§ 4-8-8 — Development permit requirements
Code of Ordinances, City of Amarillo, Texas (Supp. No. 81: codified through Ordinance No. 8226, enacted December 9, 2025) · Amarillo City Code § 4-8-8
Corpus is an independent public-information project, not the official City of Amarillo website. Stable reference: corpuslaw.us/code/dbb787c1-4328-42c1-9385-e4feb0420d6c
Sec. 4-8-8. - Development permit requirements.
(a) Application for a Floodplain Development Permit in any Special Flood Hazard Area shall be made to the City Engineer. The application shall include: (1) Elevation in relation to mean sea level of the lowest floor (including basement) of all new and substantially improved structures, including placement of prefabricated buildings and manufactured homes, for which a development permit is requested. (2) Elevation in relation to mean sea level to which any nonresidential structure shall be floodproofed. (3) Certification from a registered professional engineer or architect that the nonresidential floodproofed structure meets the floodproofing criteria of the City's adopted floodplain management regulations. (4) Description of the extent to which any watercourse or natural drainage will be altered or relocated as a result of the proposed development. Furthermore when the proposed structure is situated on a platted lot created prior to the first effective date of this chapter, the following supplemental data shall be provided: (5) A site development plan showing at a scale of not less than two hundred (200) feet equals one (1) inch the accurate location, dimensions and elevation of all proposed and existing structures. The site development plan shall include topographical information with a one-foot contour interval on City accepted datum. (6) A written statement concerning the current condition of the Special Flood Hazard Area and the cumulative effect of the proposed development when combined with all other existing and anticipated development; (b) Two (2) copies of the above-listed attachments shall be included with the floodplain development permit. The City Engineer shall forward one (1) copy to the Building Official who shall examine the proposed development for compliance with other City codes. (c) Construction or substantial improvements in Special Flood Hazard Areas shall comply with the following provisions: (1) All new construction or substantial improvements shall be designed or modified and adequately anchored to prevent flotation, collapse or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy; (2) All new construction or substantial improvements shall be constructed by methods and practices that minimize flood damage; (3) All new construction or substantial improvements shall be constructed with materials resistant to flood damage; (4) All new construction or substantial improvements shall be constructed with electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding; (5) All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system; (6) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the system and discharge from the systems into flood waters; and, (7) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding. (d) Specific Standards. The following specific provisions are required in all areas of special flood hazard where Base Flood Elevation data has been provided as set forth in the City's floodplain management regulations: (1) Residential Construction—New construction and substantial improvement of any residential structure shall have the lowest floor (including basement) elevated to or at least one (1) foot above the Base Flood Elevation. A registered professional engineer, architect, or land surveyor shall submit a certification to the Floodplain Administrator that these standards are satisfied. (2) Nonresidential Construction—New construction and substantial improvement of any commercial, industrial or other nonresidential Structure shall either have the lowest floor (including basement) elevated to or at least one (1) foot above the Base Flood Elevation or together with attendant utility and sanitary facilities, be designed so that the structure below the Base Flood Elevation is watertight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and effects of buoyancy. A registered professional engineer or architect shall develop and/or review structural design, specifications, and plans for the construction, and shall certify that the design and methods of construction are in accordance with accepted standards of practice as outlined. A record of such certification which includes the specific elevation in relation to mean sea level to which such Structures are floodproofed shall be maintained by the Floodplain Administrator. (3) Enclosures—New construction and substantial improvements, with fully enclosed areas below the lowest floor that are usable solely for parking of vehicles, building access or storage in an area other than a basement and which are subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered professional engineer or architect or meet or exceed the following minimum criteria: a. A minimum of two (2) openings, on separate walls, having a total net area of not less than one (1) square inch for every square foot of enclosed area subject to flooding shall be provided. b. The bottom of all openings shall be no higher than one (1) foot above grade. c. Openings may be equipped with screens, louvers, valves, or other coverings or devices provided that they permit the automatic entry and exit of floodwaters. (e) The City Engineer shall issue a floodplain development permit if the application meets all requirements. Approval or denial of a floodplain development permit shall be based on the provisions of this chapter and the following relevant factors: (1) The danger to life and property due to flooding or erosion damage. (2) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner. (3) The danger that materials may be swept onto other lands to the injury of others. (4) The compatibility of the proposed use with existing and anticipated development. (5) The safety of access to the property in times of flood for ordinary and emergency service vehicles. (6) The costs of providing governmental services during and after the flood conditions including maintenance and repair of streets and bridges, public utilities and other facilities such as sewer, gas, electrical and water systems. (7) The expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters and the effects of wave action, if applicable, expected at the site. (8) The necessity of the facility of a waterfront location, where applicable. (9) The availability of alternative locations, not subject to flooding or erosion damage, for the proposed development use. (f) The City Engineer shall keep a record of each floodplain development permit, issued in Special Flood Hazard Areas. (g) No building permit may be issued until the floodplain development permit has been issued by the City Engineer.
(Ord. No. 7217, § 2, 6-1-2010)
Ask a question about Amarillo law
Corpus searches the Amarillo sections it holds and shows the ones that match, with their citations. Free, no sign-in.
