§ 94-305 — Permits, fees and inspection
Code of Ordinances, City of Frisco, Texas (Frisco City Code, Home Rule Charter and Code Appendix current through Ordinance 2026-10-64 adopted October 20, 2026 (eCode360 publication FR6313, scraped 2026-11-18)) · Frisco City Code § 94-305
Corpus is an independent public-information project, not the official City of Frisco website. Stable reference: corpuslaw.us/code/c98c8d32-1595-45c5-8225-0e8c4ef152b7
§ 94-305: Permits, fees and inspection.
(a) When permit required. It shall be unlawful to construct a water well or to overhaul a water well without first securing a water well permit. "Overhaul" means work that is not considered routine maintenance. (b) Permits not transferable. Each permit issued under this article shall be personal to the permittee. No such permit shall be assigned or transferred to another person, and no person shall permit another person to obtain a permit in his or her name or permit any new well construction or overhaul work to be performed under his or her permit other than a person authorized to do the same. (c) False statement or bad faith. Any person who shall willfully make any false statement in order to obtain a permit shall be guilty of a misdemeanor and subject to the penalty provided herein. Bad faith or unreasonable delay in the performance of work under this article shall be deemed a sufficient reason for suspension of the permit of the well driller so offending and no further permit shall be issued until such act of bad faith or unreasonable delay has been corrected. Water well drillers in violation of any ordinance governing contractor registration requirements may be suspended or have their registration revoked. (d) Issuance of permit. The director of public works or his or her designated representative shall issue all permits in accordance with the provisions and requirements of this article. Incomplete applications shall be rejected or denied. All applications for permits shall be on the approved and current form and provide the following information: (1) Company name, address and telephone number of the well driller. (2) Well driller's license number. (3) Name, address, legal description and telephone number of property owner. (4) Company name and city-assigned contractor registration number of irrigation contractor (if applicable). (5) Company name of backflow prevention assembly tester. (6) A plan of the property that shows the location of the proposed water well, all buildings, septic tanks, drain fields and other significant structures. The plan shall also show the location of structures and adjacent property if within ten (10) feet of the property line. All setbacks and dimensions shall be shown to be in conformance with section 94-310 (location) of this article. (7) Proof of general liability and workers compensation insurance. (8) Any other information deemed necessary by the director of public works or his or her designated representative. (e) Duration of permits. Every permit issued under the provisions of this article shall expire one hundred eighty (180) days after the date issued. In every case where a permit is expired, a new permit shall be obtained before any work is resumed. (f) Permit and inspection fees. The permit and inspection fees provided for in this article shall be paid to the city before the issuance of a permit and before any work is started. Fees shall not be collected prior to permit approval. The fee shall be collected once an inspection is required for the following: (1) Electrical inspection fees, includes electrical underground and electrical final inspections. (2) Plumbing inspection fees, includes plumbing rough (disconnect) and plumbing final (RPBA) inspections. (3) Reinspection fees shall be in accordance with the city-approved fee schedule, as amended. (4) Whenever any work for which a permit is required by this article has been commenced or completed without first obtaining a permit, a special investigation shall be made before a permit may be issued for such work. (g) Inspections and tests. (1) The director of public works or his or her designated representative shall have the right, at any time, to enter the property for the purpose of inspections to ensure compliance with this article. In addition, the director of public works or his or her designated representative shall have the right to enter the property at any time in the future for the purpose of inspections to ensure that there are no cross connections pursuant to Ordinance 18-05-24, as it exists or may be amended. Such right of entry is a condition of the person's privilege to drill and operate a water well under this article. (2) Director of public works or his or her designated representative may apply to the municipal court or other court of competent jurisdiction for a search warrant if a person denies the director or representative access to the property for such purposes or if the director or representative has probable cause to believe there is a violation of this article or other enforcement order, a need to conduct a required inspection or a threat to public health or safety. (3) The original permit packet shall be located at the water meter at all times during construction. Adequate provisions must be made to protect piping from freezing by insulation or heat or both on all water wells and RPBAs. A RPBA is the only approved backflow prevention assembly allowed on properties with water wells located within the city, its extraterritorial jurisdiction or any other premises connected to the approved water supply source. (4) The RPBA is to be installed at or near the point where the approved water supply source enters the premises on the owner's side of the property line. For purposes of this article, the service connection shall mean where the approved water supply enters the premises. (5) The following inspections shall be required on all water wells drilled in the city limits or in the extraterritorial jurisdiction (ETJ) of the city, at any location within a radius of one thousand (1,000) feet of the city limits: (A) Plumbing rough to verify the disconnection of the existing irrigation system from the approved water supply source (if applicable). (B) Plumbing final to determine the proper installation of the RPBA. The original backflow assembly test report, on an approved city form, must be in the permit packet at time of inspection (if applicable). (C) Electrical underground (EUG) to verify trench depth and proper wire is used (size and type). (D) Electrical final to verify disconnects are installed and appropriate panel box in place (weather tight). (E) Upon completion of the water well, the well driller shall furnish the director of public works or his or her designated representative with a copy of the driller's report and a copy of the water analysis. Any well that is not completed shall be sealed and considered a plugged or an abandoned well in accordance with rules, regulations and statues of the state. (F) A backflow assembly test report, on an approved city form, shall be submitted annually, within twelve months from the last test. Only a state-licensed, city-registered backflow prevention assembly tester (BPAT) shall perform the test pursuant to Ordinance 18-05-24, as it exists or may be amended.
( Ordinance 19-05-39 adopted 5/21/19 )
Ask a question about Frisco law
Corpus searches the Frisco sections it holds and shows the ones that match, with their citations. Free, no sign-in.
