Sec. 23-50. - Registration and construction permits.

Registration. (a) In order to protect the public health, safety and welfare, all non-franchised users of the right-of-way will register with the City of Grand Prairie. The registration form to be used may be obtained from the public works department. Registration and permits will be issued in the name of the person who will own the facilities. (b) The registration must be renewed annually. If a registration is not renewed within sixty (60) calendar days of the expiration, the facilities of the user will be deemed to have been abandoned and shall become the property of the city. User may challenge the abandonment by filing suit in State District Court in Dallas County within thirty (30) days of the abandonment. (c) Persons that are not certificated telecommunication providers providing access lines, a defined in Chapter 283, Texas Local Government Code, are also required to obtain a franchise or license from the city in accordance with city charter or ordinance in addition to registering under the provisions of this article prior to entering into the rights-of-way. (d) When any information provided for the registration changes, the user will notify the City of Grand Prairie of the change no more than thirty (30) days after the change is made. Registration shall include: (1) The name, address and telephone number(s) of the user of the right-of-way, including the business name, assumed name, or trade name under which the user operates or under which it has operated within the past five (5) years. (2) The name(s), address(es) and telephone number(s) of people who will be contact person(s) for the user; (3) The name(s), address(es) and telephone number(s) of any contractor(s) or subcontractor(s) who will be working in the public right-of-way on behalf of the user, to the extent known. This list may be updated as changes or made or contractors/subcontractors are added; (4) The name(s) and telephone number of an emergency contact who shall be available twenty-four (24) hours a day; (5) For agencies that are certificated telecommunications providers (CTP), a copy of the notice of approval issued by the Public Utility Commission of Texas that grants the CTP a service provider certificate of operating authority (SPCOA) or certificate of convenience and necessity (CCN); and (6) The ordinance number of any franchise or license issued by the City of Grand Prairie that authorizes the user to use the public right-of-way. (7) Proof of insurance and bonds, as follows: a. An applicant must provide proof of liability insurance in the amount of two million dollars ($2,000,000.00) per occurrence and ten million dollars ($10,000,000.00) aggregate, as approved by the director of public works or his/her designee. Such requirements may be waived by the director of public works or his/her designee, if the applicant provides acceptable evidence of self-insurance backed by assets equal to but not less than a net worth in the amount of at least five million dollars ($5,000,000.00) as approved by the director of public works or his/her designee and the director of financial services or his/her designee. b. The insurance must include coverage for personal injury, contractual liability, premises liability, medical damages, underground explosion and collapse hazards. c. Each policy must include a cancellation provision in which the insurance company is required to notify the city in writing not fewer than thirty (30) days before canceling, failing to renew, or reducing policy limits. d. The applicant shall file the required original certificates of insurance prior to any commencement of work. The certificate shall state the policy number; name of the insurance company; name and address of the agent or authorized representative of the insurance company; name, address and telephone number of insured; policy expiration date; and specific coverage amounts. e. The city may require the certificate to be changed to reflect changing liability limits. The permittee shall immediately advise the city attorney of actual or potential litigation that may develop which may affect an existing carrier's obligation to defend and indemnify the city. f. An insurer has no right of recovery against the city. The required insurance policies shall protect the permittee and include the city as an additional insured. The insurance shall be primary coverage for losses covered by the policies. g. The applicant shall pay premiums and assessments. A company that issues an insurance policy has no recourse against the city for payment of a premium or assessment. Insurance policies obtained by the permittee must provide that the issuing company waives all right of recovery by way of subrogation against the city in connection with damage covered by the policy. h. The applicant, contractor, and sub-contractor shall file a surety bond from a surety company authorized to do business in the State of Texas. The bond will be valid each year construction will occur through two (2) years after city's acceptance of the construction and shall be in the amount of the estimated amount of the cost to restore the right-of-way for the work anticipated to be done in that year, in the event the applicant leaves a job site in the right-of-way unfinished, incomplete or unsafe. The minimum of the bond shall be fifty (50) percent of the cost of the project unless otherwise specified by the director or his/her designee. The amount of the bond may increase based upon the size of construction job, methods utilized in constructions, past performance, or other factors as approved by the director or his/her designee. i. The surety bond must protect, indemnify, and hold harmless the city from a claim for damage to a person or to property that may be brought against the city as a result of a permittee's activity conducted under a permit issued under this article. (e) The above financial and insurance requirements are met by applicants with a current franchise or license and applicants governed by Chapter 283 of the Local Government Code if the current franchise, license or statutory indemnity adequately provides for insurance or bond or provides an indemnity in favor of the city. Construction permits. (a) No person shall perform any construction or install any facilities or other encroachment or make a pavement cut or excavate in a public right-of-way without first obtaining a construction permit issued by the director, except as provided herein. The permit will be in the name of the person who will own the facilities to be constructed. The permit must be completed and signed by a representative who will own the facilities to be constructed. (1) Emergency responses related to existing facilities may be undertaken without first obtaining a permit or complying with the time and day limitations otherwise applicable. The director should be notified in writing as promptly as practicable, but in any event not later than within two (2) business days of any construction related to an emergency response; including a reasonably detailed description of the work performed in the right-of-way. An updated map of any facilities that were moved or reconstructed shall be provided as soon as practicable. (2) This permitting requirement does not include repair or maintenance of existing facilities unless such repair or maintenance requires the breaking of pavement or the closure of a nonresidential traffic lane; and does not include the installation of facilities necessary only to initiate service to an individual customer's property. (b) The permit shall state to whom it is issued, location of work, location of facilities including pole locations, if any, estimated dates and times work is to take place and any other conditions set out by the director. (c) Each application for a permit shall be submitted using the required form which may be obtained from the public works department. The person requesting the permit shall provide the director with documentation in the format specified by the public works department describing: (1) The proposed, approximate location and route of all facilities to be constructed or installed and the applicant's plan for right-of-way construction. (2) Engineering plans which will be on a scale not to exceed one (1) inch equals one hundred (100) feet unless otherwise approved by the director. (3) Description of the location of all right-of-way and utility easements which applicant plans to use. (4) Drawings providing sufficient detail to determine if conflicts exist with existing city utilities in relationship to applicant's proposed route, including, but not limited to, full plan and profile when crossing any city utility. (5) Detail description of what applicant proposes to install. (6) Detail description of plans to remove and replace asphalt and/or concrete in streets (include City of Grand Prairie standard construction details.) (7) Drawings of any bores, trenches, handholes, manholes, switch gear, transformers, pedestals, etc. including approximate depth located in public right-of-way. (8) Detail drawings of type and size of manholes and/or handholes which permittee plans to use or access. Placement of underground equipment or structures in existing overcrowded right-of-way or where placement could cause future obstruction of the right-of-way by the city or other users can be designated by the director or his/her designee as long as the service provided by the permittee has been taken into consideration in the placement. (9) List of all equipment (pedestal, transformers, etc.) to be set above ground, including pad sizes if required, to be submitted. (10) Complete legend of drawings submitted by applicant which may be provided by reference to previously submitted documents. (11) Three (3) sets of engineering plans and, if a non-franchised utility, an authorization from owner to perform the designated work must be submitted with permit application. (12) The name, address and phone number of the contractor or subcontractor who will perform the actual construction, including the name and telephone number of an individual with the contractor who will be available at all times during construction. Such information shall be required prior to the commencement of any work. (13) The construction and installation methods to be employed for the protection of existing structures, fixtures, and facilities within or adjacent to the right-of-way, and the estimated dates and times work will occur, all of which (methods, dates, times, etc.) are subject to approval of the director. [(14) Reserved.] (15) Any person with a current, unexpired consent, franchise agreement or other authorization from the city (grant) to use the public rights-of-way that is in effect at the time this article takes effect, shall continue to operate under and comply with that grant until the grant expires or until it is terminated by mutual agreement of the city and the person or as otherwise provided for by law. (16) The permittee may subcontract the work to be performed under a permit provided that the permittee shall be and remain responsible for the performance of the work under the permit and all insurance and financial security as required. Permits are transferable and assignable upon written notice to the director that the transferee or assignee has posted all required security pursuant to this article. Any transferee or assignee shall be bound by all requirements of the permit and this article. (17) Any person found to be conducting excavation activity within the public right-of-way without having first obtained the required permit(s) shall immediately cease all activity (exclusive of actions required to stabilize the area or for the purpose of service restoration or emergency response conditions) and be required to obtain a permit before work may be restarted. (18) The city may institute all appropriate legal action to prohibit any person from knowingly using the public rights-of-way unless the person has complied with the terms of this article. (19) When a lane closure is required, or anytime equipment or supplies will be in a traffic lane, persons shall comply with the Texas Manual on Uniform Traffic Control Devices ("TMUCD"). Written traffic control plans shall be submitted with permit application or submitted from contractor before construction can commence if the person does not intend to comply with the TMUTCD. Notice of intent to close or block traffic lane shall be provided twenty-four (24) hours in advance to the City of Grand Prairie Transportation Department, or as soon a practicable in the case of an emergency. (20) Description of emergency procedures and a list of "on call" contacts. Alternatively, this may be provided with registration provided the registrant will be the responding entity (the owner as opposed to contractor or subcontractors). (d) All construction and installation in the right-of-way shall be in accordance with the permit for the facilities. After permit issuance the director shall be provided access to the construction site and to such further information as the director may reasonably require to ensure compliance with the permit. (e) A copy of the construction permit and approved engineering plans shall be maintained at the construction site and made available for inspection by the director at all times when construction or installation work is occurring. (f) All construction or installation work authorized by permit must be completed in the time specified in the construction permit. If the work cannot be completed in the specified time periods, the permittee may request a reasonable extension from the director. The director shall use best efforts to act on an extension request as soon as practicable. (g) A copy of any permit or approval issued by federal or state authorities for work in federal or state right-of-way located in the City of Grand Prairie, shall be maintained at the construction site and made available for inspection upon request by director when construction or installation work is occurring. (h) The director shall state on the permit the activity for which the permit is issued and any restrictions or requirements that have been placed upon the permit. (i) The director may require any permittee to use installation methods that are (i) in the best interest of the city; (ii) technically, commercially, and economically feasible; and (iii) not in violation of federal or state regulations or industry safety standards. (j) The permittee shall update any new information on permit applications within ten (10) days after any change occurs. (k) A request for a permit must be submitted at least twenty-four (24) hours before the commencement of work proposed in the request, unless waived by the director. (l) Requests for permits will be acted on by the director promptly after receiving all the information specified in this chapter. The director will use best efforts to act on a request for permit as soon as possible. (m) The public works department may require or a permittee may request a preconstruction meeting among the director, the permittee and the construction contractor. (n) A registration or construction permit shall not constitute a franchise, and shall not replace any obligations to either obtain a franchise, if applicable, or to pay a fee pursuant to a franchise obligation. (o) The number of work sites, including contractors and subcontractors, making installations in the right-of-way for any single provider shall not exceed twenty (20) on any one (1) day.

(Ord. No. 7174, § 1, 3-1-05)