For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.6 — Responsibility for Payment for Installation Costs

Code of Ordinances of the City of College Station, Texas (Supp. No. 10 Update 2: codified through Ordinance No. 2026-4726, adopted October 22, 2026) · College Station Land Development Ordinances, App. A, § 8.6

Corpus is an independent public-information project, not the official City of College Station website. Stable reference: corpuslaw.us/code/e296f8f1-d629-4f94-a0a5-70ec3b1980a3

Sec. 8.6. - Responsibility for Payment for Installation Costs.

A. Developer Responsibilities. The developer shall be responsible for the designing and installing of all public improvements which primarily serve the subdivision. This includes being responsible for the costs associated therewith that are shown on the plat or that may be off-site but needed to ensure the adequacy of public facilities and services for the subdivision; and subject to participation by the City or other third parties as may be allowed or required by applicable law, such as participation by the City for costs associated with oversizing of public improvements beyond that which is necessary to serve the subdivision. Facilities required by this UDO and the City of College Station Code of Ordinances shall be considered as primarily serving the subdivision unless otherwise determined by the City. B. Streetlights. The developer shall pay the entire cost of the subdivision streetlight installation, including the cost of service lines to supply electricity to the streetlights, and all engineering design costs. Once satisfactorily installed, approved, and accepted, the maintenance of the streetlights and the furnishing of electric energy to the streetlights shall be provided by the City. C. Street Signs. The developer will provide and install, at no cost to the City, all street name signs, including associated poles and hardware. D. Engineering Inspection and Testing. 1. The City will charge for engineering inspection during construction and for final inspection as established by City Council resolution from time to time; however, it is to be understood that the City will do no layout work or daily inspection. 2. The City requires testing by an independent laboratory acceptable to the City to ensure compliance with the Bryan/College Station Unified Design Guidelines and the Bryan/College Station Unified Technical Specifications and approved plans and specifications of the construction of the infrastructure before final inspection and approval of that infrastructure. Charges for such testing shall be paid by the project owner/developer.

(Ord. No. 2023-4453, Pt. 1(Exh. A), 8-10-2023)

Ask a question about College Station law

Corpus searches the College Station sections it holds and shows the ones that match, with their citations. Free, no sign-in.