§ 26-181 — Study scope
Code of Ordinances of the City of Killeen, Texas (Supp. No. 38, Update 2: codified through Ordinance of 26-029, enacted August 4, 2026) · Killeen City Code § 26-181
Corpus is an independent public-information project, not the official City of Killeen website. Stable reference: corpuslaw.us/code/e62eb490-4ff2-4ade-9689-d61c215a61c2
Sec. 26-181. - Study scope.
(a) When a TIA is required, the scope of the analysis shall be determined during a scoping meeting with the city engineer. The city engineer may involve representatives of or request assessments from other agencies and departments. The elements to be determined during the scoping session shall include the following: (1) The points of access and key streets and intersections that may be affected by development of the subject tract constitute the impact area. Traffic recorder and turning movement assessment locations shall be determined. (2) The TIA shall include traffic being generated by adjacent developments at a maximum of one-half-mile radius of the development boundaries that will be utilizing any street infrastructure or if the adjacent development is in the jurisdiction of another city or ETJ, the applicant must include that area in its TIA scope. Adjacent developments shall include developments that have been approved, conditionally approved, or approved with a preliminary plat. For substantial developments that generate traffic in excess of five hundred (500) peak hour trips and schools that generate over three hundred (300) peak hour trips shall have the radius increased to one (1) mile. (3) Periods of analysis shall include average daily traffic, peak a.m. and p.m., or weekend peak hour, if found to be higher than the weekday. (4) Scenarios for analysis include existing conditions, opening year conditions with and without development, ten (10) years after opening with and without development, and five (5) years after opening with and without development if the study includes a signal warrant study. (5) Process for determining trip generation and distribution, including trip generation category, diversion assumptions, distribution assumptions, and capacity analysis. (6) The rate of growth assumed in background traffic assumptions shall follow industry standards per the Texas Department of Transportation and the Texas Transportation Institute when local values are not available. (b) If a TIA is required, it shall be based on the ITE Manual, prepared in accordance with standard transportation engineering practices for purposes of determining the adequacy of the road network to serve the proposed development, and whether off-site road dedication and improvements should be made to mitigate the effects of the development proposed in the application. (c) An initial TIA worksheet or abbreviated report shall be approved by the City Engineer prior to submittal of a preliminary plat and all zoning applications. An updated and/or final TIA shall be approved prior to the approval of all final plat applications and shall be generally consistent with the initial TIA. The final TIA shall be updated whenever a subdivision plat or site plan is modified to authorize more intensive development that generates increased traffic beyond what was stated in the initial report. In the event the traffic condition surrounding a development has changed beyond the TIA that shows a decrease in traffic, it shall be the discretion of the applicant to submit a revision to the TIA.
(Ord. No. 22-019, § I, 4-12-22)
Ask a question about Killeen law
Corpus searches the Killeen sections it holds and shows the ones that match, with their citations. Free, no sign-in.
