§ 5.6.8 — General Performance Criteria for Stormwater Management
Code of Ordinances, City of Brownsville, Texas (Supp. No. 26: codified through Ordinance No. 2026-1797, enacted January 20, 2026) · Brownsville City Code § 5.6.8
Corpus is an independent public-information project, not the official City of Brownsville website. Stable reference: corpuslaw.us/code/a15a76b2-cb93-4a00-86da-d481785f26e2
5.6.8 - General Performance Criteria for Stormwater Management.
A. Minimum Standards. 1. All site designs shall establish stormwater management practices to control the peak flow rates of stormwater discharge associated with specified design storms and reduce the generation of stormwater. These practices should seek to utilize pervious areas for stormwater treatment and to infiltrate stormwater runoff from driveways, sidewalks, rooftops, parking lots, and landscaped areas to the maximum extent practical to provide treatment for both water quality and quantity. 2. All stormwater runoff generated from new development shall not discharge untreated stormwater directly into a jurisdictional wetland or local water body without adequate treatment. Where such discharges are proposed, the impact of the proposal on wetland functional values shall be assessed using a method acceptable to the City. In no case shall the impact on functional values be any less than allowed by the Army Corps of Engineers (ACE) or the Texas Commission on Environmental Quality. B. Stormwater Management Plan Requirements. 1. No application for development will be approved unless it includes a stormwater management plan detailing in concept how runoff and associated water quality impacts resulting from the development will be controlled or managed. The stormwater management plan will indicate the location and stormwater practice that will be used to control and manage on-site and off-site stormwater. 2. The stormwater management plan(s) shall be referred for comment to all other interested agencies, and all comments must be addressed in a final stormwater management plan. The final plan must be prepared and signed by an engineer licensed in the state of Texas, who will verify that the design of all stormwater management practices complies with these requirements. 3. The applicant must ensure access to all stormwater treatment practices at the site for the purpose of inspection and repair by securing all necessary maintenance easements (refer to 5.6.9A Maintenance Easements). C. Performance Bond and Security. 1. The City may, at its discretion, require the submittal of a performance security or bond prior to issuance of a permit to ensure that the stormwater practices are installed by the permit holder as required by the approved stormwater management plan. 2. The amount of the installation performance security shall be the total construction cost estimate of the stormwater management practices approved under the permit, plus twenty-five (25) percent. The performance security shall contain forfeiture provisions for failure to complete work specified in the stormwater management plan. 3. The performance security for the installation shall be released upon submission of "as-built plans" and written certification by a licensed professional engineer to confirm stormwater improvements were installed in accordance with these requirements. Provisions for a partial pro-rata release of the performance security based on the completion of various development stages can be done at the discretion of the City.
Ask a question about Brownsville law
Corpus searches the Brownsville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
