For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 86-105 — Construction and maintenance standards

Code of Ordinances, City of Brownsville, Texas (Supp. No. 26: codified through Ordinance No. 2026-1797, enacted January 20, 2026) · Brownsville City Code § 86-105

Corpus is an independent public-information project, not the official City of Brownsville website. Stable reference: corpuslaw.us/code/331ed1c6-83e6-4c84-9b9b-04ae93d28ada

Sec. 86-105. - Construction and maintenance standards.

(a) The following shall be required when facilities are constructed in the public right-of-way, regardless of whether a permit is required: (1) The city designee must be notified by the permittee 24 hours prior to construction proceeding. The permittee must have previously called for any needed locations for public right-of-way facilities. At the time of notification, the permittee will inform the city designee of the reference number assigned from the one-call system. (2) All construction shall be in conformance with all city codes and applicable local, state and federal laws and must be done in a good, workmanlike manner and in accordance with all applicable sections of this ordinance. (3) Repair of all street and sidewalk damaged or removed during installation of proposed utilities shall city standards or as directed by the city designee. All repairs must be made promptly to avoid safety hazards to vehicle and pedestrian traffic. (4) Installation of facilities must not interfere with city utilities, in particular gravity dependent facilities. (5) New facilities must be installed to a depth approved by the city designee. (6) All directional boring shall have locator place bore marks and depths while bore is in progress. The boring method and bore pit locations shall be identified. Locator shall place mark at each stem with paint dot and depth at least every other stem. (7) The working hours in the public rights-of-way are 8:00 a.m. to 5:00 p.m., Monday through Friday. Work that needs to be performed after 5:00 p.m. Monday through Friday must be approved in advance by the city designee. Any work performed on Saturday must be approved 72 hours in advance by the city designee. No work will be done on Sundays or city holidays, except for emergencies. (8) The permittee is responsible for obtaining line locates from all affected utilities or others with facilities in the public right-of-way prior to any excavation. Use of the geographic information system or the plans of records does not satisfy this requirement. When requested by the city designee, permittee shall verify locations by pot holing, hand digging or other method approved by the city designee prior to any excavation or boring with the exception of work involving lane closures, as discussed above. (9) Construction which requires pumping of water or mud shall be contained in accordance with city ordinances, federal and state laws and the directives of the city designee. (10) All facilities installed in the public right-of-way shall be capable of being identified through a digital GIS shape file or other means as acceptable to the city designee. Said identification shall be provided at the time of application and shall be visible on the facilities when installed. (11) The permittee must obtain any needed permits for electrical work and provide sealed engineered drawings for conduit size, circuit size, calculations for amperage, or any other required information. Provider shall be responsible for obtaining any required electrical power service to any installation. (12) Public right-of-way work shall be completed in the amount of time shown on the permit; but if no completion time is shown on the permit the work shall be complete in not more than one year. (13) The permittee has the exclusive responsibility to coordinate with other public service providers to protect all existing facilities in the public right-of-way in which the construction occurs. Acceptance of the plans and issuance of a permit does not constitute liability on the city's part for any damage to existing facilities. (14) The permittee has the exclusive responsibility to locate the extent of the public right-of-way. Acceptance of the plans and issuance of a permit does not constitute liability on the city's part for any facilities placed on private property. If facilities are placed on private property, it is the public service provider's responsibility to contact property owners and acquire easements or move the facilities. (15) The contractor will maintain at all times on the job site a responsible person authorized and capable to receive and relay instructions from the city designee. (b) Above ground utility structures shall meet the following requirements: (1) Above ground utility structures shall comply with all requirements of other city ordinances, other state and federal laws and regulations. Public service provider shall be responsible for obtaining other permits, as required. (2) Above ground utility structures exceeding two feet in height shall not be placed within any intersection visibility triangle, as defined in the city's or state's design criteria manual. (3) Above ground utility structures, not including poles, less than 60 cubic feet in volume, with no dimension greater than six feet, may be placed within the public right-of-way without screening. (4) Above ground utility structures, not including poles, equal to or greater than 60 cubic feet in volume or more than seven feet in height shall be located in a private utility easement or other private property and shall be screened on all sides except for the sides containing the openings for access to the structure and shall be subject to requirements of the unified development code. (c) Below ground utility structures may be allowed in the public right-of-way if space is available. In reviewing the utility structures the city will consider the following: (1) Size, location, and impact of the proposed structure; (2) The structure's coordination with existing and proposed public facilities; and (3) Availability of remaining public right-of-way. (d) If the city determines that the proposed utility structure cannot be placed within the public right-of-way without adversely affecting the integrity of an existing or future facility owned by the city, the city shall have the right to deny the location of a new or replacement utility structure within the said public right-of-way. (e) The public service provider shall pay city a use fee for use of the property based upon the reasonable value as determined by the city. In addition to a use fee, the city may request the public service provider to provide network connectivity or conduit to the city.

(Ord. No. 2025-223-D, § 2, 3-4-2025)

Ask a question about Brownsville law

Corpus searches the Brownsville sections it holds and shows the ones that match, with their citations. Free, no sign-in.