§ 86-104 — Construction in the right-of-way
Code of Ordinances, City of Brownsville, Texas (Supp. No. 26: codified through Ordinance No. 2026-1797, enacted January 20, 2026) · Brownsville City Code § 86-104
Corpus is an independent public-information project, not the official City of Brownsville website. Stable reference: corpuslaw.us/code/ad90cc1a-bea9-4086-9c75-8906e6ea9021
Sec. 86-104. - Construction in the right-of-way.
(a) No public utility provider shall perform any construction or installation of facilities in the public right-of-way without first obtaining a construction permit, unless determined an emergency repair to an existing utility. Permit applications are required for construction on new, replacement or upgrading of the company's facilities in the public right-of-way either aerial or underground. The permit will be in the name of the public utility provider who will own the facilities to be constructed. The permit must be completed and signed by a representative of the owner of the facilities to be constructed. (b) The failure of a public utility provider to request and obtain a permit from the city prior to performing any of the above listed activities in, or over any public right-of-way, except in an emergency, will subject the public utility provider to a stop-work order from the city designee and enforcement action pursuant to the city code. (c) If state or federal law provides that a permit is not required for certain work to be done, then a public utility provider proposing to do such work shall be required to provide notice 20 working days prior to performing such work. This requirement must be met, even if no permit is required pursuant to state or federal law. (d) Emergency repairs related to existing facilities may be undertaken without first obtaining a permit; however, the city designee should be notified in writing within two business days of any construction related to an emergency repairs; including a reasonably detailed description of the work performed in the public right-of-way, reasons for emergency condition, and an updated map of any facilities that were relocated, if applicable. (e) The permit shall state to whom it is issued, location of work, location of facilities, dates and times work is to take place, and any other conditions set out by the city. (f) The public utility provider requesting a permit will provide the city with documentation in the format specified by the city describing: (1) The proposed, location and route of all facilities to be constructed or installed and the utility provider's plan for construction within the public right- of-way should be shown on a set of scaled (at no greater than one inch equals 50 feet unless otherwise approved by the city designee) and dimensioned construction plans, plan/profile sheet, and street view with an aerial map. Plans should indicate the current public right-of-way and easements the public utility provider plans to occupy and any existing city facilities. Said plans shall show any proposed underground conduit, type of casing pipe required, if applicable, overhead lines, network nodes, ancillary equipment, or any other facilities to be installed. The drawings shall show a cross-sectional profile, identify all existing utilities and any existing or potential utility conflicts. (2) For installation of any proposed pole applicant shall provide sectional detail showing depth of anchor, scaled dimensional drawings of the proposed pole, other proposed equipment associated with the proposed installation, and indicate spacing from existing curb, driveways, sidewalk, light poles, and other poles or appurtenances. (3) All applications shall include photos of before (less than 45 calendar days prior to the application begin submitted) and after street view image. The after image needs to include any proposed poles and all proposed attachments, and any associated or ancillary equipment, whether attached or standalone. (4) If the project is within the state right-of-way, the applicant must provide evidence of a permit or permission from the state. (5) If city poles or light structures will be used or will be in the area of the proposed construction, the pole(s) or light structure(s) shall be identified. No electric meter shall be mounted on a city pole or light structure. (6) All plans shall reflect that no facilities to be installed will obstruct an existing or planned sidewalk, walkway, bicycle lane or lane of vehicular traffic. (7) Detail of what applicant proposes to install, such as connection points, poles, pipes, valves, or other facilities. (8) Detail of plans to remove and replace asphalt or concrete in streets. (9) Drawings of any bores, trenches, manholes, pull-boxes, junction boxes, switch gear, transformers, pedestals, network nodes, micro-network nodes, or other facilities, including depth located in public right-of-way. (10) Applicable details of the above facilities. (11) Complete legend of drawings submitted by applicant. (12) The name, address and phone numbers of the contractor or subcontractor who will perform the actual construction, including the name and telephone number of an individual with the contractor who will be available at all times during construction. (13) The construction and installation methods to be employed for the protection of existing structures, fixtures, and facilities within or adjacent to the public right-of-way, and the dates and times work will occur, all of which (methods, dates, times, and other applicable information) are subject to approval of the city designee or utility owner. (14) A traffic-control plan approved by the city designee shall be required any time work will require traffic lane closures or sidewalk closures. A trench safety plan, meeting OSHA 1 may also be required based on the proposed scope of work. (15) The permittee shall provide a SWPPP (prepared by a State of Texas licensed engineer) and the corresponding Texas Pollutant Discharge Elimination System (TPDES) General Permit Number TXR150000 for discharges of storm water runoff from small construction sites to the city. Permittee shall be responsible for implementing, maintaining and inspecting all storm water pollution prevention control measures and other practices shown on the SWPPP. The permittee shall abide by all requirements set forth in the TCEQ guidelines. (g) A copy of all permits and approved engineering plans shall be maintained at the construction site and made available for inspection by the city at all times when construction or installation work is occurring. (h) All construction or installation work authorized by permit must be completed in the time specified in the construction permit. If the work cannot be completed in the specified time periods, the permittee must request a time extension from the city designee in writing at least 48-hours before the permit expires. (i) A request for a permit must be submitted at least 20 working days before the proposed commencement of work, unless waived by the city designee. (j) Requests for permits will be approved or disapproved by the city within a reasonable time or receiving all the necessary information. The city will use best efforts to approve or disapprove a request for permit within ten working days of receipt of all require permit documentation. (k) The city designee can request a pre-construction meeting with the permittee and their construction contractor.
(Ord. No. 2025-223-D, § 2, 3-4-2025)
Ask a question about Brownsville law
Corpus searches the Brownsville sections it holds and shows the ones that match, with their citations. Free, no sign-in.