§ 4-6-212 — Construction and restoration standards for newly constructed or overlayed streets and alleys
Code of Ordinances, City of Amarillo, Texas (Supp. No. 81: codified through Ordinance No. 8226, enacted December 9, 2025) · Amarillo City Code § 4-6-212
Corpus is an independent public-information project, not the official City of Amarillo website. Stable reference: corpuslaw.us/code/d3b3fb8c-023b-4dd4-ae32-c61184a7e792
Sec. 4-6-212. - Construction and restoration standards for newly constructed or overlayed streets and alleys.
(a) No Service Provider or Contractor shall allow an open trench Excavation or potholing of Facilities in the pavement of any Public Right(s)-of-Way for a period of three (3) years from the completion of new Street construction or overlay of Streets except in compliance with the provision of this section. (b) Any application for a Construction Permit to Excavate in Public Right(s)-of-Way subject to the requirements of this section shall contain the following information: (1) A detailed and dimensional engineering plan that identifies and accurately represents the Public Right(s)-of-Way and property that will be impacted by the proposed Excavation, as well as adjacent Streets, and the method of Construction. (2) The Street or Alley width including curb and gutter over the total length of each City block that will be impacted by the proposed Construction. (3) The location, width, length, and depth of the proposed Excavation. (4) The total area of existing Street or Alley pavement, and/or improved surfaces in each individual City block that will be impacted by the proposed Excavation. (5) A written statement addressing the criteria for approval set forth in subsection (c) below. (c) No Construction permit for Excavation in the Public Right(s)-of-Way of newly constructed or overlayed Streets or Alleys shall be approved unless the City Engineer finds that all of the following have been met: (1) Boring or jacking without disturbing the pavement is not practical due to physical characteristics of the Street or Alley or other Facilities. (2) Alternative Facilities alignments that do not involve excavating the Street or Alley are found to be impracticable. (3) The proposed Construction cannot reasonably be delayed until after the three-year deferment period has lapsed. (d) The Streets or Alleys shall be restored and repaired in accordance with design and construction standards provided by the City Engineer or as established and adopted by the City.
(Ord. No. 6559, § I, 10-9-2001)
Ask a question about Amarillo law
Corpus searches the Amarillo sections it holds and shows the ones that match, with their citations. Free, no sign-in.