§ 26-182 — Traffic impact analysis elements

Code of Ordinances of the City of Killeen, Texas (Supp. No. 38, Update 2: codified through Ordinance of 26-029, enacted August 4, 2026) · Killeen City Code § 26-182

Corpus is an independent public-information project, not the official City of Killeen website. Stable reference: corpuslaw.us/code/4fb2a20e-b409-436d-b442-e79dca87c423

Sec. 26-182. - Traffic impact analysis elements.

When a TIA is required, the following items shall be included in the submitted report: (a) An existing condition analysis of the transportation system, which includes the following: (1) The street system shall be described including geometric features lane usage traffic control, signage, sight distances and adjacent uses and curb cuts. (2) Existing traffic volumes shall be provided for the impact area including both ADT (average daily traffic) and "design" peak hour volumes when available. ADT shall be derived from the latest available counts taken by the city, and/or the Texas Department of Transportation. If unavailable, then field counts can be used to determine the ADT. Peak hour volumes shall be obtained from field counts. Data shall be adjusted for daily and seasonal variations. Turning movement counts for the peak hour shall be provided for critical intersections. Peak hour periods shall be as determined at the scoping meeting. (3) Existing capacity analysis of signalized and un-signalized intersections. The analysis shall state the existing level of service (LOS) of all intersections in the study. (4) Other items may be required at the discretion of the city engineer depending upon the type and scale of the project. These may include, but are not limited to, queue length analysis, pedestrian counts, accident data, traffic speeds (both 50 th and 85 th percentile), and stopping sight distances. Items that will be required shall be discussed and agreed upon in the scoping meeting. (b) A calculated future condition of the transportation system without development, which includes the following: (1) Capacity analysis to be provided for opening year plus ten (10) years for key intersections (and roadway segments where appropriate) without the development but including any planned developments. Intersection warrant studies shall provide for opening year plus five (5) years in conformance of TXDOT requirements. The analysis shall be based upon the edition of the Highway Capacity Manual approved by the city engineer, or other methodologies approved in advance by the city engineer. The analysis shall state the future LOS for all intersections within the study. In the event the city has adopted a transportation demand model, the analysis shall be consistent with the methodologies and processes of said model. The city shall provide necessary model information at the scoping meeting for use by the developer to create a TIA. (c) A calculated condition of the future transportation system with development at the estimated time of opening year which includes the following: (1) Projections of the daily and peak hour traffic generation of the project shall be made using the ITE Trip Generation Manual unless the city engineer determines that locally derived data will provide more accurate forecasts. Data from similar facilities may be used where the information is not available from ITE. (2) The projected trips shall be distributed onto the road network as agreed in the scoping meeting. (3) Capacity analysis for opening year and plus ten (10) years for key intersections (and roadway segments where appropriate) with the development and including any planned developments. Intersection warrant studies shall provide for opening year and five (5) years in conformance with TXDOT requirements. The analysis shall state the future LOS for all analysis intersections within the study. In the event the city has adopted a transportation demand model, the analysis shall be consistent with the methodologies and process of said model. The city shall provide necessary model information at the scoping meeting for use by the developer to create a TIA. (4) Special analysis as may be required to determine warrants for signalization, minimum safe sight distances, gap analysis, turning radius requirements, queue length analysis, turning lane length analysis, curb cut locations or similar requirements. (d) Mitigation plan of the transportation system as a result of the study. (1) The TIA shall identify any transportation improvements needed to maintain a LOS D or better as a result of the proposed development. Where the existing LOS is below D, the TIA shall clearly state needed improvements needed to match the existing conditions, and also obtain a LOS D that includes the increase traffic from the development. Where the analysis indicates that the project will create deficiencies in the impact area as a result of the development, improvements shall be recommended and include projected cost estimates. Cost estimates shall include right-of-way acquisition, utility relocation, and transportation facility design and construction. All cost estimates shall be approved by the city engineer or the city manager or his/her designee prior to acceptance of the TIA. The design of improvements shall be in accordance with the standard details and specifications of the City of Killeen and, where appropriate, the Texas Department of Transportation. The mitigation plan shall also include any dedications necessary to comply with the city minimum road standards. Where the final approval authority for any procedure determines that a mitigation plan is not adequate to address the traffic impacts of the project, it may serve as a basis for denial of the permit or subdivision plat.

(Ord. No. 22-019, § I, 4-12-22)

Ask a question about Killeen law

Corpus searches the Killeen sections it holds and shows the ones that match, with their citations. Free, no sign-in.