For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22.144 — Wastewater discharge permit issuance process

Code of Ordinances of the City of Garland, Texas (Garland Code of Ordinances, Home Rule Charter and Garland Development Code current through Ordinance 7697 adopted August 17, 2026 (eCode360 publication GA6318, scraped 2026-11-17)) · Garland Code of Ordinances § 22.144

Corpus is an independent public-information project, not the official City of Garland website. Stable reference: corpuslaw.us/code/18661a29-c13a-41e8-b540-0b83f4c3bcfe

§ 22.144: Wastewater discharge permit issuance process.

(A) Wastewater discharge permit duration. Wastewater discharge permits shall generally be valid from the date of issuance until the last day of September, of the fifth year after issuance (five-year permit period). A wastewater discharge permit may be issued for a period of less than five (5) years, at the discretion of the control authority. Each wastewater discharge permit shall indicate the specific date upon which it will expire. (B) Wastewater discharge permit contents. Wastewater discharge permits shall include such conditions as are reasonably deemed necessary by the control authority to prevent pass through or interference, protect the quality of the water body receiving the POTW’s effluent, protect worker health and safety, facilitate sludge management and disposal, protect ambient air quality, and protect against damage to the POTW. (1) Wastewater discharge permits shall contain the following conditions: (a) A statement that indicates wastewater discharge permit duration, which in no event shall exceed five (5) years. (b) A statement that the wastewater discharge permit is nontransferable without prior notification to the control authority in accordance with section 22.144(D) of this article, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit. (c) Effluent limits, including BMPs, applicable to the user based on applicable standards in federal, state, and local law. (d) Self-monitoring, sampling, reporting, notification, and recordkeeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law. (e) Statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law. (f) Requirements to control slug discharges, if determined by the control authority to be necessary. (2) Wastewater discharge permits may also contain, at the discretion of the control authority, the following: (a) Limits on the average and maximum rate of discharge, time of discharge, or requirements for flow regulation and equalization. (b) Limits on the instantaneous, daily, and monthly average or maximum concentration, mass, or other measure of identified wastewater pollutants or properties. (c) Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the POTW. (d) Development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or non-routine discharges. (e) Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW. (f) The schedule of industrial user charges and fees for wastewater discharged to the POTW. (g) Requirements for installation and maintenance of inspection and sampling facilities and equipment. (h) A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal standards, including those which become effective during the term of the wastewater discharge permit. (i) Other conditions as deemed appropriate by the control authority to ensure compliance with this article, and federal, state, and local laws, rules, and regulations. (C) Wastewater discharge permit modification. The control authority may modify the wastewater discharge permit for good cause including, but not limited to, the following: (1) To incorporate any new or revised federal, state, or local pretreatment standards or requirements. (2) To address significant alterations or additions to the industrial user’s operation, processes, or wastewater volume or character since the time of wastewater discharge permit issuance. (3) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge. (4) Information indicating that the permitted discharge poses a threat to the city’s POTW, personnel, or the receiving waters. (5) Violation of any terms or conditions of the wastewater discharge permit. (6) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting. (7) Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13. (8) To correct typographical or other errors in the wastewater discharge permit. The filing of a request by the permittee for a wastewater discharge permit modification does not stay any wastewater discharge permit condition. (D) Wastewater discharge permit transfer. Wastewater discharge permits may be transferred to a new owner or operator only if the permittee gives at least thirty (30) days advance notice to the control authority and the control authority approves the wastewater discharge permit transfer. The notice to the control authority must include a written certification by the new owner or operator which: (1) States that the new owner and/or operator have no immediate intent to change the facility’s operations and processes; (2) Identifies the specific date on which the transfer is to occur; and (3) Acknowledges full responsibility for complying with the existing wastewater discharge permit. Failure to provide advance notice of a transfer renders the wastewater discharge permit void as of the date of facility transfer. (E) Wastewater discharge permit suspension. Wastewater discharge permits may be suspended for the following reasons: (1) Failure to notify the control authority of significant changes to the wastewater prior to the changed discharge. (2) Failure to provide prior notification to the control authority of changed condition pursuant to section 22.145(E). (3) Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application. (4) Falsifying self-monitoring reports and certification statements. (5) Tampering with monitoring equipment. (6) Refusing to allow the control authority timely access to the facility premises and records. (7) Failure to meet effluent limitations. (8) Failure to remit fines or penalties after a final, non-appealable judgment has been rendered thereon. (9) Failure to pay sewer charges (including industrial waste surcharge). (10) Failure to meet compliance schedules. (11) Failure to complete a wastewater survey or the wastewater discharge permit application. (12) Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit or this article. Wastewater discharge permits shall be voidable upon nonuse or cessation of operations. All wastewater discharge permits are void upon the issuance of a new wastewater discharge permit. Permittees with suspended wastewater permits shall admit no wastewater to the POTW. (F) Industrial waste board appeal. (1) Any applicant denied a permit under this article, or any permittee whose permit has been suspended, shall have the right to a hearing before the industrial waste board. (2) Requests for a hearing shall be made in writing and received by the control authority within ten (10) days of the action complained of. The control authority, within five (5) days of receipt of the request, shall schedule a hearing before the industrial waste board. (3) The industrial waste board shall have the authority to review all pertinent files and information regarding the applicant/permittee which are in the custody of the control authority. Additionally, the Board shall have the authority to accept written and verbal testimony from the control authority, applicant, and interested citizens. (4) The board shall have the authority to assess whether the control authority acted properly within its power under this article in its denial or suspension of permit. The majority vote of the Board shall determine whether to uphold or reject the control authority’s action. Upholding the action of the control authority shall affirm the denial or suspension. Rejection of the control authority’s actions shall automatically reinstate a suspended permit or shall cause the control authority to repeat the application process. (5) The board shall have no authority to review or act on any action of the control authority other than permit denials or permit suspensions. (6) No person whose wastewater discharge permit has been denied or suspended shall discharge industrial waste to the public sewer prior to final determination by the industrial waste board. (G) Wastewater discharge permit re-issuance. A significant industrial user shall apply for wastewater discharge permit re-issuance by submitting a complete wastewater discharge permit application in accordance with section 22.143(F) a minimum of thirty (30) days prior to the expiration of the industrial user’s existing wastewater discharge permit.

( Ordinance 4646 , sec. 1, adopted 12/22/92 ; Ordinance 5544 , sec. 1, adopted 3/20/01 ; Ordinance 5936 , secs. 2–4, 9/20/05 ; Ordinance 6417 , sec. 1, adopted 8/17/10 ; Ordinance 7203 , sec. 3, adopted 3/2/21 )

Ask a question about Garland law

Corpus searches the Garland sections it holds and shows the ones that match, with their citations. Free, no sign-in.