SECTION 5.05 — INSPECTION, MAINTENANCE & ACCEPTANCE OF PUBLIC IMPROVEMENTS

Code of Ordinances, City of Frisco, Texas (Frisco City Code, Home Rule Charter and Code Appendix current through Ordinance 2026-10-64 adopted October 20, 2026 (eCode360 publication FR6313, scraped 2026-11-18)) · Frisco City Code § SECTION 5.05

Corpus is an independent public-information project, not the official City of Frisco website. Stable reference: corpuslaw.us/code/631e7a91-c12e-4cfe-9a8d-64aa990adcd5

SECTION 5.05: INSPECTION, MAINTENANCE & ACCEPTANCE OF PUBLIC IMPROVEMENTS.

(a) Inspections. (1) The Director of Engineering services shall inspect the construction of improvements while in progress, as well as upon completion. The applicant, or his contractor, shall maintain contact with the Director of Engineering Services during construction of improvements. (2) Construction shall be in accordance with the approved Construction Plans. Any significant change in design required during construction shall be made by the applicant's engineer, and shall be subject to approval by the Director of Engineering Services. (3) If the Director of Engineering Services finds, upon inspection, that any of the required public improvements have not been constructed properly and in accordance with the approved Construction Plans, the applicant shall be responsible for completing and/or correcting the public improvements to bring such into compliance. (b) Maintenance During Construction. The applicant shall maintain all required public improvements during construction of the development. (c) Submission of Record Drawings. The City shall accept required public improvements when the applicant's engineer has certified to the Director of Engineering Services, through submission of detailed "record" drawings of the project and filed copies of any off-site easements, unless otherwise noted within the Subdivision Ordinance, that the public improvements have been built in accordance with the approved Construction Plans. The City shall not accept improvements until the Final Plat is approved by the City and recorded at the County. Each record drawing sheet shall show all changes made in the plans during construction, and on each sheet, there shall be a "record" stamp bearing the signature of the engineer and date. Detailed requirements for such drawings are available in Engineering Services. (d) Acceptance or Rejection of Improvements by Director of Engineering Services. (1) Responsible Official. The Director of Engineering Services shall be responsible for inspecting all required public improvements shown in the Construction Plans, and for accepting completed subdivision improvements intended for dedication to the City. (2) Final Inspection. After completion of all improvements, franchise utilities, grading, and erosion control, the Director of Engineering Services, the Director of Public Works, the Director of Parks & Recreation, and other designated representatives (as applicable) will perform a final inspection before recommending acceptance of the improvements. (3) Letter of Final Acceptance. If all improvements are completed, inspected, tested (if applicable), and determined by the City to be in conformance with this Subdivision Ordinance and with the City's design standards, then the Director of Engineering Services shall issue a Letter of Final Acceptance to the applicant, thereby notifying the applicant of the City's acceptance. (4) Meaning of Acceptance. Acceptance of the improvements shall mean that the applicant has transferred all rights to all the public improvements to the City for title, use and maintenance. (5) Rejection. The Director of Engineering Services shall reject those improvements that fail to comply with the City's standards and specifications. The City shall enforce the guarantee provided by agreement(s). (e) Disclaimer. Approval of a Preliminary Plat or Final Plat by the Commission, or Construction Plans by the Director of Engineering Services, shall not constitute acceptance of any of the public improvements required to serve the subdivision or development. No public improvements shall be accepted for dedication by the City except in accordance with this Section. (f) Acceptance of Improvements for Land in Extraterritorial Jurisdiction (ETJ). Where the improvements to be constructed under an Improvement Agreement are located within the City's ETJ and are to be dedicated to a County, the Director of Engineering Services shall inform the County that the public improvements have been constructed in accordance with approved Construction Plans, and are ready for acceptance by the County. (g) Maintenance Bond Following Acceptance. The applicant shall furnish to the Director of Engineering Services a sufficient maintenance bond with a reputable and solvent corporate surety registered with the State of Texas, in favor of the City, to indemnify the City against any repairs. The bond shall be in effect for two (2) years from the date of final acceptance of the entire project. The bond, which is a part of the requirements for final acceptance, shall be a minimum of one hundred and ten percent (110%) of the value of the work constructed. Final acceptance shall be withheld until said maintenance bond is furnished to the City in a form acceptable by the City Attorney. Once the maintenance bond has been examined and approved by the City Attorney, the City Attorney shall certify the bond is valid and enforceable as provided by law prior to recommending acceptance by the Director of Engineering Services. The applicant shall reimburse the City for all related legal costs for review (this reimbursement shall be paid in full prior to filing of the Final Plat).

( Ordinance 19-08-70 adopted 8/20/2019 )