§ 3.2.1 — Preliminary Plat
Code of Ordinances, City of Brownsville, Texas (Supp. No. 26: codified through Ordinance No. 2026-1797, enacted January 20, 2026) · Brownsville City Code § 3.2.1
Corpus is an independent public-information project, not the official City of Brownsville website. Stable reference: corpuslaw.us/code/3168ea55-08d8-4515-bd12-9aa618081fb8
3.2.1 - Preliminary Plat.
A. Purpose. The purpose of a preliminary plat is to determine the general layout of a subdivision, plan for adequate public facilities (water, wastewater, and streets), and to ensure compliance with the UDC as it pertains to both the subdivision of land and zoning. The preliminary plat is the first stage of the platting process. If a subdivision does not require the extension or construction of public improvements a final plat (refer to 3.2.2) may be submitted. B. Preliminary Plat Requirements. 1. No subdivision of land shall be allowed without proper submittal and approval of a preliminary plat. 2. A preliminary plat shall be required for any development (residential or nonresidential) that: a. Will be constructed in phases in which the required infrastructure will be constructed incrementally with the development of each phase, or b. Will require an extension or new construction of public utilities (water or wastewater) and roads. 3. After the preliminary plat is approved, the applicant will submit a final plat for the entire or a portion of the area reflected in the preliminary plat. The final plat must conform to the preliminary plat. a. In circumstances in which the final plat does not conform to the preliminary plat, the applicant will: (i) Receive approval of a new preliminary plat application, or (ii) Receive approval of a minor amendment (refer to 3.2.1K Preliminary Plat Amendments Following Approval.) 4. The entire parent tract or contiguous land under the same ownership shall be included in the preliminary plat. 5. The lot or lots created by the preliminary plat shall conform to the minimum lot and area regulations of the governing zoning district. a. If a zoning change is necessary, the applicant may process a zoning and subdivision application concurrently, however the subdivision application will include a condition that requires the lot size to comply with the minimum lot are dimensions required by the governing zoning on the property. 6. The preliminary plat is consistent with an associated development agreement approved by the city commission (if applicable). 7. The configuration of proposed Public Improvements including, but not limited to, roads, water, wastewater, storm drainage, park facilities, open spaces, easements, and right-of-way meet applicable standards of the UDC, and conform to the City's adopted master plans for those facilities. 8. A preliminary plat for a development that will be constructed in phases includes a phasing plan that shows how utilities, streets, and drainage improvements will be constructed incrementally with the development of each phase. 9. The preliminary plat conforms to the subdivision design standards set forth in 3.4 of the UDC. 10. The preliminary plat will have the following note above the title block: "PRELIMINARY PLAT FOR REVIEW PURPOSES ONLY" 11. The property owner shall either construct a sidewalk or pay a fee in lieu following approval of a preliminary plat (refer to 3.4.4 Sidewalks). C. Accompanying Plans or Applications. 1. A preliminary plat application shall be accompanied with the following preliminary plans: a. Preliminary water and wastewater plans (refer to 3.4.11); b. Preliminary drainage plan (refer to 5.6); and c. A Sidewalk Plan (refer to 3.4.4H); and d. Other plans deemed necessary by the City Engineer. 2. City staff will review the preliminary utility plans to determine whether the developer has provided adequate public water, wastewater, and street facilities improvements and is mitigating and improving existing drainage conditions based on the impact of the proposed development. a. Review of the preliminary utility and drainage plans shall not constitute approval of construction plans or waive the requirement of construction plans. b. Construction Plans are submitted for review to the engineering department after the applicant has received approval of a preliminary plat application. D. Application Processing. The plat application will be processed and reviewed in accordance with 2.3.5B Review and Action for Subdivision Related Applications. E. Review by the Planning Director or Designee. The Planning Director or Designee shall: 1. Process the initial submittal of a plat application and determine whether the application is complete in accordance with the City's application and supplemental checklist(s); 2. Serve as the final decision-making authority for a preliminary plat (refer to Table 2.1-1. Summary of Approval Authorities); and F. Criteria for Approval. The Planning Director or Designee shall use the following criteria to either approve or deny a preliminary plat application: 1. Complies with the preliminary plat requirements 3.2.1B; and 2. All other applicable standards of the Subdivision Regulations (Article 3) and Zoning Regulations (Article 4). G. Action by the Planning Director or Designee. The Planning Director or Designee shall: 1. Review the Criteria for Approval and the findings of the Planning Director or Designee documented in the City staff report and determine whether the application conforms to the UDC; 2. Act within thirty (30) calendar days following the date the application has passed completeness check (refer to Figure 2.3-5), unless the applicant submits a Waiver of Right to 30-Day Action as outlined in 2.3.4H. a. A property owner may submit one (1) waiver of right to 30-day action for a plat application in accordance with provisions and procedures contained in 2.3.4H. b. If no decision is rendered by the Planning Director or Designee within the thirty (30) day period as described above or such longer period as may have been agreed upon, the preliminary plat, as submitted, shall be deemed approved by the Planning Director or Designee. 3. Take one of the following actions: a. Approve the preliminary plat; b. Approve the preliminary plat with conditions; or c. Deny the preliminary plat with a list of application deficiencies. H. Effect of Approval. 1. Approval of a preliminary plat will allow the applicant to submit Construction Plans to the City for formal review, if applicable (refer to 3.3.3). 2. Approval of a preliminary plat shall be deemed as the general approval of the subdivision's layout, and shall not constitute approval or acceptance of Construction Plans (refer to 3.3.3) or a Final Plat (refer to 3.2.2). Additionally, a preliminary plat is not recorded with the County Clerk. 3. A Final Plat will be submitted by the applicant after Public Improvements are constructed and accepted (refer to 3.3.6). If public improvements are not being constructed and construction plans are not required, then the applicant may proceed with submitting a final plat application (refer to 3.2.2) for the entire area or a portion of the area included in the preliminary plat. 4. The applicant may address or reflect the conditions imposed by the Planning Director or Designee with the approval of the preliminary plat application in the subsequent final plat(s). I. Expiration of the Preliminary Plat. 1. The preliminary plat shall expire two (2) years from the date the preliminary plat was approved by the Planning Director or Designee unless: a. The applicant has made progress towards completing the project in accordance with 3.2.11.2 in which such circumstance the preliminary plat will remain valid indefinitely; or b. The applicant has received approval of an Extension of Preliminary Plat Approval in accordance with 3.2.1J, in which such circumstance the preliminary plat will remain valid for one (1) additional year from the date the extension was approved. 2. Progress towards completion shall be constituted by either of the following actions: a. Approval of construction plans for the entire or a portion of the tract of land included in the preliminary plat; or b. The submittal of a final plat application for the entire area or a portion of the area of land included in the preliminary plat. (i) A final plat is typically submitted after Public Improvements have been constructed and accepted by the City Engineer. If a final plat application is submitted to the City before Public Improvements are constructed, then the City shall require the following criteria prior to approving the final plat application: (1) Execution of a development agreement, which is approved by the city commission (refer to 3.38A Development Agreement and Surety for Completion of Delayed Public Improvements); and (2) Financial security posted by the applicant for completion of public improvements (refer to 3.3.9 Financial Surety) 3. Subsequent final plats shall strictly conform to the preliminary plat. Under no circumstance shall the validity of the preliminary plat allow the property owner to deviate from the configuration of lots and streets approved in the preliminary plat. a. If a subsequent final plat does not conform to the associated preliminary plat, the Planning Director or Designee will have the authority to require the applicant to either: (i) Receive approval of a Minor Amendments in accordance with 3.2.1K, or (ii) Require the applicant submit a new preliminary plat application if the changes are deemed as Major Amendments to the original preliminary plat. J. Extension of Preliminary Plat Approval. 1. The Planning Director or Designee is authorized to extend a preliminary plat for a period not to exceed one (1) year beyond the preliminary plat's initial expiration date. A request for extension shall be submitted to the Planning Director or Designee in writing at least thirty (30) calendar days prior to expiration of the preliminary plat and shall include reasons why the preliminary plat should be extended. 2. The Planning Director or Designee will review the extension request and shall approve or deny the extension request within thirty (30) calendar days of receiving the request. a. Should the Planning Director or Designee fail to act on an extension request within thirty (30) calendar days, the extension will be automatically approved. b. The Planning Director or Designee may approve the first extension request; however, the Planning & Zoning Commission shall be the responsible authority to approve any subsequent requests. 3. In reviewing an extension, the Planning Direct or Designee (or Planning & Zoning Commission, if applicable) shall consider whether the following conditions exist: a. Construction, which includes the installation of Public Improvements, is occurring on the subject property; b. The preliminary plat complies with new ordinances that impact the health, safety, and general welfare of the community; and c. If there is a need for a park, school or other public facility or improvement on the property. 4. In reviewing an extension, the Planning Director or Designee (or Planning & Zoning Commission, if applicable) may impose additional conditions including the following: a. Conditions to ensure that the property will be developed in a timely fashion and serve the public interest; and b. Conditions for the property to comply with new development regulations or request the applicant to waive any vested rights. 5. Appeal of the Planning Director or Designee's Decision on a Preliminary Plat Extension a. The denial of an extension by the Planning Director or Designee may be appealed to the Planning & Zoning Commission. b. A written request for such appeal shall be received by the Planning Director or Designee within fourteen (14) calendar days following the denial. c. The Planning & Zoning Commission shall hear and consider the appeal within thirty (30) calendar days following receipt of the appeal request by the Planning Director or Designee. d. The decision of the Planning & Zoning Commission will be final. K. Preliminary Plat Amendments Following Approval. 1. Minor Amendments. a. A minor amendment for a subdivision may be incorporated and reflected on a subsequent Final Plat application without the necessity of submitting a new preliminary plat application, if determined by the Planning Director or Designee that change constitutes a minor amendment. b. Minor amendments will include: (i) Minor adjustments in street alignments or lengths that are in compliance with the UDC; and (ii) Modification of lot lines that do not result in the creation of additional lots. c. Minor amendment will not: (i) Result in an increase in land area of more than a quarter acre, which is allotted for the permissible minor amendments listed in 3.2.1K.1.b; and (ii) Result in an increase of number of residential lots. 2. Major Amendments. a. All other subdivision changes not listed in 3.2.1k.1 Minor Amendments shall require the submittal and approval of a new preliminary plat application (including new fees, new reviews, new official vesting date, new official submission date, etc.). b. A new preliminary plat application shall be approved prior to the applicant submitting Construction Plans or Final Plat application(s) to the City. 3. Determination of Minor or Major Amendments. Determination of whether a proposed amendment is considered a minor or major amendment shall be subject to the Planning Director or Designee's interpretation of this section. Figure 3.2-1. Review Process for Preliminiary Plat [image omitted; see the official code]
(Ord. No. 2025-325.112, § 2, 3-4-2025)
Ask a question about Brownsville law
Corpus searches the Brownsville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
