§ 102-397 — Permit application
Code of Ordinances, City of Brownsville, Texas (Supp. No. 26: codified through Ordinance No. 2026-1797, enacted January 20, 2026) · Brownsville City Code § 102-397
Corpus is an independent public-information project, not the official City of Brownsville website. Stable reference: corpuslaw.us/code/e4d577e7-a8f2-4668-bd95-7938c15a59f1
Sec. 102-397. - Permit application.
All users required to obtain an industrial user pretreatment permit shall complete and file with the control authority an application in the form prescribed by the control authority (as may be periodically amended) and accompanied by the fee prescribed by the control authority schedule of charges and fees. In support of the application, the user shall submit, in units and terms appropriate for evaluation, the following information, at a minimum, but not limited to: (1) Name, address, and location (if different from the address); (2) SIC code number according to the Federal Standard Industrial Classification Manual, issued by the Executive Office of the President, Office of Management and Budget, 1972 and any amendments thereto; (3) Wastewater constituent concentration and characteristics, including but not limited to, those mentioned in division 2 of this article and any pollutants which are limited by any federal, state or local standards. Sampling and analysis shall be performed in accordance with 40 C.F.R. Part 136. New sources may give estimates of the information requested in paragraphs (3), (4) and (5) of this section. (4) Time and duration of the indirect discharge; (5) Average daily and three minute peak wastewater flow rates, including daily, monthly and seasonal variations, if any; (6) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections, and appurtenances by the size, location and elevation; (7) Each product produced by type, amount, processor and rate of production; (8) Description of activities, facilities and plant processes on the premises, including all materials which are or could be indirectly or directly discharged; (9) Type and amount of raw materials processed (average and maximum per day); (10) Number and type of employees, and hours of operation, and proposed or actual hours of operation of the pretreatment systems; (11) A statement regarding whether or not the pretreatment standards are being met and if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the user to meet applicable pretreatment standards; (12) If additional pretreatment and/or O&M will be required to meet the pretreatment standards then the industrial user shall provide the shortest reasonable and feasible schedule by which the user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standards. The following conditions shall apply to this schedule: a. The schedule shall contain increments of progress (milestone dates) in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.); b. No increment referred to in paragraph a. above shall exceed nine months, nor shall the maximum total compliance period exceed that of the applicable federal categorical standards. The control authority, however, may issue a shorter schedule to the user as necessary; c. No later than 14 calendar days following each milestone compliance date in the schedule and the final date for compliance, the user shall submit a progress report to the pretreatment manager, including, as a minimum, whether or not it complied with the increment of progress to be met on such date(s) and, if not, the date(s) on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports to the pretreatment manager. (13) Specific location of existing or proposed monitoring facilities. (14) Any other information as may be deemed by the control authority to be necessary to evaluate the permit application. (15) All wastewater indirect discharge permit applications must be signed by a legally authorized representative of the user and shall contain the following certification statement: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified user personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." The control authority will evaluate the data furnished by the user and may require additional information. After evaluation and acceptance of the data furnished, the control authority may issue an industrial user pretreatment permit subject to terms and conditions provided herein.
(Ord. No. 2020-795-G, § 2, 2-2-2021)
Ask a question about Brownsville law
Corpus searches the Brownsville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
