For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 41-39 — Administration and enforcement

Code of Civil and Criminal Ordinances of the City of Irving, Texas (Irving Code of Civil and Criminal Ordinances, Charter and Land Development Code current through legislation adopted September 24, 2026 (eCode360 publication IR6873, scraped 2026-11-17)) · Irving Code of Civil and Criminal Ordinances § 41-39

Corpus is an independent public-information project, not the official City of Irving website. Stable reference: corpuslaw.us/code/0c817e86-f501-461c-b8b2-bb232c86346a

§ 41-39: Administration and enforcement.

(a) Right of entry: inspection and sampling. (1) The director and/or the control authority, TCEQ, or EPA or their designated representative(s) shall have the right to enter the premises of any user to determine whether the user is complying with all requirements and any wastewater discharge permit or order issued hereunder. Users shall allow the inspecting or sampling person(s) ready access to all parts of the premises for the purposes of inspection, sampling, records examination and copying, and the performance of any additional duties. (2) Where a user has security measures in force which require proper identification and clearance before entry into its premises, the user shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, city, control authority, TCEQ, or EPA personnel will be permitted to enter without delay for the purposes of performing specific responsibilities. (3) The director and/or control authority shall have the right to set up on the user's property, or require installation of such devices as are necessary, to conduct sampling and metering of the user's operations. All sampling and analysis performed by the city and/or control authority to monitor compliance shall be at the expense of the industrial user. (4) The director may require the user, at user's sole expense, to install monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the user at its own expense. All devices used to measure wastewater flow and quality shall be calibrated, at a minimum, annually to ensure their accuracy. (5) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the user at the written or verbal request of the director and shall not be replaced. The costs of clearing the access shall be borne by the user. (6) Unreasonable delays in allowing an inspecting or sampling person access to the user's premises shall be a violation. (7) In accordance with 40 CFR § 403, the city shall inspect and monitor each significant industrial user a minimum of once per year. If the city elects to perform compliance monitoring for the significant industrial user then the city will monitor the industry a minimum of semiannually. (8) The city shall inspect each NSCIU a minimum of once per year. If the city elects to perform compliance monitoring for the NSCIU, then the city will monitor the industry a minimum of one time each permit cycle. (b) Search warrants. If the director and/or control authority has been refused or denied access to a building, structure, or property, or any part thereof, and is able to demonstrate probable cause to believe that there may be a violation, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program of the city designed to verify compliance with this chapter or any permit or order issued hereunder, or to protect the overall public health, safety, and welfare of the community, then the director and/or control authority may seek issuance of a search warrant from an appropriate court or judicial officer. (c) Confidential information. Information and data on a user obtained from reports, surveys, wastewater discharge permit applications, wastewater discharge permits, and monitoring programs, and from inspection and sampling activities, shall be available to the public without restriction, unless the user specifically requests, and is able to demonstrate to the satisfaction of the city or control authority, that the release of that information would divulge information, processes, or methods of production entitled to protection as trade secrets under applicable state law. Any such request must be asserted at the time of submission of the information or data. When requested and demonstrated by the user furnishing a report that the information should be held confidential, the portions of a report which might disclose trade secrets or secret processes shall only be available pursuant to the requirements of the Texas Public Information Act, but shall be made available immediately upon request to governmental agencies for uses related to the NPDES or TPDES program or pretreatment program, and in enforcement proceedings involving the person furnishing the report. Wastewater constituents and characteristics, and other effluent data as defined by 40 CFR § 2.302, will not be recognized as confidential information and will be available to the public without restriction. (d) Publication of users in significant noncompliance. (1) The director shall publish annually in a newspaper of general circulation that provides meaningful public notice within the jurisdictions served by the POTW, a list of the users which, at any time during the previous twelve (12) months, were in significant noncompliance with applicable pretreatment standards and requirements. (2) The term significant noncompliance shall be applicable to all significant industrial users (or any other industrial user that violates subsections (3), (4), or (8) of this subsection (d) and shall mean: a. Chronic violations of wastewater discharge limits, defined here as those in which sixty-six percent (66%) or more of all the measurements taken for the same pollutant parameter taken during a six (6) month period exceed (by any magnitude) a numeric pretreatment standard or requirement, including instantaneous limits as defined in sections 41-29(a) — 41-29(f); b. Technical review criteria (TRC) violations, defined here as those in which thirty-three percent (33%) or more of wastewater measurements taken for each pollutant parameter during a six (6) month period equals or exceeds the product of the numeric pretreatment standard or requirement including instantaneous limits, as defined by sections 41-29(a) — 41-29(f) multiplied by the applicable criteria (1.4 for BOD, TSS, fats, oils and grease, and 1.2 for all other pollutants except pH); c. Any other violation of a pretreatment standard or requirement as defined by sections 41-29(a) — 41-29(f) (daily maximum, long-term average, instantaneous limit, or narrative standard) that the director determines has caused, alone or in combination with other discharges, interference or pass through, including endangering the health of POTW personnel or the general public; d. Any discharge of a pollutant that has caused imminent endangerment to the public or to the environment, or has resulted in the director's exercise of its emergency authority to halt or prevent such a discharge; e. Failure to meet, within ninety (90) days of the scheduled date, a compliance schedule milestone contained in an individual wastewater discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance; f. Failure to provide within forty-five (45) days after the due date, any required reports, including baseline monitoring reports, reports on compliance with categorical pretreatment standard deadlines, periodic self-monitoring reports, and reports on compliance with compliance schedules; g. Failure to accurately report noncompliance; or h. Any other violation(s), which may include a violation of best management practices, which the director determines will adversely affect the operation or implementation of the local pretreatment program. (e) Notification of violation; user plan of action. When the director finds that a user has violated, or continues to violate, any provision, a wastewater discharge permit or order issued hereunder, or any other pretreatment standard or requirement, the director may serve upon that user a written notice of violation. Within the time frame specified in this notice, an explanation of the violation and a plan for the satisfactory correction and prevention thereof, to include specific required actions, shall be submitted by the user to the director. Submission of this plan in no way relieves the user of liability for any violations occurring before or after receipt of the notice of violation. Nothing in this section shall limit the authority of the director to take any action, including emergency actions or any other enforcement action, without first issuing a notice of violation. (f) Consent order. The director may enter into a consent order, assurance of compliance, or a similar document establishing an agreement with any user responsible for noncompliance. Such documents shall include specific action to be taken by the user to correct the noncompliance within a time period specified by the document. Such documents shall have the same force and effect as the administrative orders issued pursuant to subsections (g) and (i) and shall be judicially enforceable. Issuance of a consent order shall not be a bar against, or a prerequisite for, taking any other action against the user. (g) Show cause hearing. The director may order a user which has violated or continues to violate any provision, a wastewater discharge permit or order issued hereunder, or any other pretreatment standard or requirement, to appear before the director and show cause why the proposed enforcement action should not be taken. Notice shall be served on the user specifying the time and place for the meeting, the proposed enforcement action, the reasons for such action, and a request that the user show cause why the proposed enforcement action should not be taken. The notice of the meeting shall be served personally or by registered or certified mail (return receipt requested) at least ten (10) days prior to the hearing. Such notice may be served on any authorized representative of the user. A show cause hearing shall not be a bar against, or prerequisite for, taking any other action against the user. (h) Compliance orders. When the director finds that a user has violated or continues to violate any provision, a wastewater discharge permit or order issued hereunder, or any other pretreatment standard or requirement, the director may issue an order to the user responsible for the discharge directing that the user come into compliance within a specified time. If the user does not come into compliance within the time provided, sewer service may be discontinued unless adequate treatment facilities, devices, or other related appurtenances are installed and properly operated. Compliance orders also may contain other requirements to address the noncompliance, including additional self-monitoring and management practices designed to minimize the amount of pollutants discharged to the sewer. A compliance order may not extend the deadline for compliance established for a pretreatment standard or requirement; nor does a compliance order relieve the user of liability for any violation, including any continuing violation. Issuance of a compliance order shall not be a bar against, or a prerequisite for, taking any other action against the user. (i) Cease-and-desist orders. (1) When the director finds that a user has violated or continues to violate any provision, a wastewater discharge permit or order issued hereunder, or any other pretreatment standard or requirement, or that the user's past violations are likely to recur, the director may issue an order to the user directing it to cease-and-desist all such violations and directing the user to: a. Immediately comply with all requirements; and b. Take such appropriate remedial or preventive action as may be needed to properly address a continuing or threatened violation, including halting operations and/or terminating the discharge. (2) Issuance of a cease-and-desist order shall not be a bar against, or a prerequisite for, taking any other action against the user. (j) Emergency suspension of discharge. (1) The director may immediately suspend a user's discharge, after informal notice to the user, whenever such suspension is necessary to stop an actual or threatened discharge which reasonably appears to present or cause an imminent or substantial endangerment to the health or welfare of persons. The director may also immediately suspend a user's discharge, after notice and opportunity to respond, that threatens to interfere with the operation of the POTW, or which presents, or may present, an endangerment to the environment. a. Any user notified of a suspension of its discharge shall immediately stop or eliminate its contribution. In the event of a user's failure to immediately comply voluntarily with the suspension order, the director may take such steps as deemed necessary, including immediate severance of the sewer connection, to prevent or minimize damage to the POTW, its receiving stream, or endangerment to any individuals. The director may allow the user to recommence its discharge when the user has demonstrated to the satisfaction of the director that the period of endangerment has passed, unless the termination proceedings in subsection (k) are initiated against the user. b. A user that is responsible, in whole or in part, for any discharge presenting imminent endangerment shall submit a detailed written statement, describing the causes of the harmful contribution and the measures taken to prevent any future occurrence, to the director prior to the date of any show cause or termination hearing under subsections (f) or (k). (2) Nothing in this section shall be interpreted as requiring a hearing prior to any emergency suspension under this section. (k) Termination of discharge. (1) In addition to the provisions in section 41-33(b), any user who violates the following conditions is subject to discharge termination: a. Violation of wastewater discharge permit conditions; b. Failure to accurately report the wastewater constituents and characteristics of its discharge; c. Failure to report significant changes in operations or wastewater volume, constituents, and characteristics prior to discharge; d. Refusal of reasonable access to the user's premises for the purpose of inspection, monitoring, or sampling; or e. Violation of the pretreatment standards in sections 41-29(a) — 41-29(f). (2) Such users will be notified of the proposed termination of its discharge and be offered an opportunity to show cause under subsection (g) why the proposed action should not be taken. Exercise of this option by the director shall not be a bar to, or a prerequisite for, taking any other action against the user. (l) Injunctive relief. When the director finds that a user has violated or continues to violate any provision, a wastewater discharge permit, or order issued hereunder, or any other pretreatment standard or requirement, the director may petition a court of competent jurisdiction through the city attorney for the issuance of a temporary restraining order and temporary or permanent injunction, as appropriate, which restrains or compels the specific performance of the wastewater discharge permit, order, or other requirement imposed by this chapter on activities of the user. The director may also seek such other action as is appropriate for legal and/or equitable relief, including a requirement for the user to conduct environmental remediation. A petition for injunctive relief shall not be a bar against, or a prerequisite for, taking any other action against a user. (m) Remedies not exclusive. The remedies provided for in this chapter are not exclusive. The director may take any, all, or any combination of these actions against a noncompliant user. Enforcement of pretreatment violations will generally be in accordance with the city's enforcement response plan. However, the director may take other action against any user when the circumstances warrant. Further, the director is empowered to take more than one enforcement action against any noncompliant user. (n) Applicability of more stringent regulations. (1) More stringent discharge limits. If national pretreatment standards, categorical or otherwise, more stringent than the discharge limits prescribed in this article are promulgated by the United States Environmental Protection Agency for certain industries, the more stringent national pretreatment standards will apply to the affected industrial user. A violation of the more stringent national pretreatment standards will also be considered a violation. (2) Applicability of more stringent discharge limits. An industrial user within the city who discharges industrial waste ultimately received and treated by another governmental entity pursuant to a wholesale wastewater contract or a reciprocal agreement with the city is subject to the following additional rules: a. If the governmental entity has more stringent discharge limits than those prescribed by this chapter, or by a discharge permit issued hereunder, because the United States Environmental Protection Agency requires the more stringent discharge limits as part of the governmental entity's wastewater pretreatment program, the more stringent discharge limits shall prevail. b. The director is authorized to issue a discharge permit to an industrial user affected by subsection (1), to ensure notice of and compliance with the more stringent discharge limits. If the industrial user already has a discharge permit, the director may amend the permit to apply and enforce the more stringent discharge limits. An industrial user shall submit to the director an expected compliance date and an installation schedule if the more stringent discharge limits necessitate technological or mechanical adjustments to discharge facilities or plant processes. c. If the director chooses not to issue or amend a permit under subsection (2), the director shall notify the affected industrial user in writing of the more stringent discharge limits and their effective date. Regardless of whether or not a permit is issued or amended, an industrial user shall be given a reasonable opportunity to comply with the more stringent discharge limits. d. The more stringent discharge limits cease to apply upon termination of the city's wholesale wastewater contract or reciprocal agreement with the governmental entity, or upon modification or elimination of the limits by the government entity or the United States Environmental Protection Agency. The director shall take the appropriate action to notify the affected industrial user of an occurrence under this subsection. (3) Variances in compliance dates. The director may grant a variance in compliance dates to an industry when, in the director's opinion, such action is necessary to achieve pretreatment or corrective measures. In no case shall the director grant a variance in compliance dates to an industry affected by national categorical pretreatment standards beyond the compliance dates established by the United States Environmental Protection Agency. (4) Authority to regulate. The director may establish regulations, not in conflict with this chapter or other laws, to control the disposal and discharge of industrial waste into the wastewater system and to ensure compliance with the city's pretreatment enforcement program with all applicable pretreatment regulations promulgated by the United States Environmental Protection Agency. The regulations established shall, where applicable, be made part of any discharge permit issued to an industrial user by the director. (o) Affirmative defenses to discharge violations. (1) Acts of God. a. An event that would otherwise be a violation that is caused solely by an act of God, war, strike, riot, or other catastrophe is not a violation. b. In an enforcement proceeding, the user seeking to establish the occurrence of an act of God, war, strike, riot, or other catastrophe shall have the burden of proof. c. In the event that an act of God, war, strike, riot, or other catastrophe has been established, the user shall control production of all discharges to the extent possible until such time as the reduction, loss, or failure of its treatment facility is restored or an alternative method of treatment is provided. (2) Bypass. a. For the purpose of this section: Bypass means the intentional diversion of wastestreams from any portion of a user's treatment facility. Severe property damage means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. b. A user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provision of subsections c and d. c. If a user knows in advance of the need for a bypass, it shall submit prior notice to the director at least ten (10) days before the date of the bypass, if possible. d. A user shall submit oral notice to the director of an unanticipated bypass that exceeds applicable pretreatment standards within twenty-four (24) hours from the time it becomes aware of the bypass. A written submission shall also be provided within five (5) days of the time the user becomes aware of the bypass. The written submission shall contain a description of the bypass and its cause; the duration of the bypass, including exact dates and times, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent recurrence of the bypass. The director may waive the written report on a case-by-case basis if the oral report has been received within twenty-four (24) hours. e. Bypass is prohibited, and the director may take an enforcement action against a user for a bypass, unless: 1. The bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; 2. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and 3. The user submitted notices as required under subsection c. f. The director may approve an anticipated bypass, after considering its adverse effects, if the director determines that it will meet the three conditions listed in subsection (d)(1) [Subsection (2)(e)]. (p) Penalties. (1) Civil penalties. a. A user who has violated, or continues to violate, any provision, a wastewater discharge permit, or order issued hereunder, or any other pretreatment standard or requirement, shall be liable to the city for a maximum civil penalty of one thousand dollars ($1,000) per violation, per day. In the case of a monthly or other long-term average discharge limit, penalties shall accrue for each day during the period of the violation. b. The director may recover reasonable attorneys' fees, court costs, and other expenses associated with enforcement activities, including sampling and monitoring expenses, and the cost of any actual damages incurred by the city. c. In determining the amount of civil liability, the court shall take into account all relevant circumstances, including, but not limited to, the extent of harm caused by the violation, the magnitude and duration of the violation, any economic benefit gained through the user's violation, corrective actions by the user, the compliance history of the user, and any other factor as justice requires. d. Filing a suit for civil penalties shall not be a bar against, or a prerequisite for, taking any other action against a user. (2) Criminal prosecution. a. A user who violates intentionally, knowingly, recklessly, or negligently any provision, a wastewater discharge permit, or order issued hereunder, or any other pretreatment standard or requirement shall, upon conviction, be guilty of a misdemeanor, punishable by a fine of not more than two thousand dollars ($2,000) per violation, per day. b. A user who intentionally, knowingly, recklessly, or negligently introduces any substance into the POTW which causes personal injury or property damage shall, upon conviction, be guilty of a misdemeanor and be subject to the same penalties described in section 41-71. This penalty shall be in addition to any other cause of action for personal injury or property damage available under state law. c. A user who makes any false statements, representations, or certifications in any application, record, report, plan, or other documentation filed, or required to be maintained, pursuant to this chapter, wastewater discharge permit, or order issued hereunder, or who falsifies, tampers with, or knowingly renders inaccurate any monitoring device or method required under this chapter shall, upon conviction, be subject to the same penalties described in section 41-71. d. A person is criminally responsible for a violation if that person intentionally, knowingly, recklessly, or negligently: 1. Commits or assists in the commission of a violation, or causes or permits another person to commit a violation; or 2. Owns or manages the property or facilities determined to be the cause of the illegal discharge under sections 41-29(a), 41-29(b), 41-29(c), 41-29(l), or 41-30(b).

( Ordinance 2024-11036 adopted 12/12/2024 )

Ask a question about Irving law

Corpus searches the Irving sections it holds and shows the ones that match, with their citations. Free, no sign-in.