§ 78-26: Field utility coordination.
(a) The right-of-way user shall notify the department at each of the following times during a project and failure to do so constitutes a violation of this article: (1) Forty-eight hours before the start of construction; (2) Upon completion of the initial backfill; and (3) Upon completion of the project. (b) The use of markets, stakes, poles, barricades or other devices shall be used in such a way to avoid damage to adjoining property. A person shall only use a water-based paint in the public right-of-way to mark the location of existing underground utilities. A person commits an offense if the person makes a marking in the public right-of-way for the purpose of identifying the location of existing underground utility facilities and such marking remains visible longer than sixty (60) days after being applied. (c) Compliance with the Texas Utilities Code, as amended, is required at all times. (d) All barricades, plates, cones, traffic directional equipment and all other traffic control devices owned, leased or used by the right-of-way user and used on or near any excavation shall be clearly and visibly marked with the name of the permittee and/or right-of-way user or subcontractor, as applicable, at all times such equipment is used on or near the right-of-way. An exception to the marking requirement may be made in the sole discretion of the right-of-way manager in the event the traffic control equipment is not owned by the permittee or right-of-way user. (e) Location of facilities. (1) A permit does not relieve a right-of-way user of the responsibility to coordinate with other utilities and to protect existing facilities. A right-of-way user working in the right-of-way shall obtain line locates from all affected utilities or others with facilities in the right-of-way prior to any excavation. Use of the geographic information system or the plans of record does not satisfy this requirement. (2) In performing location of facilities in the public rights-of-way in preparation for construction under a permit, the right-of-way user is responsible for compiling all information obtained regarding its or any other facilities in the public rights-of-way related to a particular permit and shall make that information available to the city in a written and verified format acceptable to the right-of-way manager. (3) Before beginning excavation in any public right-of-way, the right-of-way user shall establish that the right-of-way user will work exclusively in the public right-of-way. If a property owner or other person with control over real property contacts the city with a concern that a right-of-way user intends to or is working on their property without authorization, the right-of-way manager may require the right-of-way user to stake the boundaries of the affected public right-of-way. (4) For new construction involving light poles and the removal, disconnection or relocation of light poles, the right-of-way user shall contact and coordinate with the city's roadway lighting division before doing or authorizing any such work. (f) Protection of facilities. (1) Before beginning excavation in any public right-of-way, a right-of-way user shall: a. Make a request with the Texas One-Call System for facility locates and any possible conflicts in compliance with the Underground Facility Damage Prevention and Safety Act (chapter 251 of the Texas Utilities Code, as amended, and 16 Tex. Admin. Code chapter 18, as amended); b. Make a request with the department for facility locates and any possible conflicts; and c. Make inquiries of all utility companies, districts, other local government entities and all other agencies that might have facilities in the area of work to determine the location of such facilities and any possible conflicts. (2) Facility locations shall be marked prior to commencing work. The right-of-way user shall support and protect all pipes, structures, conduits, poles, wires or other apparatus that may be affected by the work from damage during construction or settlement of trenches subsequent to construction. (3) It shall be unlawful for a right-of-way user to work in the public right-of-way without having a valid and unexpired line locate confirmation number issued by the department. Information provided by the department regarding facility locations shall be valid for 18 calendar days or the expiration date that the department's assigned line locater indicates on the department-issued line locate request form, whichever period is greater. (4) No facility may be placed within four feet (4') horizontally, of or within any distance above, an existing or proposed city facility without a city-approved encroachment agreement, unless otherwise approved by the director of the department. (g) Work in the public right-of-way shall be done in a manner that causes the least interference with the rights and reasonable convenience of property owners and residents. (h) If the right-of-way user's work in the right-of-way involves more than five hundred (500) feet of continuous trenching or boring or the installation of more than three (3) new node support poles or more than three (3) electrical meter pedestals or ground boxes, then the right-of-way-user shall submit to the city daily work location information, on the form provided by the city, each day before work can begin.
( Ordinance 02-05-65 , sec. 3(1.4), adopted 5/7/02 ; Ordinance 16-09-70 , sec. 2, adopted 9/6/16 ; Ordinance 17-08-58 , sec. 2, adopted 8/15/17 ; Ordinance 2022-11-63 adopted 11/15/2022 ; Ordinance 2025-05-30 adopted 5/20/2025 )
Ask a question about Frisco law
Corpus searches the Frisco sections it holds and shows the ones that match, with their citations. Free, no sign-in.