For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 173.07 — General requirements

Code of Ordinances, City of Carrollton, Texas (Includes legislation through Ord. No. 4326 adopted September 1, 2026) · Carrollton City Code § 173.07

Corpus is an independent public-information project, not the official City of Carrollton website. Stable reference: corpuslaw.us/code/e1f956c4-e7ae-4349-ae8c-9bfac3f939bf

§ 173.07: General requirements.

(A) All operators meeting the definition of a small or large construction site must comply with all terms and conditions of the TPDES construction general permit. All operators of construction sites, regardless of size or TPDES permit requirements, must use best management practices to control and reduce the discharge to the MS4 and to the surface water in the state or the waters of the U.S., of sediment, silt, earth, soil, and other material associated with clearing, grading, excavation, landfilling, and other construction activities to the maximum extent practicable. Such best management practices may include, but not be limited to, the following measures: (1) Ensuring that existing vegetation is preserved where feasible and that disturbed portions of the site are stabilized as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased. Stabilization measures may include: temporary seeding, permanent seeding, mulching, geotextiles, sod stabilization, vegetative buffer strips, protection of trees, preservation of mature vegetation, and other appropriate measures; (2) Use of structural practices to divert flows from exposed soils, store flows, or otherwise limit runoff and the discharge of pollutants from the site to the maximum extent practicable; (3) Minimization of the tracking of sediments off-site by vehicles, the generation of dust, and the escape of other windblown waste from the site; (4) Prevention of the discharge of building materials, including cement, lime, concrete, asphalt and mortar, to the MS4, surface water in the state or the waters of the U.S.; (5) General good housekeeping measures to prevent and contain spills of paints, solvents, fuels, septic waste, and other hazardous chemicals and pollutants associated with construction, and to assure proper cleanup and disposal of any such spills in compliance with state, federal, and local requirements; (6) Implementation of proper waste disposal and waste management techniques, including covering waste materials, minimizing ground contact with hazardous chemicals and trash, and installing and maintaining covered receptacles for rubbish and garbage to assure that such waste materials are not blown or carried by rainfall runoff from the site; (7) Timely maintenance of vegetation, erosion and sediment control measures, and other best management practices to maintain them in good and effective operating condition; and (8) Installation of structural measures during the construction process to control pollutants in stormwater discharges that will occur after construction operations have been completed. Structural measures may include, but not be limited to, the following: stormwater detention structures (including wet ponds); stormwater retention structures; flow attenuation by use of open vegetative swales and natural depressions; other velocity dissipation devices; infiltration of runoff on site; and sequential systems which combine several practices. Operators of construction sites are responsible for the installation and maintenance of stormwater management measures prior to final stabilization of the site, and for a period of two years after final acceptance by the city, unless the area is disturbed by new owners. (9) The current owner(s) of the property is responsible for the maintenance of the permanent stabilization structures listed above in subsection 173.07(A)(8) to ensure proper operation, water quality protection and flood control. (10) Installation and maintenance of erosion and sediment controls. (B) Qualified personnel (provided by the operator of the construction site) must inspect disturbed areas of any construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, structural control measures, and locations where vehicles enter or exit the site, at least once every 14 calendar days and within 24 hours of the end of a storm event that is 0.5 inches or greater. Inspections may be performed once every seven calendar days, on a specifically defined day, regardless of whether or not there has been a rainfall event. All erosion and sediment control measures and other identified best management practices must be observed in order to ensure that they are operating correctly and are effective in preventing significant impacts to receiving waters and the MS4. Based on the results of the inspection, best management practices must be modified as appropriate, and as soon as is practicable. (C) Any owner of a site of construction activity, whether or not he/she is an operator, is jointly and severally responsible for compliance with the requirements in this section 173.07. (D) Any contractor or subcontractor on a site of construction activity, who is not an owner or operator, but who is responsible under his/her contract or subcontract for implementing a best management practices control measure, is jointly and severally responsible for any willful or negligent failure on his/her part to adequately implement that control measure.

( Ordinance 3308 , adopted 7/7/2009 ; Am. Ordinance 3714 , § 5, adopted 12/1/2015 )

Ask a question about Carrollton law

Corpus searches the Carrollton sections it holds and shows the ones that match, with their citations. Free, no sign-in.