§ 78-35 — Exceptions to required permit
Code of Ordinances, City of Frisco, Texas (Frisco City Code, Home Rule Charter and Code Appendix current through Ordinance 2026-10-64 adopted October 20, 2026 (eCode360 publication FR6313, scraped 2026-11-18)) · Frisco City Code § 78-35
Corpus is an independent public-information project, not the official City of Frisco website. Stable reference: corpuslaw.us/code/a565dcc8-70a5-45e8-9571-7f58130dceed
§ 78-35: Exceptions to required permit.
(a) The right-of-way manager reserves the right in his discretion to require a right-of-way permit on service connections. Unless otherwise required by the right-of-way manager, service connections do not require a permit if all of the following conditions are met: (1) The service connection excavation shall not exceed four feet inside the right-of-way to property line; (2) All excavation shall be in accordance with service connection drawings; (3) The address for the service connection is on the city provided form, which is submitted to the right-of-way manager via e-mail. Work shall not begin until the electronic form is transmitted to the right-of-way manager; (4) The excavation required is less than 18 inches in depth; (5) The excavation is no wider than two inches or is hand dug; and (6) The service connection does not require boring. (b) Irrigation and backflow system installation does not require a right-of-way permit if all of the following conditions are met: (1) The work is performed with an existing valid irrigation or backflow permit issued by the city for the installation of an irrigation or backflow system, as applicable; (2) The excavation does not exceed 18 inches in depth and 24 inches in width; (3) The address for the site of the work is listed on the irrigation or backflow permit; and (4) Line locates from the city are not required provided that the right-of-way user performing the work accepts full responsibility for any damages to or interference with city facilities caused by such work. (c) New construction of single-family residential driveways, sidewalks, mailboxes and minor earthwork grading of single-family residential lots (less than 18 inches in depth) does not require a permit if all of the following conditions are met: (1) The work is performed with an existing valid residential building permit issued by the city for the residential building; (2) The excavation does not exceed 18 inches in depth; (3) The address for the new residential construction is listed on the residential building permit and the building permit has not expired or been closed or terminated; and (4) Line locates from the city are not required provided that the right-of-way user performing the work accepts full responsibility for any damages to or interference with city facilities caused by such work.
( Ordinance 02-05-65 , sec. 3(1.12.1), adopted 5/7/02 ; Ordinance 17-04-25 adopted 4/4/17 ; Ordinance 2022-11-63 adopted 11/15/2022 ; Ordinance 2025-05-30 adopted 5/20/2025 )
Ask a question about Frisco law
Corpus searches the Frisco sections it holds and shows the ones that match, with their citations. Free, no sign-in.
