For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.66 — Developer Responsibilities

Code of Ordinances of the City of Garland, Texas (Garland Code of Ordinances, Home Rule Charter and Garland Development Code current through Ordinance 7697 adopted August 17, 2026 (eCode360 publication GA6318, scraped 2026-11-17)) · Garland Development Code § 3.66

Corpus is an independent public-information project, not the official City of Garland website. Stable reference: corpuslaw.us/code/9aaec4aa-9bf4-4446-b5f0-6c90da1803f8

§ 3.66: Developer Responsibilities.

(A) Water System. (1) The developer of a subdivision shall furnish and install the complete water system, including the mains, valves, fire hydrants, service lines and appurtenances from the water main to the property line. (2) The developer shall provide all water taps and locate and raise to grade all water services. The developer shall also furnish and install the meter box, the curb stop, the approved connector pipe and the meter nipple to the location, grade and detail as shown on the Site Engineering Drawings of the development. (3) It shall be the responsibility of the developer and the developer’s contractor to protect, adjust and replace any and all service lines and meter boxes as deemed necessary by the Director of Engineering prior to the installation of the water meter. (4) The developer and the developer’s contractor shall be responsible for the protection of the service line and meter box and any expense for repair until all paving, drainage and utilities are accepted by the City. If the service line or meter box is damaged after the acceptance of paving and utilities, it shall become the responsibility and expense of the building contractor or owner of the structure to be served, to repair and replace the service line and meter box prior to the use of any construction water or the placement of the meter. (B) Wastewater System. The developer shall furnish and install the complete wastewater system, including the mains, manholes, cleanouts, and wye branches with laterals from main to property line for all lots, lift stations and appurtenances. (C) Existing Facilities. If existing facilities are affected by the proposed system, the developer shall be responsible for making appropriate adjustments to existing facilities including, but not limited to, off-site improvements and easement acquisitions. Existing facility adjustments shall be subject to Engineering and Water Department review and approval. (D) Construction. Water and wastewater systems shall be designed and incorporated into required Site Engineering Drawings (refer to Article 6, Division 1 of this Chapter 3). After City approval of Site Engineering Drawings, the developer shall construct the water and wastewater systems in accordance with the approved Site Engineering Drawings and Site Permit.

( Ordinance 6773 adopted 5/19/15 )

Ask a question about Garland law

Corpus searches the Garland sections it holds and shows the ones that match, with their citations. Free, no sign-in.