediments off-site by vehicles, the generation of dust, and the escape of other windblown waste from the site; (6) Prevention of the discharge of building materials, including cement, lime, concrete, asphalt and mortar, to the MS4 or surface water in the state; (7) Providing general good housekeeping measures to prevent and contain spills of paints, solvents, fuels, septic waste, and other hazardous chemicals and pollutants associated with construction, and to assure proper cleanup and disposal of any such spills in compliance with state, federal, and local requirements; (8) Implementation of proper waste disposal and waste management techniques, including covering waste materials, minimizing ground contact with hazardous chemicals and trash; (9) Timely maintenance of vegetation, erosion and sediment control measures, and other best management practices to maintain each in good and effective operating condition; (10) Discharges from dewatering activities, including discharges from dewatering of trenches and excavations, are prohibited, unless managed by appropriate controls (City of Allen Standard Construction Details — Erosion Control); and (11) Installation of structural measures during the construction process to control pollutants in storm water discharges that will occur after construction operations have been completed. Structural measures should be placed on upland soils to the degree attainable. Installed structural measures may include, but are not limited to, the following: (i) Storm water detention structures (including wet ponds); (ii) Storm water retention structures; (iii) Flow attenuation by use of open vegetative swales and natural depressions; (iv) Other velocity dissipation devices; (v) Infiltration of runoff on site; and (vi) Sequential systems which combine several practices. Operators of construction sites are only responsible for the installation and maintenance of storm water management measures prior to final stabilization of the site and are not responsible for maintenance after storm water discharges associated with construction activity have terminated. (e) Qualified personnel (provided by the operator of the construction site) as described in the TPDES General Permit No. TXR150000, shall conduct inspections, perform maintenance of controls, and maintain documentation for disturbed areas of any construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, structural control measures, and locations where vehicles enter or exit the site, at least once every fourteen (14) calendar days and within twenty-four (24) hours of the end of a storm that is one-half (0.5) inches or greater. (f) All erosion and sediment control measures and other identified best management practices shall be observed in order to ensure that they are operating correctly and are effective in preventing significant impacts to receiving waters of the state and the MS4. Based on the results of these inspections, best management practices shall be modified as appropriate, prior to the required TXR150000 inspection schedule. (g) The director may require plans and/or specifications that are prepared for the construction of site improvements to illustrate and describe the best management practices required in this section that will be implemented on the construction site by means of an erosion control design plan and/or storm water pollution prevention plan (SWPPP). (h) The director may deny approval of any permit or any other city approval necessary to commence or continue construction, or to receive a certificate of occupancy if the management practices described in the erosion control design plan, storm water pollution prevention plan (SWPPP), or observed upon a site inspection by the director are determined not to control and reduce the discharge of sediment, silt, earth, soil, and other materials associated with clearing, grading, excavation, or other construction activities to the maximum extent practicable. (i) Any owner of a site of construction activity, whether or not such owner is an operator, is jointly and severally responsible for compliance with the requirements in this section. (j) Any contractor or subcontractor on a site of construction activity, who is not an owner or operator, but who is responsible under such person's contract or subcontract for implementing a best management practices control measure, is jointly and severally responsible with the owner for any willful or negligent failure on such person's part to adequately implement that control measure. (k) Whenever the management practices at a construction site are modified (as a result of change in the construction project, in order to implement more effective management practices, in response to an order or request from the director, or for any other reason), a written description of such modifications of the management practices may be requested by the director. If modified, the new management plan must be submitted as soon as possible, but in no case later than seven (7) calendar days following the modification. (l) No land disturbing associated with development construction shall commence without the prior approval of a director issued grading permit or a set of construction plans stamped by the city "Approved for Construction." (m) An erosion control design plan must be submitted and approved by the director and implemented by private property owners, developers, operators or builders prior to the commencement of any land disturbing or construction activities: (1) On property with an area of more than one (1) acre. (2) On property with an area of less than one (1) acre that constitutes more than fifty (50) percent of the site.
(Ord. No. 2925-7-10, § 1, 7-13-2010; Ord. No. 3338-11-15, § 1.E, 11-24-2015; Ord. No. 3721-12-19, § 1, 12-10-2019)
Ask a question about Allen law
Corpus searches the Allen sections it holds and shows the ones that match, with their citations. Free, no sign-in.