§ 173.08: One acre or greater land disturbances and post-construction regulations.
(A) One acre or greater land disturbances. All operators of sites of construction activity, including clearing, grading, excavation, demolitions, and land filling activities, that result in the disturbance of one or more acres of total land area, or that are part of a larger common plan of development or sale within which one or more acres of total land area are disturbed, and who are required to obtain a TPDES permit for stormwater discharges associated with construction activity, must comply with the following requirements (in addition to those in section 173.07): (1) All operators must obtain coverage for stormwater discharges from a construction site under the TPDES general permit, must post a signed copy of its construction site notice (CSN) on the construction site prior to the commencement of construction activities. The notices required to be posted will depend on the size of the construction project and is explained in the TPDES general permit for construction activities. The CSN must be posted in a location where it is safely and readily available for viewing by the general public, local, state, and federal authorities. For large construction sites, a signed copy of the NOI and CSN from all operators must be submitted to the DCO seven days prior to the commencement of construction activities. For small construction sites, a signed copy of the CSN from all operators must be submitted to the DCO at least two days prior to the commencement of construction activities. (2) A stormwater pollution prevention plan (SWPPP) must be prepared and implemented in accordance with the requirements of the TPDES permit issued for stormwater discharges from the construction site, and in accordance with any additional requirements imposed by or under this ordinance and any other city ordinance. (3) The SWPPP must be completed and implemented prior to the beginning of construction activities. The SWPPP must be updated and modified as required by the TPDES permit and this ordinance. (4) The operator must submit the SWPPP and any modifications thereto to the DCO for review prior to commencement of construction activity at the site. (5) If upon the DCO's review of the SWPPP (or any modification to the SWPPP) and any site inspection that the DCO may conduct, the DCO determines that the SWPPP does not comply with the requirements of the TPDES permit issued for stormwater discharge from the construction site, or any additional requirement imposed by or under this ordinance, the DCO may issue an order prohibiting the commencement or the continuation of any construction activity at the site. Also, if at any time the DCO determines that the SWPPP is not being fully implemented the DCO may similarly issue an order prohibiting the continuation of any construction activity at the site. (6) Upon review of the SWPPP and any site inspection that is conducted, the DCO may deny approval of any building permit, grading permit, or any other city approval necessary to commence or continue construction, or to assume occupancy, on the grounds that the SWPPP does not comply with the requirements of the permit issued for stormwater discharge from the construction site, or any additional requirement imposed by or under this ordinance. Also, if at any time the DCO determines that the SWPPP is not being fully implemented, the DCO may similarly deny approval of any building permit, grading permit or any other city approval necessary to commence or continue construction, or to assume occupancy, at the site. (7) All operators identified in the SWPPP must sign a copy of the following certification statement before conducting any professional service identified in the SWPPP: I certify under penalty of law that I understand the terms and conditions of the Texas Pollutant Discharge Elimination System (TPDES) permit and any modification by the State of Texas that authorizes the stormwater discharges associated with industrial activity from the construction site identified as part of this certification, the Stormwater Pollution Prevention Ordinance or the City of Carrollton, and those provisions of the stormwater pollution prevention plan (SWPPP) for the construction site for which I am responsible. The certification must include the name and title of the person providing the signature; the name, address, and telephone number of the contracting firm; the address (or other identifying description) of the site; and the date the certification is made. (8) The SWPPP and the certifications of all operators required by section l73.08(A)(7), and with any modifications attached, must be retained at the construction site from the date of commencement of construction through the date of final stabilization, and the required Notice of Termination (NOT) has been submitted in accordance with the TPDES permit. (9) The operator must make a copy of the SWPPP and any modification thereto available to the DCO at the construction site upon request. (10) The DCO may notify the operator at any time that the SWPPP does not meet the requirements of the TPDES permit issued for stormwater discharges from the construction site, or any additional requirement imposed by or under this ordinance. Such notification must identify those provisions of the permit or ordinance which are not being met by the SWPPP and identify which provisions of the SWPPP require modifications in order to meet such requirements. Within seven calendar days of such notification from the DCO (or as otherwise provided by the DCO), the operator must make the required changes to the SWPPP and submit to the DCO a written certification that the requested modifications have been made. (11) The operator must modify the SWPPP whenever there is a change in design, construction, operation, or maintenance which has a significant effect on the potential for the discharge of pollutants to the MS4, or surface water in the state, or the waters of the U.S., or if the SWPPP proves to be ineffective in eliminating or significantly minimizing pollutants, or in achieving the general objective of controlling pollutants in stormwater discharges associated with construction activity. (12) Qualified personnel (provided by the operator) must inspect at least once every 14 calendar days and within 24 hours of the end of any rain event that is 0.5 inches or greater: disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, structural control measures, and locations where vehicles enter or exit the site. Inspections may be performed once every seven calendar days, on a specifically defined day, regardless of whether or not there has been a rainfall event. Disturbed areas and areas used for storage of materials that are exposed to precipitation must be inspected for evidence of, or the potential for, pollutants entering the drainage system. Erosion and sediment control measures and best management practices must be observed to ensure that they are operating correctly. Where discharge locations or points are accessible, they must be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to receiving waters and the MS4. Locations where vehicles enter or exit the site must be inspected for evidence of off-site sediment tracking. (13) All protective measures in the SWPPP must be maintained in effective operating condition. If, through inspections or other means, the operator determines that BMPs are not operating effectively, then the operator shall perform maintenance as necessary to maintain the continued effectiveness of stormwater controls, prior to the next rain event if feasible. If maintenance prior to the next anticipated rain event is impracticable, the reason shall be documented in the SWPPP and maintenance must be scheduled and accomplished as soon as practicable, but in no case later than seven calendar days following the inspection. Erosion and sediment controls that have been intentionally disabled, run over, removed, or otherwise rendered ineffective must be replaced or corrected immediately upon discovery. (14) A report summarizing the scope of any inspection required by section 173.08(12) and the name(s) and qualifications of personnel making the inspection, the date(s) of the inspection, major observations relating to the implementation of the SWPPP, and actions taken in accordance with appropriate plan revisions must be made and retained as part of the SWPPP. The report must identify any incidence of noncompliance; or if the report does not identify any incidence of noncompliance, the report must contain a certification that the facility is in compliance with the SWPPP, the TPDES permit, and this ordinance. The report must be signed by the person responsible for making it. (15) The operator must retain copies of any SWPPP and all reports required by this ordinance or by the TPDES permit for the site, for a period of at least three years from the date that the site is finally stabilized, and the required CSN or notice of termination (NOT) has been submitted. Such plans, reports and records must be made available to the DCO upon request. (16) Where a site has been finally stabilized and all stormwater discharges from construction activities that are authorized by this ordinance and by the TPDES permit are eliminated, or where the operator of all stormwater discharges from the construction site changes, the operator of the construction site must submit to the DCO a copy of the CSN or NOT as required by the TPDES construction general permit. (17) The city may withhold an occupancy permit for any premises constructed on the site until such certification of final stabilization has been filed and the DCO has determined, following any appropriate inspection, that final stabilization has in fact occurred, that any required permanent structural controls have been completed and all temporary controls have been removed. (B) Post-construction requirements. (1) The owner or operator must ensure all temporary control measures for erosion control or other BMPs are removed once final stabilization has been achieved. (2) The owner or operator must ensure all long-term operation and maintenance of post-construction stormwater runoff control mechanisms, such as detention and retention basins, dry wells, and other measures.
( Ordinance 3308 , adopted 7/7/2009 ; Am. Ordinance 3714 , § 6, adopted 12/1/2015 ; Ordinance 3991 , §§ 15—17, adopted 1/12/2021 )