For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22.145 — Reporting requirements

Code of Ordinances of the City of Garland, Texas (Garland Code of Ordinances, Home Rule Charter and Garland Development Code current through Ordinance 7697 adopted August 17, 2026 (eCode360 publication GA6318, scraped 2026-11-17)) · Garland Code of Ordinances § 22.145

Corpus is an independent public-information project, not the official City of Garland website. Stable reference: corpuslaw.us/code/084d19bd-5c62-4902-a40b-9545ad6c645a

§ 22.145: Reporting requirements.

(A) Baseline monitoring reports. (1) Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing significant industrial users subject to such categorical pretreatment standards, and currently discharging to or scheduled to discharge to the POTW, shall submit to the control authority a report which contains the information listed in subsection (2), below. At least ninety (90) days prior to commencement of their discharge, new sources, and sources that become industrial users subsequent to the promulgation of an applicable categorical standard, shall submit to the control authority a report which contains the information listed in subsection (2), below. A new source shall also report the method of pretreatment it intends to sue to meet applicable pretreatment standards. A new source shall also give estimates of its anticipated flow and quantity of pollutants discharged. (2) The industrial user shall submit the following information required by the section including: (a) Identifying information. The name and address of the facility including the name of the operator and owners. (b) Wastewater discharge permits. A list of any environmental control wastewater discharge permits held by or for the facility. (c) Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such industrial user. This description shall include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes. (d) Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined waste stream formula set out in 40 CFR 403.6(e). (e) Measure of pollutants. (i) Identify the categorical pretreatment standard applicable to each regulated process. (ii) Submit the results of sampling an analysis identifying the nature and concentration (and mass, where required by the standard or by the control authority) of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum and long-term average concentrations (or mass, where required) shall be reported. The sample shall be representative of daily operations and shall by analyzed in accordance with procedures set out in section 22.145(J). In cases where the standard requires compliance with a best management practice or pollution prevention alternative, the user shall submit documentation as required by the control authority or the applicable standards to determine compliance with the standard. (iii) Sampling must be performed in accordance with procedures set out in section 22.145(K). (iv) The control authority may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures. (f) Certification. A statement reviewed and signed by the industrial user’s authorized representative indicating whether pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance and additional pretreatment is required to meet the pretreatment standards and requirements. (g) Compliance schedule. If additional pretreatment and O&M will be required to meet the pretreatment standards, the shortest schedule by which the industrial user will provide such additional pretreatment and O&M shall be required. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. (h) Signatories and certification. All baseline monitoring reports must be signed and certified in accordance with section 22.143(G). (B) Compliance schedule progress report. The following conditions shall apply to the schedule require by 22.145(A)(2)(g). The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events may include hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, beginning and conducting routine operation.) No increment referred to above shall exceed thirty (30) days. The industrial user shall submit a progress report to the control authority no later than 14 days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay and, if appropriate the steps being taken by the industrial user to return to the established schedule. In no event shall more than thirty (30) days elapse between such progress reports to the control authority. (C) Report on compliance with categorical pretreatment standard deadline. Within ninety (90) days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the POTW, any industrial user subject to such pretreatment standards and requirements shall submit to the control authority a report containing the information described in section 22.145(A)(2)(d)–(f). For industrial users subject to the equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), the report shall contain a reasonable measure of the industrial user’s actual production during the appropriate sampling period. All compliance reports shall be signed and certified in accordance with section 22.143(G). (D) Periodic compliance reports. (1) All significant industrial users shall, on the dates and at a frequency determined by the control authority but in no case less than twice per year, submit a report indicating the nature, concentration of pollutants in the discharge which are limited by pretreatment standards and the measured or estimated average and maximum daily flows of the reported period. In cases where the pretreatment standard requires compliance with a best management practice (BMP) or pollution prevention alternative, the user must submit documentation required by control authority or the pretreatment standard necessary to determine compliance status of the user. All periodic compliance reports shall be signed and certified in accordance with section 22.143(G). This sampling and analysis may be performed by the control authority in lieu of the industrial user. Where the POTW performs the required sampling and analysis in lieu of the industrial user, the user will not be required to submit the compliance certification required in section 22.143(G) of this article. In addition, where the POTW itself collects all the information required for the report, including flow data, the industrial user will not be required to submit the report. (2) All wastewater samples must be representative of the industrial user’s discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of an industrial user to keep its monitoring facility in good working order shall not be grounds for the industrial user to claim that sample results are unrepresentative of its discharge. (3) If an industrial user subject to the reporting requirement of this section monitors any regulated pollutant at the appropriate sampling location more frequently than required by the POTW, using the procedures prescribed in section 22.145(J) and section 22.145(K) of this article the results of such monitoring shall be included in the report. (E) Report of changed conditions. Each industrial user is required to notify the control authority of any planned significant changes to the industrial user’s operations or system which might alter the nature, quality, or volume of its wastewater at least five (5) working days before the change. (1) The control authority may require the industrial user to submit such information as may be deemed necessary to evaluate the change condition, including the submission of a wastewater discharge permit application under section 22.143(F). (2) The control authority may issue a wastewater discharge permit or modify an existing wastewater discharge permit under section 22.144. (3) No industrial user shall implement the planned changed condition(s) until and unless the control authority has responded to the industrial user’s notice. (4) For purposes of this requirement flow increases of twenty percent (20%) of the average daily or monthly flow (based on the previous year averages) or greater, a twenty percent (20%) increase in the production rate, and the discharge of any previously unreported pollutants, shall be deemed significant. (F) Reports of potential problems. (1) In the case of any discharge including, but no limited to, accidental discharges, discharges of a non-routine, episodic nature, a non-customary batch discharge, or a slug load which may cause potential problems for the POTW (including a violation of the prohibited discharge standards in section 22.141(A) of this article), it is the responsibility of the industrial user to immediately telephone and notify the control authority of the incident. Notification shall include the location of discharge, type of waste, concentration, and volume, if known, and corrective actions taken by the industrial user. (2) Within five (5) days following such discharge, the industrial user shall, unless waived by the control authority, submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the industrial user to prevent similar future occurrences. Such notification shall not relieve the industrial user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the industrial user of any fines, civil penalties, or other liability which may be imposed by this article or other law. (3) Failure to notify the control authority of potential problem discharges shall be deemed a separate violation of this article. (4) A notice shall be permanently posted on the industrial user’s bulletin board or other prominent place advising employees whom to call in the event of a discharge described in subsection (1) above. Industrial users shall ensure that all employees who may cause or suffer such a discharge to occur are advised of the emergency notification procedure. (5) Significant industrial users are required to notify the control authority immediately of any changes at its facility affecting the potential for a slug discharge. (G) Reports from non-significant industrial users. All industrial users not subject to categorical pretreatment standards and not required to obtain a wastewater discharge permit shall provide appropriate reports to the control authority as required by the control authority. (H) Notice of violation/repeat sampling and reporting. If sampling performed by an industrial user indicates a violation, the industrial user shall notify the control authority within 24 hours of becoming aware of the violation. The industrial user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the control authority within 30 days after becoming aware of the violation. Resampling by the industrial user is not required if the control authority performs sampling at the user’s facility at least once a month, or if the control authority performs sampling at the user between the time when the initial sampling was conducted and the time when the user or the control authority receives the results of this sampling, or if the control authority has performed the sampling and analysis in lieu of the industrial user. If the control authority performed the sampling and analysis in lieu of the industrial user, the control authority will perform the repeat sampling and analysis unless it notifies the user of the violation and requires the user to perform the repeat sampling and analysis and submit the results within the 30 day time frame. (I) Notification of the discharge of hazardous waste. (1) Any industrial user who commences the discharge of hazardous waste shall notify the POTW, the EPA Regional Waste Management Division Director, and state hazardous waste authorities in writing of any discharge into the POTW of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR part 261. Such notification shall include the name of the hazardous waste as set forth in 40 CFR part 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the industrial user discharges more than 100 kilograms of such waste per calendar month to the POTW, the notification shall also contain the following information to the extent such information is known and readily available to the industrial user: an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the waste stream discharged during that calendar month, and an estimation of the mass of constituents in the waste stream expected to be discharged during the following twelve (12) months. All notifications must take place no later the 180 days after the discharge commences. Any notification under this subsection need be submitted only once for each hazardous waste discharged. However, notifications of changed discharges shall be submitted under section 22.145(E), above. (2) Dischargers are exempt from the requirements of subsection (1) of this section during a calendar month in which they discharge no more than fifteen (15) kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than fifteen (15) kilograms of non-acute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification. Subsequent months during which the industrial user discharges more than such quantities of any hazardous waste do not require additional notification. (3) In the case of any new regulates under section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the industrial user shall notify the POTW, the EPA Regional Waste Management Waste Division Director, and State hazardous waste authorities of the discharge of such substance within 90 days of the effective date of such regulations. (4) In the case of any notification made under this section, the industrial user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical. (5) Industrial users that are permitted by the control authority shall submit a copy of all manifests to the control authority documenting offsite disposal of hazardous and non-hazardous waste. (J) Analytical requirements. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR part 136, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CRF part 136 does not contain sampling or analytical techniques for the pollutant in question, sampling and analyses must be performed in accordance with procedures approved by the EPA. (K) Sample collection. Samples collected to satisfy reporting requirements must be based on data obtained through appropriate sampling analysis performed during the period cover by the report, based on data that is representative of conditions occurring during the reporting period. (1) Except as indicated in subsection (2) and (3) below, the industrial user shall collect wastewater samples using 24-hour flow-proportional composite collection techniques, unless time-proportional composite sampling or grab sampling is authorized by the control authority. Where time-proportional composite sampling or grab sampling is authorized by the control authority, the samples must be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the control authority, as appropriate. In addition, grab samples may be required to show compliance with Instantaneous Limits. (2) Samples for oil and grease, temperature, pH, cyanide, phenols, sulfides, and volatile organic chemicals shall be obtained using grab collection techniques. Total residual chlorine, pH, and temperature samples cannot be composited under any circumstances. (3) For sampling required in support of baseline monitoring and 90-day compliance reports required in section 22.145(A) and section 22.145(C) [40 CFR 403.12(b) and (d)], a minimum of four (4) grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, the control authority may authorize (in writing) a lower minimum of grab samples. For the reports required by section 22.145(D) of this article, the industrial user is required to collect the number of grab samples necessary to assess and assure compliance by the applicable Pretreatment Standards and Requirements. (L) Determination of noncompliance. The control authority may use a grab sample(s) to determine noncompliance with pretreatment standards. (M) Timing. Written reports will be deemed to have been submitted on the date post-marked. For reports which are not mailed, postage prepaid, into a mail facility serviced by the U.S. Postal Service, the date of the receipt of the report shall govern. (N) Recordkeeping. Industrial users and the control authority shall retain, and make available for inspection and copying, all records and information required to be retained under this article and documentation associated with BMPs. These records shall remain available for a period of at least three (3) years. This period shall be automatically extended for the duration of any litigation concerning compliance with this article, or where the industrial user has been specially notified of a longer retention period by the control authority.

( Ordinance 4646 , sec. 1, adopted 12/22/92 ; Ordinance 5544 , sec. 1, adopted 3/20/01 ; Ordinance 6417 , sec. 1, adopted 8/17/10 ; Ordinance 7203 , sec. 4, adopted 3/2/21 )

Ask a question about Garland law

Corpus searches the Garland sections it holds and shows the ones that match, with their citations. Free, no sign-in.