For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 105-43 — Permit procedures

Code of Ordinances, City of Harlingen, Texas · Harlingen Code of Ordinances § 105-43

Corpus is an independent public-information project, not the official City of Harlingen website. Stable reference: corpuslaw.us/code/a3891515-f88a-48ab-ba94-8f900a6f5997

§ 105-43: Permit procedures.

(a) Application for a floodplain development permit shall be presented to and must be approved by the Floodplain Administrator on forms furnished by the Floodplain Administrator and may include, but not be limited to, plans in duplicate drawn to scale showing the location, dimensions, and elevation of proposed landscape alterations, existing and proposed structures, including the placement of manufactured homes, and the location of the foregoing in relation to areas of special flood hazard. Application for a floodplain development permit for a proposed subdivision may be presented prior to or in conjunction with other data required for the platting process. For platting purposes, a floodplain development permit shall serve only as an approval of the floodplain ordinance requirements. No cut or fill, building, or other site alterations shall proceed until the permit is approved. Additionally, the following information shall accompany the permit application: (1) An elevation certificate for buildings on property located in or abutting the floodplain; (2) Elevation in relation to mean sea level to which any non-residential structure shall be floodproofed; (3) A certificate from a registered professional engineer or architect that the nonresidential floodproofed structure shall meet the floodproofing criteria of section 105-57(2); (4) Description of the extent to which any watercourse or natural drainage will be altered or relocated as a result of proposed development; (5) Maintain a record of all such information in accordance with section 105-42(1); (6) An existing structure may be improved (remodeled) without conforming to requirements of this chapter when the improvement does not constitute a substantial improvement. In the event that the work is considered a substantial improvement, then the structure must be brought into compliance with this chapter. (7) If required by section 105-45, a certification of no adverse impact. A registered professional engineer shall certify that the proposed development will not create adverse impacts on other properties as measured by: a. No increase in flood stage; b. No increase in flood velocity; c. No increase in flows; d. No increased potential for erosion and sedimentation; e. Any other impact deemed important or as specified by the city. The certification shall employ accepted engineering standards for hydraulic and hydrological analysis and all data shall be provided in hard copy and digitally for review and corroboration by the Floodplain Administrator, City Engineer, or any governmental review agency acceptable to the city. (b) Approval or denial of a floodplain development permit by the Floodplain Administrator shall be based on all of the provisions of this chapter and the following relevant factors: (1) The danger or threat to life and property due to flooding or erosion damage; (2) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner; (3) The danger that materials may be swept onto other lands to the injury of others; (4) The compatibility of the proposed use with existing and anticipated development; (5) The safety of access to the property in times of flood for ordinary and emergency vehicles; (6) The costs of providing governmental services during and after flood conditions including maintenance and repair of streets and bridges, and public utilities and facilities such as sewer, gas, electrical and water systems; (7) The expected heights, velocity, duration, rate of rise and sediment transport of the floodwaters and the effects of wave action, if applicable, expected at the site; (8) The necessity to the facility of a waterfront location, where applicable: (9) The availability of alternative locations, not subject to flooding or erosion damage, for the proposed use. (10) The relationship of the proposed use to the comprehensive plan for that area. (11) Technical review of a permit application for sound engineering practices may be performed by either the City Engineer or by an appointed Professional Engineer. (c) If a development permit application is disapproved, the Floodplain Administrator shall notify the applicant in writing of the section and specific requirement of this chapter with which the proposed development does not comply and the nature of such noncompliance.

( Ordinance 2026-38 adopted 8/19/2026 )

Ask a question about Harlingen law

Corpus searches the Harlingen sections it holds and shows the ones that match, with their citations. Free, no sign-in.