For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-1-30 — Fee schedule

Code of Ordinances, City of Amarillo, Texas (Supp. No. 81: codified through Ordinance No. 8226, enacted December 9, 2025) · Amarillo City Code § 4-1-30

Corpus is an independent public-information project, not the official City of Amarillo website. Stable reference: corpuslaw.us/code/2996dc64-7f54-4924-be71-9d59a5d88481

Sec. 4-1-30. - Fee schedule.

(a) New construction, additions, and remodeling. The permit fee for an electrical permit shall be combined with the fees for a building permit, when one is issued on the same project, in accordance with the building permit fee schedule. When there is no building permit issued on the same project where an electrical installation is made, the permit fee for new electrical installations, additions, and remodeling of existing buildings shall be based on the full ampere capacity of the main service. In the event of more than one (1) main service, the fee shall be based on the combined total ampere capacity of the main service. If construction changes require a change in the ampere capacity of the main service, an additional charge or credit will be made based on the ampere capacity as determined by the Electrical Inspector. In situations where the main service is deliberately oversized for future expansion, the fee shall be based on the ampere capacity of the main fuse, provided that the main fuse capacity is at least two hundred (200) amperes less than the ampere capacity of the main service. On additions to existing buildings, the fee shall be based on the increase in the ampere capacity of the main service. If the addition to the building does not require an increase in the ampere capacity of the main service, the fee shall be based on subsection (b) below. (b) Electrical permit and inspection fee schedule. (1) New construction and additions to panel service: ..... a. Minimum fee: .....$70.00 b. Fee for construction taps: .....$70.00 c. All 120-volt through 480-volt single-or three-phase services, per ampere: .....$0.40 (2) Alterations: ..... a. Alteration of residential service entrance: .....$70.00 b. Alteration of nonresidential service entrance: .....$70.00 (3) Equipment additions: ..... a. Gasoline pump and dispensers, generators and wind generators, transformers, signs, sign transformers, electrical device or opening not listed; each: .....$70.00 b. Electrical passenger or freight elevator or dumbwaiter installation, each: .....$70.00 (4) Inspection fees: ..... a. Inspection not otherwise noted above, and those requested after hours, two-hour minimum charge, per hour: .....$111.00 b. Re-inspection fee: .....$70.00 (5) Technology fee: .....$13.00

(Ord. No. 6878, § 1, 12-13-2005; Ord. No. 7188, § 5, 9-15-2009; Ord. No. 7238, § 16, 9-14-2010; Ord. No. 7363, § 9, 9-18-2012; Ord. No. 7620, § 7, 9-13-2016; Ord. No. 7688, § 8, 9-12-2017; Ord. No. 7811, § 12, 9-24-2019; Ord. No. 7883, § 9, 9-15-2020; Ord. No. 7924, § 8, 8-13-2021; Ord. No. 8004, § 12, 9-8-2022; Ord. No. 8068, § 11, 9-19-2023; Ord. No. 8152, § 10, 9-17-2024; Ord. No. 8218, § 11, 9-16-2025)

Ask a question about Amarillo law

Corpus searches the Amarillo sections it holds and shows the ones that match, with their citations. Free, no sign-in.