§ 6-182 — One acre or greater disturbances
Code of Ordinances of the City of Allen, Texas (Codified through Ordinance No. 4212-2-26, adopted February 10, 2026 (Supp. No. 23)) · Allen Code of Ordinances § 6-182
Corpus is an independent public-information project, not the official City of Allen website. Stable reference: corpuslaw.us/code/606ad580-9d5e-49b9-b79f-e029fedd4cba
Sec. 6-182. - One acre or greater disturbances.
All operators of sites of construction activity, including soil disturbance activities, construction-related activity (e.g., stockpiling of fill material), demolition, clearing, grading, excavation, construction support activity and landfilling activities, that result in the disturbance of one (1) or more acres of total land area, or are part of a common plan of development or sale within which one (1) or more acres of total land area are disturbed, shall comply with the following additional requirements: (a) Any primary or secondary operator who is required to obtain general permit coverage from the state for storm water discharges from a construction site under the TPDES general permit for storm water discharges from construction sites (construction general permit) must do so prior to commencement of land disturbing activities. (b) A storm water pollution prevention plan (SWPPP) shall be prepared and implemented prior to the commencement of construction activities as required in the construction general permit or any individual NPDES or TPDES permit issued for storm water discharges from the construction site. Secondary operators must either prepare their own SWPPP or participate in a shared SWPPP that covers the areas of the construction site, where they have control over the construction plans and specifications, and with any additional requirement imposed by this or any other city ordinance or state requirement. (c) The storm water pollution prevention plan (SWPPP) shall be prepared and certified by a licensed professional engineer or other professional, approved by the director, certified in a discipline that includes erosion and sediment control principals appropriate for the site. The signature, date and seal of the licensed professional engineer or other appropriate certification for the professional certifying the plan shall constitute his/her attestation to the best of his/her knowledge that the SWPPP fully complies with the requirements of the construction general permit, or with any applicable individual NPDES or TPDES permit issued for storm water discharges from the construction site, and with any additional requirement imposed by or under this article. The SWPPP shall contain the name, title, and business address of the professional signing the SWPPP, and the date that he/she did so. (d) The SWPPP shall be updated and modified as appropriate and as required by the NPDES or TPDES permit and this article. Any update or modification to the SWPPP that results in a change in design, construction, operation, or maintenance, which has a significant effect on the potential for the discharge of pollutants to the MS4 or to the waters of the United States shall be prepared, signed, dated, and sealed by a licensed professional engineer or other professional, approved by the director, certified in a discipline that includes erosion and sediment control principals appropriate for the site. (e) A copy of any SWPPP that is required by this article shall be submitted to the director in conjunction with any application for a building permit, demolition permit, early grading release, and/or any other city approval necessary to commence or continue construction at the project site. (f) If, upon the director's review of the SWPPP (or any modification to the SWPPP) and any site inspection that the director may conduct, the director determines that the SWPPP does not comply with the requirements of the construction general permit, any individual NPDES or TPDES permit issued for storm water discharge from the construction site, or any additional requirement imposed by or under this article, the director may issue an order prohibiting the commencement, or the continuation, of any construction activity at the site. Also, if at any time the director determines that the SWPPP is not being fully implemented, the director may similarly issue an order prohibiting the continuation of any construction activity at the site. (g) Upon review of the SWPPP and any site inspection that is conducted, if at any time the director determines that the SWPPP is not being fully implemented the director may suspend or deny approval of any building permit, early grading release, or any other city approval necessary to commence or continue construction, or to assume occupancy, on the grounds that the SWPPP does not comply with the requirements of the construction general permit, any individual NPDES or TPDES permit issued for storm water discharge from the construction site, or any additional requirement imposed by or under this article. (h) All owners, developers, contractors and subcontractors identified in an SWPPP shall sign a copy of the following certification statement before conducting any professional service identified in the SWPPP: "I ___________ certify under penalty of law that I understand the terms and conditions of the National Pollutant Discharge Elimination System (NPDES) permit and the Texas Pollutant Discharge Elimination System (TPDES) permit that authorizes the storm water discharges associated with land disturbing activity from the construction site identified as part of this certification, with the Storm Water Management Ordinance of the City of Allen, and with those provisions of the Storm Water Pollution Prevention Plan (SWPPP) for the construction site for which I am responsible." The certification must include the name and title of the person providing the signature; the name, address, and telephone number of the contracting firm; the address (or other identifying description) of the site; and the date the certification is made. (i) The SWPPP, with the licensed professional engineer's signature, seal, and date affixed, and the certifications of owners, developers, contractors and subcontractors required by this article, and with any modifications attached, shall be retained at the construction site from the date of commencement of construction through the date of final stabilization. (j) The operator shall make a copy of the SWPPP and any modification thereto available to the EPA, state inspectors, director and any other authorized city personnel at the construction site upon request. (k) The director may, but is not obligated to, notify the operator at any time that the SWPPP does not meet the requirements of the construction general permit, any applicable individual NPDES or TPDES permit issued for storm water discharges from the construction site, or any additional requirement imposed by or under this article. Such notification shall identify those provisions of the permit or this article which are not being met by the SWPPP and identify which provisions of the SWPPP require modifications in order to meet such requirements. Compliance with permits issued by other agencies shall be the sole responsibility of the operator. Within seven (7) calendar days of such notification from the director (or as otherwise provided by the director), the operator shall make the required changes to the SWPPP and shall submit to the director a written certification that the requested modifications have been made and sent to the appropriate state and federal authorities. (l) The operator shall modify the SWPPP whenever there is a change in design, construction, operation, or maintenance, which has a significant effect on the potential for the discharge of pollutants to the MS4 or to the waters of the United States, and which has not otherwise been addressed in the SWPPP, or if the SWPPP proves to be ineffective in eliminating or significantly minimizing pollutants, or in otherwise achieving the general objective of controlling pollutants in storm water discharges associated with construction activity. (m) The SWPPP shall be modified by the operator to identify any new contractor and/or subcontractor that will implement a measure in the SWPPP. (n) All modifications to the SWPPP shall be signed, dated, and sealed by a licensed professional engineer or other professional certified in a discipline that includes erosion and sediment control principles appropriate for the site, then submitted to the director within seven (7) calendar days of a change, determination of ineffectiveness, either by the city or the operator, or effective date of changes in contractor and/or subcontractor. (o) The operator shall follow all state and federal guidelines as shown in the TPDES and NPDES when any changes are made to the SWPPP. (p) Qualified personnel (provided by the operator of the construction site) shall inspect disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, structural control measures, and locations where vehicles enter or exit the site, at least once every fourteen (14) calendar days and within twenty-four (24) hours of the end of the storm that is one-half (0.5) inches or greater of rain. Disturbed areas and areas used for storage of materials that are exposed to precipitation shall be inspected for evidence of, or the potential for, pollutants entering the drainage system. Erosion and sediment control measures identified in the SWPPP shall be observed to ensure that they are operating correctly. Where discharge locations or points are accessible, they shall be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to receiving waters or the MS4. Locations where vehicles enter or exit the site shall be inspected for evidence of off-site sediment tracking. (q) Construction site inspections performed by city personnel shall not relieve the requirements of the operator to perform the operator's own inspections in accordance with subsection (p) above. (r) Based on results of the inspections required by this article that identify a pollution protection issue, the site description and/or the pollution prevention measures identified in the SWPPP shall be modified as appropriate, but in no case later than seven (7) calendar days following the inspection. Such modifications shall provide for timely implementation of any changes to the SWPPP within seven (7) calendar days following the inspection. When requested, all modifications to the SWPPP shall be submitted to the director within seven (7) calendar days of the date of inspection, but in all cases, revisions to the SWPPP shall be kept in a central location available for inspection within one (1) hour after the request by the director. (s) A written report summarizing the scope of any inspection required by this article, and the name(s) and qualifications of personnel making the inspection, the date(s) of the inspection, major observations relating to the implementation of the SWPPP, and actions taken in accordance with this article shall be made and retained by the operator as part of the SWPPP for at least three (3) years after the date that the site is finally stabilized. This report shall identify any incidence of noncompliance. Where a report does not identify any incidence of noncompliance, the report shall contain a certification that the facility is in compliance with the SWPPP, the facility's NPDES or TPDES permit, and this article. The report shall be certified and signed by the person responsible for making the report and consistent with the signing requirements of the permit. (t) The operator shall retain copies of any SWPPP and all reports required by this article or by the NPDES or TPDES permit for the site, and records of all data used to complete the notice of intent (NOI), for a period of at least three (3) years from the date that the site is finally stabilized. (u) Where a site has been finally stabilized and all storm water discharges from construction activities that are authorized by this article and by the NPDES or TPDES permit are eliminated, or where the operator of all storm water discharges at a facility changes, the operator of the construction site shall submit to the director, and to any other responsible city department personnel, a notice of termination (NOT) that includes the information required by the construction general permit administered by the TCEQ.
(Ord. No. 2925-7-10, § 1, 7-13-2010; Ord. No. 3721-12-19, § 1, 12-10-2019)
Ask a question about Allen law
Corpus searches the Allen sections it holds and shows the ones that match, with their citations. Free, no sign-in.
