Sec. 4-1-21. - Building permit and inspection fee schedule.

(a) Building permit fee: (i) Nonresidential: The fee for a building permit shall be calculated and payable as a fraction of the value of the project as calculated below, or the minimum fee shown, whichever is greater. The valuation shall be either the valuation stated by the applicant, or, when in the opinion of the Building Official the stated valuation appears to be significantly understated, the valuation may be calculated based on the most recent building valuation data published by the International Code Council as modified by the City. The building permit fee for a project includes the fees for the electrical, HVAC, and plumbing permits associated with that project. (ii) Residential dwelling: The terms and conditions of a permit shall be the same as stated above for a Nonresidential building permit, except that the permit fee for a residential dwelling shall be determined by the following Residential Dwelling fee table: (b) Building Permit Fee Schedule: (1) All Nonresidential dwelling Projects: $ Value x $0.0038 = Permit Fee: Rounded to whole dollars. (2) Minimum Permit Fees (Nonresidential and Residential dwellings): a. New construction: One hundred thirty-nine dollars ($139.00) plus seventy dollars ($70.00) times the number of other permits required for electrical, plumbing and HVAC work. b. Remodels and Additions: One hundred thirty-nine dollars ($139.00) plus seventy dollars ($70.00) times the number of other permits required for electrical, plumbing and HVAC work. (3) Other permits and inspection fees (nonresidential and residential dwellings): a. Certificate of occupancy review and inspection when not associated with a building permit: .....$151.00 b. Recreation of existing Certificate of Occupancy: .....$52.00 c. Wrecking permit and moving permits: .....$114.00 d. Permit for the installation of flammable liquids tanks and pumps: .....$76.00 This includes the fees for electrical and plumbing permits. e. Residential re-roofing permit: .....$178.00 f. Manufactured home installation: .....$226.00 This includes the fees for electrical and plumbing permits. g. Inspection not otherwise noted above, and those requested after hours, two-hour minimum charge per hour: .....$111.00 h. Re-inspection: .....$70.00 i. Construction and Advisory and Appeals Board application: .....$54.00 j. Siding and exterior veneer: Value of project × 0.0033 minimum: .....$70.00 k. Expedited review fee: Projects: .....$623.00 l. Insulation and energy conservation: Value of project x 0.0034 minimum of: .....$70.00 m. Technology fee: .....$13.00 n. Glass/glazing permit: .....$70.00 o. Insulation permit: .....$68.00 p. Reserved. ..... q. Commercial (public or semi-public) swimming pool, spa, public interactive water feature: .....$437.00 r. Sign permit: .....$114.00

(Ord. No. 6878, § 1, 12-13-2005; Ord. No. 6924, § 1, 4-4-2006; Ord. No. 7058, § 3, 9-11-2007; Ord. No. 7188, § 4, 9-15-2009; Ord. No. 7238, § 15, 9-14-2010; Ord. No. 7363, § 8, 9-18-2012; Ord. No. 7431, § 8, 9-17-2013; Ord. No. 7620, § 6, 9-13-2016; Ord. No. 7688, § 7, 9-12-2017; Ord. No. 7788, § 2, 6-4-2019; Ord. No. 7803, § 2, 8-27-2019; Ord. No. 7811, § 10, 9-24-2019; Ord. No. 7883, § 8, 9-15-2020; Ord. No. 7924, § 7, 8-13-2021; Ord. No. 8004, § 11, 9-8-2022; Ord. No. 8068, § 10, 9-19-2023; Ord. No. 8152, § 9, 9-17-2024; Ord. No. 8218, § 10, 9-16-2025)