For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.69 — Wastewater System Requirements

Code of Ordinances of the City of Garland, Texas (Garland Code of Ordinances, Home Rule Charter and Garland Development Code current through Ordinance 7697 adopted August 17, 2026 (eCode360 publication GA6318, scraped 2026-11-17)) · Garland Development Code § 3.69

Corpus is an independent public-information project, not the official City of Garland website. Stable reference: corpuslaw.us/code/4dbc56e9-1575-4673-87e2-3f7bae711597

§ 3.69: Wastewater System Requirements.

(A) Site Engineering Drawings & Details. The location of all wastewater improvements shall be shown on the Site Engineering Drawings. (B) Wastewater System Layout. (1) The layout shall be designed in such a manner that the sewers may not be laid on less than the minimum grade specified by the TCEQ, and in accordance with the Technical Standards. (2) Profiles of sewers showing the grades and depths shall be submitted to the City as part of Preliminary Plat and Final Plat approval requirements, and shall be subject to review and approval by the Director of Engineering. (C) Manholes. Manholes shall be located according to the City’s Technical Standards. (D) Branches. Branch sewer services, one for each lot and not less than four inches in inside diameter (or per the Technical Standards, as applicable), shall be installed. (E) Lift Stations. All lift stations shall be designed and constructed in conformance with the latest TCEQ regulations. Detailed design data and plans and specifications of lift stations shall be submitted to the City as part of Preliminary Plat and Final Plat approval requirements, and shall be subject to review and approval by the Director of Engineering and by the Water Department. (F) On-Site Wastewater Facilities. (1) Location. For those areas where the City determines that a connection to the central sewer system is not available, then the City may approve an on-site treatment system that complies with local, county, state and federal regulations. (2) Approval by County. Plans for an on-site wastewater facility, as well as actual installation of such, shall be subject to approval by the applicable county’s health department prior to Preliminary Plat approval. (3) Standards. On-site wastewater facilities shall be provided in accordance with the applicable county’s health department standards and controlling local, state and federal regulations. (4) Soil Considerations. Wastewater disposal facilities requiring soil absorption systems may be prohibited where such systems will not function properly due to high groundwater, flooding, or unsuitable soil characteristics. (5) Water Service & Lot Size. Platted subdivisions served by a public water supply, having lots using individual subsurface methods for wastewater disposal shall have a surface area of at least one acre. Platted subdivisions served by an individual water supply well and an individual wastewater disposal system shall maintain a minimum of a one hundred and fifty foot radius around the well in which no subsurface wastewater system may be constructed, and each lot shall contain not less than one acre. (6) Existing & Future Systems. Existing on-site sewerage facilities shall be upgraded by the owner, at the owner’s expense, if the operation of the facility does not comply with current government regulations or results in objectionable odors, unsanitary conditions or groundwater pollution. All new development and construction, either in the City or its ETJ, shall conform to these requirements.

( Ordinance 6773 adopted 5/19/15 ; Ordinance 7055 , sec. 21, adopted 5/7/19 )

Ask a question about Garland law

Corpus searches the Garland sections it holds and shows the ones that match, with their citations. Free, no sign-in.