Chapter 3 — DESIGN STANDARDS AND REQUIREMENTS
Code of Ordinances of the City of Killeen, Texas (Supp. No. 38, Update 2: codified through Ordinance of 26-029, enacted August 4, 2026), Killeen, TX · 29 sections. Independent public-information project, not the official City of Killeen website.
- § 17-66 — Conformance
- § 17-67 — Plans subject to subdivision ordinance
- § 17-68 — Site size
- § 17-69 — Density
- § 17-70 — Fencing
- § 17-71 — Spacing and setbacks
- § 17-72 — Tenant storage
- § 17-73 — Patio roofs and carports
- § 17-74 — Plumbing, drainage systems—FHA specifications
- § 17-75 — Same—adherence to code
- § 17-76 — Same—prohibited installation
- § 17-77 — Water distribution system
- § 17-78 — Hose connections
- § 17-79 — Individual water connections
- § 17-80 — Sewer system and connections; design and construction
- § 17-81 — Individual sewer connections
- § 17-82 — Inspection; testing
- § 17-83 — Responsibility
- § 17-84 — Fuel
- § 17-85 — Natural gas
- § 17-86 — Electrical distribution system
- § 17-87 — Lighting
- § 17-88 — Walks
- § 17-89 — Street system
- § 17-90 — Driveway or accessway
- § 17-91 — Parking
- § 17-92 — Sanitation facilities
- § 17-93 — Garbage disposal facilities
- § 17-94 — Fire protection
