For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-51 — Construction standards

Code of Ordinances, City of Grand Prairie, Texas (Supp. No. 117, Update 1: codified through Ordinance No. 1857-2026, adopted April 27, 2026) · Grand Prairie City Code § 23-51

Corpus is an independent public-information project, not the official City of Grand Prairie website. Stable reference: corpuslaw.us/code/ae6358e2-50ab-4095-8254-cf881a8ba00c

Sec. 23-51. - Construction standards.

(a) Director must be notified twenty-four (24) hours in advance that construction is ready to proceed by either the right-of-way user, their contractor or representative. The notice must include the name, address and phone numbers of the contractor who will perform the actual construction, including the name and telephone number of an individual with the contractor who will be available at all times during construction. (b) All construction shall be in conformance with all city codes and applicable local, state and federal laws. (c) For projects lasting more than three (3) days, a three (3) foot by three (3) foot information sign stating the identity of the person doing the work, telephone number and permittee's identity and telephone number shall be placed at the location where construction is to occur twenty-four (24) hours prior to the beginning of work in the right-of-way and shall continue to be posted at the location during the entire time the work is occurring. (d) Erosion control measures, as applicable and advance warning signs, markers, cones and barricades must be in place before work begins. (e) Permittee can be required to show proof of EPA approved plans relating to storm water and erosion when applicable or a letter stating they are not required to obtain such approval. (f) Lane closures on major thoroughfares will be limited to between 8:30 a.m. and 4:00 p.m. unless the director grants prior approval. Barricades and signage shall be installed in accordance with the Texas Manual of Uniform Traffic Control Devices. (g) Without affecting the legal relationship between permittee and its contractors, permittees are responsible for the workmanship and any damages by its contractors or subcontractors. A responsible representative of the permittee will be available to public works at all times during construction. (h) Permittee shall be responsible for storm water management erosion control that complies with city, state and federal guidelines. Requirements may include, but are not be limited to, silt fencing around any excavation that will be left overnight, silt fencing in erosion areas until reasonable vegetation is established, barricade fencing around open holes, and high erosion areas will require wire backed silt fencing. Upon request permittee may be required to furnish documentation submitted or received from federal or state government. (i) Permittee or its contractor or subcontractor will notify the public works department and the affected utility immediately of any damage to other utilities, either city or privately owned. (j) Except in cases of an emergency or service restoration, when a street or sidewalk cut is required, the permittee must obtain prior approval, a minimum of twenty-four (24) hours in advance and all requirements of the public works department shall be followed. Repair of all street and sidewalk removals must be made promptly to avoid safety hazards to vehicle and pedestrian traffic. (k) Newly installed facilities must not interfere with city utilities, in particular gravity dependent facilities. (l) Except for facilities necessary to connect a customer to a distribution point, underground or buried utilities must be installed at a minimum depth of thirty (30) inches or prescribed industry standards, unless a lesser depth is approved by the public works department. (m) All directional boring shall have locator place bore marks and depths while bore is in progress. Locator shall place mark at each stem with paint dot and depth at least every other stem. (n) The working hours for permitted activities in the rights-of-way are 7:00 a.m. to 6:00 p.m., Monday through Friday. Permitted work that needs to be performed after 6:00 p.m. Monday through Friday must be approved in advance. Any permitted work performed outside the above work hours must be approved twenty-four (24) hours in advance by the director unless special circumstances, such as restoring utility service, are involved where it is prudent to continue the work uninterrupted. Directional boring is permitted only Monday through Friday, unless approved twenty-four (24) hours in advance. (o) Contractors working for permittee are responsible for obtaining line locates from all affected utilities at least forty-eight (48) hours prior to any excavation. (p) Contractors will be responsible for physically verifying the location, both horizontal and vertical, of all affected facilities prior to any excavation or boring. (q) On construction projects in which trench excavation will exceed a depth of five (5) feet, the permittee must have detailed plans and specifications for trench safety systems. The trench safety plan shall be designed in conformance with state law and Occupational Safety and Health Administration (OSHA) Standards and Regulations. (r) On open excavations, the permittee shall use flow able backfill or a suitable backfill that meets ninety-five (95) percent proctor compaction requirements in accordance with city standards. (s) Traffic barriers shall be utilized on all concrete paving cuts until required curing is accomplished. (t) Placement of all manholes and/or handholes must be approved in advance by public works department. (u) Locate flags shall not be removed from a location while facilities are being constructed. (v) If necessary, the director or his/her designee may request staking of right-of-way prior to construction to assure placement of facilities in proper location.

(Ord. No. 7174, § 1, 3-1-05)

Ask a question about Grand Prairie law

Corpus searches the Grand Prairie sections it holds and shows the ones that match, with their citations. Free, no sign-in.