For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 41-37 — Devices and testing required of industry

Code of Civil and Criminal Ordinances of the City of Irving, Texas (Irving Code of Civil and Criminal Ordinances, Charter and Land Development Code current through legislation adopted September 24, 2026 (eCode360 publication IR6873, scraped 2026-11-17)) · Irving Code of Civil and Criminal Ordinances § 41-37

Corpus is an independent public-information project, not the official City of Irving website. Stable reference: corpuslaw.us/code/3cd33cd3-7a70-478b-88fc-fffbf454457a

§ 41-37: Devices and testing required of industry.

(a) Grease and oil traps. The industrial user shall provide for the proper handling of liquid wastes containing grease in excessive amounts, sand, or other heavy solids. The user shall provide traps of a type and capacity approved by the director and shall locate them as to be readily and easily accessible for cleaning and inspection. (b) Process flow water meters. The industrial user shall install and maintain in working order, a separate isolated meter for the purpose of monitoring process water used in all its industrial or manufacturing processes. (c) Backflow preventer. The industrial user shall install and maintain in working order a chemical resistant industrial grade backflow prevention assembly on the process water supply line so as to prevent possible backsiphoning of industrial process waters or chemicals back into the potable water supply. The user or owner shall make this assembly readily accessible for testing by qualified personnel. A six-inch (6") air-gap between potable water lines and any process waters may be substituted for a backflow assembly preventer. (d) Control manhole. The industrial user or owner of any property serviced by a sewer carrying industrial wastes shall install a suitable control manhole, or sampling port, together with such necessary meters and other appurtenances in the building sewer to facilitate observation, sampling, and measurement of the wastes. The industrial user shall locate the manhole so that it is safely accessible without restriction and shall construct it in compliance with plans approved by the director. The owner or user shall install the manhole at his or her expense and maintain it so that it is safe and accessible at all times. (e) Test of strength of industrial wastes. The city may determine wastewater flow and concentration of constituents in whatever manner it designates. The time of selection as well as the number and type of the sample(s) shall be at the sole discretion of the city. All measurements, tests, and analyses of the characteristics of waters and wastes to which reference is made in this chapter may be determined in compliance with section 41-38(j) or methods approved by EPA or other agencies that have EPA approval authority for establishing methods for testing and analysis. These measurements, tests, and analyses may be determined at the control manhole or sample port provided, or upon suitable samples taken at the control manhole or at any other manhole considered by the director as appropriately isolated. Sampling may be carried out by methods specified in section 41-38(j) to reflect the effect of constituents upon the sewage works of the city and to determine the existence of hazards to health, life, limb, and property. The director, guided by the particular analyses involved, may determine whether a twenty-four-hour composite sample from all outfalls of an industrial user is appropriate or whether a grab sample or samples should be taken. If any industrial user so wishes, flow determinations may be made by a wastewater meter installed and maintained at the sampling station at the user's expense. The director may include calibration requirements in the user's permit. (f) Cost of tests. Each industry or wastewater user that does not discharge wastewater in excess of two hundred fifty (250) mg/L BOD or suspended solids shall compensate the city for the cost of sampling, laboratory analysis, and administrative cost required for monitoring discharges to comply with city, state or federal effluent standards. For industries and users that discharge BOD and suspended solids in excess of two hundred fifty (250) mg/L, the above cost will be included in their surcharge billing. (g) Isolated water and sewer service. An industrial user shall provide an isolated water service controlled by a city-owned and maintained water meter. In addition, the industrial user shall provide an isolated sewer service so that its industrial wastewaters can be monitored. The industrial user shall install a city-approved control manhole, or sample port, on the isolated sewer service that will be installed at the end of any process wastewater or domestic discharges into the sewer service. The industrial user shall pay for installation, maintenance and operation of the control manhole, or sample port, unless that fee is waived by the director.

( Ordinance 2024-11036 adopted 12/12/2024 )

Ask a question about Irving law

Corpus searches the Irving sections it holds and shows the ones that match, with their citations. Free, no sign-in.