For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 102-408 — Baseline monitoring report

Code of Ordinances, City of Brownsville, Texas (Supp. No. 26: codified through Ordinance No. 2026-1797, enacted January 20, 2026) · Brownsville City Code § 102-408

Corpus is an independent public-information project, not the official City of Brownsville website. Stable reference: corpuslaw.us/code/c73c47ea-fd04-406d-9cdd-d6298f553206

Sec. 102-408. - Baseline monitoring report.

(a) Within 180 calendar days after the effective date of a categorical pretreatment standard, or 180 calendar days after the final administrative decision made upon a category determination submission under 40 C.F.R. § 403.6(a)(4), whichever is later, existing categorical users currently indirectly discharging to or scheduled to indirectly discharge to the POTW, shall submit to the pretreatment manager a report which contains the information listed in subparagraphs (b)(1)—(7) of this section. (b) Where reports containing the information listed in subparagraphs (b)(1)—(5), (7) and (9) of this section have already been submitted to the director or regional administrator, the industrial user will not be required to submit this information again. At least 90 calendar days prior to commencement of indirect discharge, new user sources, and sources that become categorical industrial users subsequent to the promulgation of an applicable categorical standard, shall be required to submit to the pretreatment manager a report which contains the information listed in subparagraphs (b)(1)—(5), (7) and (9) of this section. New sources shall report information on the method of pretreatment the source intends to use to meet applicable pretreatment standards. New sources shall give estimates of the information requested in subparagraphs (b)(4) and (5) of this section: (1) Identifying information. The user shall submit the name and address of the facility including the name of the operator and owners; (2) Permits. The user shall submit a list of any environmental control permits held by or for the facility; (3) Description of operations. The user shall submit a brief description of the nature, average rate of production including each product produced by type, amount, processes, and rate of production, and standard industrial classification code of the operation(s) carried out by such industrial user. This description should include a schematic process diagram which indicates point of indirect discharge to the POTW from the regulated processes. (4) Flow measurement. The user shall submit information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from each of the following: a. Regulated process streams; and b. Other streams as necessary to allow use of the combined waste stream formula of 40 C.F.R. § 403.6(e). (See subparagraph (b)(5)e. of this section.) The control authority may allow for verifiable estimates of these flows where justified by cost or feasibility considerations. (5) Measurement of pollutants. a. The user shall identify the pretreatment standards applicable to each regulated process; b. In addition, the user shall submit the results of sampling and analysis identifying the nature and concentration (or mass, where required by the standard or control authority) of regulated pollutants in the indirect discharge from each regulated process. Both daily maximum and average concentration (or mass, where required) shall be reported. The sample shall be representative of daily operations; c. A minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide, and volatile organics for facilities for which historical sampling data do not exist including new IUs and existing IUs that make changes or install new treatment; for facilities for which sufficient, representative historical sampling data are available, the pretreatment manager may authorize (in writing) a lower minimum. For the reports required by several sections including this section, the industrial user is required to collect the number of grab samples necessary to assess and assure compliance with applicable pretreatment standards and requirements. For all other pollutants, 24-hour composite samples must be obtained through flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized in writing by the control authority. The control authority may waive flow-proportional composite sampling for any industrial user that demonstrates that flow-proportional sampling is infeasible. In such cases, samples may be obtained through time-proportional composite sampling techniques or through a minimum of four grab samples where the user demonstrates in writing that this will provide a representative sample of the effluent being indirectly discharged. Using protocols specified in 40 C.F.R. Part 136, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized in writing by the control authority as appropriate. Total residual chlorine, pH, and temperature samples cannot be "composited" under any circumstances. In addition, grab samples may be required to show compliance with instantaneous limits. The decision to allow alternative sampling will be documented in the IU file. d. The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this section. Samples collected to satisfy reporting requirements must be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, based on data that is representative of conditions occurring during the reporting period. For sampling facilities that indirectly discharge less than 24 hours per day, the sampling must be representative of the IU's wastewater indirect discharge. Sampling must be taken within a 24-hour period, however, the sample should only be collected during that portion of the 24-hour period that the IU is indirectly discharging from the: 1. Regulated process and/or 2. Pretreatment unit (as long as regulated process wastewater is flowing through the pretreatment unit). During parts of the day when there is no indirect discharge of process wastewater, standing water should not be disproportionately sampled and analyzed as it would not be representative of the indirect discharge from the IU. e. Samples shall be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment, the user should measure the flows and concentrations necessary to allow use of the combined waste stream formula of 40 C.F.R. § 403.6(e), in order to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 C.F.R. § 403.6(e), this adjusted limit along with supporting data shall be submitted to the control authority; f. Sampling and analysis shall be performed in accordance with the techniques prescribed in 40 C.F.R. Part 136 and amendments thereto. Where 40 C.F.R. Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the pretreatment manager determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analysis shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the POTW or other parties, approved by the pretreatment manager. g. The control authority may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures; h. The baseline report shall indicate the time, date and place, of sampling, and methods of analysis, and shall certify that such sampling and analysis is representative of normal user work cycles and expected pollutant indirect discharges to the POTW; (6) Certification. A statement, reviewed by an authorized representative of the industrial user and certified to by a qualified professional representing the IU, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the industrial user to meet the pretreatment standards and requirements; and (7) Compliance schedule. A compliance schedule shall be included if additional pretreatment and/or O&M will be required to meet the pretreatment standards. The compliance schedule shall include the shortest schedule by which the industrial user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. a. Where the industrial user's categorical pretreatment standard has been modified by a removal allowance (40 C.F.R. § 403.7) the combined waste stream formula (40 C.F.R. § 403.6(e)), and/or a fundamentally different factors variance (40 C.F.R. § 403.13) at the time the user submits the report required by sections 102-407 through 102-408, the information required by subparagraphs (b)(6) and (7) of this section shall pertain to the modified limits. b. If the categorical pretreatment standard is modified by a removal allowance (40 C.F.R. § 403.7), the combined waste stream formula (40 C.F.R. § 403.6(e)), and/or a fundamentally different factors variance (40 C.F.R. § 403.13) after the user submits the report required by section 102-408 of this division, any necessary amendments to the information requested by subparagraphs (b)(6) and (7) of this section shall be submitted by the user to the control authority within 60 calendar days after the modified limit is approved. (8) The following conditions shall apply to the schedule in paragraph (b)(7): a. The schedule shall contain increments of progress (milestones) in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the industrial user to meet the applicable categorical pretreatment standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for acquiring major components, commencing construction, completing construction, etc.). b. No increment referred to in subparagraph a. above shall exceed nine months. c. No later than 14 calendar days following each date in the schedule and the final date for compliance, the industrial user shall submit a progress report to the control authority including, at a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the industrial user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports to the control authority. (9) In cases where the pretreatment standard requires compliance with a best management practice (BMP) or pollution prevention alternative, the user must submit documentation required by the pretreatment manager or the pretreatment standard necessary to determine the compliance status of the user.

(Ord. No. 2020-795-G, § 2, 2-2-2021)

Ask a question about Brownsville law

Corpus searches the Brownsville sections it holds and shows the ones that match, with their citations. Free, no sign-in.