Sec. 13-606. - Construction activity prohibitions and requirements.
(a) No person shall discharge stormwater associated with a construction activity without first having obtained a TPDES permit to do so, when applicable. (b) No person shall discharge stormwater associated with a construction activity without first having submitted a fully executed electronic version of a stormwater pollution prevention plan (SWP3) for review and acceptance, a copy of the notice of intent (NOI), when applicable, and a construction site notice (CSN) to the city. (c) All persons must submit a copy of the notice of termination (NOT) to the city at the same time the person submits the NOT to the state regulatory agency (TCEQ). This includes small construction site notices (CSNs), as well as secondary operator signoffs. (d) Any person or operator of construction sites shall use best management practices (BMPs) to control and reduce discharge to the city of sediment, silt, earth, soil and other material associated with clearing, grading, excavation, filling, hauling and other construction activities to the maximum extent practicable. Any person or operator shall install BMPs in compliance with the SWP3 and the approved erosion control plan. Any person or operator must maintain BMPs in effective working order in compliance with city construction detail standards and BMP standards supported by the regional council of governments. (e) Any BMPs capable of installation and/or implementation shall be installed and/or implemented prior to the commencement of construction at the site or in compliance with a schedule for installation and/or implementation in an applicable stormwater pollution prevention plan (SWP3) and approved erosion control plan. Such BMPs must include, but are not limited to, the measures listed in subsections (e)(1) through (7), below: (1) Ensure that existing vegetation is preserved where feasible and disturbed areas of the site are stabilized as soon as practicable where construction activities have temporary or permanently ceased. Stabilization measures may include: Temporary seeding, permanent seeding, mulching, geotextiles, sod stabilization, vegetative buffer strips, protection of trees and other appropriate measures. (2) Prevention of the discharge of building materials, including cement, lime, concrete and mortar, to the MS4 or waters of the United States. (3) Minimization of the tracking of sediments off-site by vehicles, the generation of dust and the escape of other wind-blown waste from the site. (4) Providing housekeeping measures to prevent and contain releases of paints, solvents, fuels, septic waste and other hazardous chemicals and pollutants associated with construction activities, and to assure proper cleanup and disposal of any such releases in compliance with state, federal and local requirements. (5) Implementation of proper waste disposal and waste management techniques, minimizing ground contact with hazardous chemicals and trash. (6) Proper placement and maintenance of vegetation, erosion and sediment control measures and other best management practices to ensure good and effective working condition. (7) Installation of structural BMPs must be completed prior to completion of the construction process to control pollutants in stormwater discharges that will occur after construction operations have been finalized. Structural measures should be placed on upland soils to the degree attainable. Such installed structural measures may include, but are not limited to, the following: Stormwater detention structures (including wet ponds), stormwater retention structures, flow attenuation by use of open vegetative swales and natural depressions, other velocity dissipation devises, infiltration of runoff on-site, and sequential systems which combine several practices. (f) Qualified personnel (provided by the operator of the construction site) shall inspect all disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials and staging of construction that are exposed to precipitation, discharge locations, locations where vehicles enter or exit the construction site, and structural controls for evidence of, or potential for, pollutants entering the MS4. All erosion and sediment control measures and other identified BMPs shall be inspected regularly for proper installation according to the SWP3 and erosion control plan. (g) Inspections must be conducted by qualified personnel at least every seven (7) calendar days and within twenty-four (24) hours of the end of a storm event of 0.5 inches or greater. These inspections are to be conducted as outlined in the SWP3. Inspection reports must be kept with the SWP3. (h) Any owner of a site of construction activity, whether or not he/she is an operator, is jointly and severally responsible for compliance with the requirements in this article. (i) Any contractor or subcontractor on a site of construction activity, who is not an owner or operator, but who is responsible under his/her contract or subcontract for implementing BMP control measures, is jointly and severally responsible for any willful or negligent failure on his/her part to adequately implement that control measure. (j) All persons must comply with the requirements of the TPDES permit or approved erosion control plan issued to such person. (k) Any person or operator engaging in any land disturbing activity, or any construction activities shall prepare an erosion control plan in accordance with the city drainage design manual as currently amended and submit that plan to the city for approval. This shall apply regardless of whether a person or operator is required to obtain a permit from the city or state regulatory agency in order to conduct such land disturbing or construction activity. The person or operator shall also be held liable for violations of this article committed by third parties engaging in activities related to the site. (l) Any person or operator of sites of construction activity, including clearing, grading, excavation, filling and hauling activities, that result in the disturbance of one (1) or more acres of total land area, or that are a part of a larger common plan of development or sale, where one (1) or more acres of total land area are disturbed, or those who are required to obtain a TPDES permit for stormwater discharges associated with construction activities, shall comply with the measures listed in subsections (l)(1) through (8), below: (1) Any person or operator who intends to obtain coverage for stormwater discharges for a large construction project of five (5) or more acres of land under the TPDES general permit for stormwater discharges shall submit a signed copy of the NOI and CSN to the city at least two (2) days prior to the commencement of construction activities. (2) A site-specific SWP3, prepared by the person or operator with appropriate notices issued as required by the state TPDES general permit, shall be kept on the construction site at all times during the construction and updated as needed to address changing conditions. The SWP3 shall include the city-approved erosion control plan as part thereof. (3) The city may require submission of the SWP3 as currently amended at any time during the course of the construction and the person or operator shall submit the SWP3 to the city within twenty-four (24) hours of the request. The city may notify the person or operator at any time the SWP3 does not meet the requirements of the construction general permit for stormwater discharge from the construction site, or any additional requirements imposed by or under this article, which are not being met by the SWP3. The person or operator shall make the required changes to the SWP3 within seven (7) calendar days of notification and submit to the city that the changes have been made and implemented. (4) Operators of a small construction site that are equal to or greater than one (1) acre and less than five (5) acres of land must submit a copy of the CSN to the city prior to beginning earth disturbing activities. (5) The CSNs and NOI certificate, when applicable shall be posted and readily available for viewing by the general public, local, state and federal authorities. (6) Stabilization measures must be initiated as soon as practicable in portions of the construction site where land disturbing activities have "temporarily" ceased. Stabilization measures that provide protective cover must be initiated as soon as practicable where land disturbing activities have "permanently" ceased. These measures must be initiated no more than fourteen (14) days after construction activities have temporarily or permanently ceased (as described in the TPDES permit). (7) Final stabilization must be achieved and all temporary BMPs removed prior to filing the NOT with the state regulatory agency. The city may withhold occupancy or use permit for any premises constructed on site until such time the city has determined the site has met the final stabilization criteria described in this article. (8) Upon final stabilization of a large construction project, the person or operator (or duly authorized representative thereof) shall submit a NOT to the state regulatory agency and submit a copy of the NOT to the city.
(Ord. No. 7973, § 2, 7-7-09; Ord. No. 11065-2021, § 1, 9-21-21)