Sec. 4-8-15. - Variance.
(a) Applications for a variance shall be submitted in writing by the developer, subdivider or property owner to the City Engineer. The application shall state fully the grounds for the variance and all facts relied upon by the applicant. (b) The Planning and Zoning Commission shall have the authority to grant a variance to the requirements of this chapter only when the following shall be found: (1) No increase in the Base Flood Elevation will result if the variance is granted. (2) No additional risk of flooding on the property will result if the variance is granted. (3) The variance requested is the minimum necessary, considering the flood hazard, to afford relief. (4) The variance is issued upon (i) showing good and sufficient cause; (ii) a determination that failure to grant the variance would result in exceptional hardship; (iii) a determination that granting of the variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause fraud on or victimization of the public or conflict with existing local laws or ordinances. (c) When the City Engineer has made the finding required in subsection (b) and has reduced the same in writing to the Planning and Zoning Commission, the requirements of this chapter may be varied for the following: (1) Rehabilitation of structures listed on the National Register of Historic Places or a state or local inventory of historic places provided that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum necessary to preserve the historic character and design of the structure. (2) New construction or substantial improvements to be erected on a lot of ½-acre or less in size contiguous to and surrounded by lots with existing structures equal to or above the Base Flood Elevation, provided the relevant factors of this chapter have been fully considered. As lot sizes increase above the ½-acre size, the potential for higher runoff and flooding increases, therefore, the technical justification required for issuing the variance increases accordingly. (3) The construction and use of storm cellars or fallout shelters in residential and nonresidential areas provided that the storm cellar or fallout shelter is not attached to any main structure and is not used for other than emergency occupancy; and provided further, that all electrical, heating and other mechanical equipment for storm cellars and fallout shelters shall be equal to or above the Base Flood Elevation. (4) Substantial improvements where the lowest Floor elevation is between the Base Flood Elevation and one (1) foot above the elevation of the Base Flood. (d) The City Engineer may make a recommendation to the Planning and Zoning Commission to grant a variance for lowering the lowest floor elevation required by this chapter. All material necessary to elevate the building pad and its adjoining slopes shall be excavated from the area of the playa lake in accordance with Section 4-8-5. In no event shall such variance reduce the lowest floor elevation below the Base Flood Elevation adopted in the City's current floodplain management regulations, unless the City allows otherwise under an appeal in accordance with Section 4-8-16. Any such appeal sustained by the City Council could result in an amendment to this chapter and could cause a violation of the National Flood Insurance Program Regulations. To grant a variance, the City Engineer shall first receive an executed contract between the lake owner and the applicant requesting the variance, which authorizes the applicant to remove material from the lake. A time schedule acceptable to the City Engineer for the removal of the material and its deposit on the building site or outside of any Special Flood Hazard Area must be provided. In a lake owned by the City, the City Engineer shall allow the applicant to remove the necessary material from the lake affected. Approved variances shall not alter other requirements of this chapter. Variances shall not be issued within any designated floodway if any increase in flood levels during the Base Flood Discharge would result. For Playa Lake #6, Lawrence Lake, the applicant will not be required to remove material from the Special Flood Hazard Area.
(Ord. No. 7217, § 2, 6-1-2010; Ord. No. 7658, § 2, 3-14-2017)
Ask a question about Amarillo law
Corpus searches the Amarillo sections it holds and shows the ones that match, with their citations. Free, no sign-in.