For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13-607 — Post-construction requirements

Code of Ordinances, City of Grand Prairie, Texas (Supp. No. 117, Update 1: codified through Ordinance No. 1857-2026, adopted April 27, 2026) · Grand Prairie City Code § 13-607

Corpus is an independent public-information project, not the official City of Grand Prairie website. Stable reference: corpuslaw.us/code/b9475a91-06f0-40d6-b549-bbe5baa00595

Sec. 13-607. - Post-construction requirements.

(a) The person or operator must ensure all temporary control measures for erosion control or other BMPs are removed once final stabilization has been achieved. (b) The person or operator must ensure all long-term operation and maintenance of post-construction stormwater runoff control mechanisms, such as detention and retention basins, dry wells and other measures as described in federal regulations.

(Ord. No. 7973, § 2, 7-7-09)

Ask a question about Grand Prairie law

Corpus searches the Grand Prairie sections it holds and shows the ones that match, with their citations. Free, no sign-in.