§ 4-6-221 — Denial, suspension, revocation, or extension of permit
Code of Ordinances, City of Amarillo, Texas (Supp. No. 81: codified through Ordinance No. 8226, enacted December 9, 2025) · Amarillo City Code § 4-6-221
Corpus is an independent public-information project, not the official City of Amarillo website. Stable reference: corpuslaw.us/code/fcdd64b3-0972-429d-9cca-d17ce1391daf
Sec. 4-6-221. - Denial, suspension, revocation, or extension of permit.
(a) Denial of a Permit. A permit (Construction and Service Line) may be denied for any one (1) of the following reasons: (1) Not having proper insurance for the required amounts. (2) Consistently failing to perform in accordance with the requirements of this article. (3) Requesting to cut a City-maintained Street that can be crossed by jacking, boring or tunneling. (4) Proposing barricading, channelizing, signing, warning or other traffic control procedures or equipment that does not comply with the requirements of the Manual on Uniform Traffic Control Devices. (5) The activity or the manner in which it is to be performed will violate a City ordinance or a state or federal law. (6) Failure to furnish all of the information required under this article or, except for good cause shown, to file the registration or Construction or Service Line permit applications within the time prescribed. (7) Misrepresenting or falsifying any information in the registration or Construction or Service Line permit applications. (8) Failing to provide a surety bond or other acceptable security or comply with the Performance Guarantee. (9) Owing outstanding debts to the City. (10) Lack of available space in the Public Right(s)-of-Way. (11) Proposed activity will substantially interfere with vehicular or pedestrian traffic and no procedures have been implemented to minimize the interference. (b) Suspension of a Permit. The City Engineer may suspend any or all permits granted to allow work in the Public Right(s)-of-Way for the following reasons subject to the procedural guidelines noted in section 4-6-222 and any agreement that applies to the Service Provider using the Public Right(s)-of-Way, as well as any limitations imposed by federal or state law: (1) Failing to comply with an order of the City Engineer; (2) The recognition that a permit was issued in error; (3) Failing to comply with restrictions or requirements placed on the permit by the City Engineer; or (4) Any safety violation which create peril to the public; or (5) Violating any provision of this article. (c) The City Engineer may reinstate a previously suspended permit when the conditions that caused such permit to be suspended are remedied to the satisfaction of the City Engineer. (d) Revocation of a Permit. If no work has begun on a permitted project within thirty (30) calendar days of issuance of the permit, the permit shall be null and void, and a new permit shall be required. (e) Extension of a Permit. The City Engineer may grant an extension of a permit for a period not to exceed sixty (60) days if requested by the permit holder. Such a request must be made before the permit expires. If no call for the cancellation of a permit or for an inspection is received within sixty (60) days of a permit being issued, a City Engineering Department project representative will be sent to the location to determine the status of the permitted work.
(Ord. No. 6559, § I, 10-9-2001)
Ask a question about Amarillo law
Corpus searches the Amarillo sections it holds and shows the ones that match, with their citations. Free, no sign-in.
