§ 26-81 — Construction of infrastructure
Code of Ordinances of the City of Killeen, Texas (Supp. No. 38, Update 2: codified through Ordinance of 26-029, enacted August 4, 2026) · Killeen City Code § 26-81
Corpus is an independent public-information project, not the official City of Killeen website. Stable reference: corpuslaw.us/code/f466d4fb-51bf-4d43-a944-866422406e95
Sec. 26-81. - Construction of infrastructure.
(a) Construction plans for all proposed infrastructure to be constructed for the property may be submitted only after the preliminary plat has been approved by the planning and zoning commission. Construction plan applications shall be deemed filed when they are determined by staff to be administratively complete. Administratively complete shall mean that all required application materials have been submitted. Construction plans submitted shall substantially conform to the approved preliminary plat. For purposes of this section, substantial conformance shall mean eighty (80) percent or more. (b) The engineering division shall review the submitted plans for compliance with the infrastructure design and development standards manual, the drainage design manual, the current Pavement Design Manual, and other applicable construction standards adopted by the city and approve, approve with conditions, or disapprove the construction plans within thirty (30) days after the plans are filed. Upon approval with conditions or disapproval of construction plans, the applicant shall be provided with a written statement of the conditions for the conditional approval, or reasons for disapproval, that clearly articulates each specific condition for the conditional approval or reason for disapproval. Each condition or reason specified in the written statement must be directly related to the requirements of V.T.C.A., Local Government Code, ch. 212, subch. A, and include a citation to statute or city ordinance that is the basis for the conditional approval or disapproval. After the conditional approval or disapproval of construction plans, the applicant may submit to the executive director, or designee, a written response that satisfies each condition for the conditional approval or remedies each reason for disapproval provided. Upon receipt of a response, the executive director or designee shall determine whether to approve or disapprove the applicant's previously conditionally approved or disapproved construction plans not later than the 15th day after the date the response was submitted. (c) Upon review and consideration of release for construction of construction plans by engineering division, the plat applicant and/or the plat applicant's contractor will provide written notification to the engineering division of the intent to commence construction of the required infrastructure. No work may be performed unless written notification has been provided to the engineering division. The written notification shall contain the following information: (1) Name of the plat or subdivision; (2) Plat applicant's name; (3) Contractor's name, address and phone number; (4) Type of construction to be performed; and (5) Estimated value of construction. (d) The engineering division shall issue an acknowledgment of receipt of notification to the developer and/or his contractor. (e) Construction plans submitted to the city for review are valid for two (2) years prior to release of a permit. (f) Once a construction permit is issued, the permit is valid for one (1) year. The executive director or designee is authorized to grant one (1) extension for a period of not more than one hundred eighty (180) days. Requests for an extension shall be submitted in writing by the applicant and just cause for the extension must be demonstrated.
(Ord. No. 95-38, § I, 4-25-95; Ord. No. 12-042, § II, 7-24-12; Ord. No. 14-038, (b), 05-13-14; Ord. No. 20-037, § I, 8-18-20; Ord. No. 22-088, § I, 12-6-22; Ord. No. 24-035, § I, 8-20-24)
Ask a question about Killeen law
Corpus searches the Killeen sections it holds and shows the ones that match, with their citations. Free, no sign-in.