Sec. 98.21 - Method of construction.
(A) Generally. The walk shall be excavated five inches and the foundation tamped. The layer of sand, gravel or cinders shall then be placed and tamped. This layer may be omitted in sand. A four-inch layer of concrete shall then be placed and tamped. The course of dry mix topping shall then be evenly spread on the surface while the concrete is still green, and well troweled in and shaped to a true even surface. On combined curb and gutter and curb construction, the course of topping shall be laid before the concrete takes its final set. (B) Finish. All walks, combined curb and gutters and curbs shall have a steel troweled finish. Care must be taken that no trowel marks are left showing and that no low or high spots are left in surface. In combined curb and gutter and curb work after topping has been sufficiently troweled to insure proper bond between core and topping, the surface shall be lightly brushed. In walk work, the surface shall be troweled until sufficient mortar and water from base of walk has come to top to permit proper working of dry mix top. After being troweled, the top shall be brushed and floated with wood float. No slick finish will be permitted. (C) Mixing. (1) All concrete shall be mixed either on a good board platform, in a box or in a batch mixer. Mixing on the ground or in a continuous mixer shall not be permitted. If the concrete is mixed by hand, it shall be turned not less than three times dry. In making the cement mortar, the cement and sand shall be mixed dry before adding water. (2) The contractor shall measure all gravel and sand in square boxes, the dimensions of which shall be satisfactory to the City Engineer. (3) When the mixing is done by hand, the contractor shall use a bottomless box on a plank platform. (D) Fill. When the work is on fill, the fill shall be made of good loam or clay containing no sticks or organic matter. The fill shall be made in layers of not more than six inches and each layer wet and tamped. (E) Radius. The radius of the combined curb and gutter or curb at street intersections shall be: (1) In the residential district, 20 feet. (2) In the business district or where the walk extends from property line to curb, the distance from property line to curb. (3) The radius of the corners at alleys and on driveways shall be as set by the City Engineer. (F) Clean up. When the work is completed, the contractor shall clean up the parking or space between the curb and walk to the grade given in these specifications and shall dispose of all surplus excavated and construction materials. (G) Warning lights. The contractor shall maintain red lights on all concrete work under construction or repair and all materials and forms used in construction or repair from sundown to sunrise each day.
(`82 Code, §§ 19-27—19-29) (Ord. 106, passed 2-21-50)
Ask a question about Edinburg law
Corpus searches the Edinburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.