§ 26-83 — Acceptance of infrastructure

Code of Ordinances of the City of Killeen, Texas (Supp. No. 38, Update 2: codified through Ordinance of 26-029, enacted August 4, 2026) · Killeen City Code § 26-83

Corpus is an independent public-information project, not the official City of Killeen website. Stable reference: corpuslaw.us/code/545770ea-f7e9-4643-bcea-9933091cd017

Sec. 26-83. - Acceptance of infrastructure.

(a) Upon completion of all required infrastructure, prior to the acceptance of the subdivision by the city for maintenance, the applicant, or applicant's agent, shall provide record (as-built) drawings of all constructed water, wastewater, street, and drainage infrastructure. Also, the applicant, or applicant's agent, shall post, or cause to be posted, a maintenance bond executed by a corporate surety or corporate sureties duly authorized to do business in this state, payable to the city and approved by the city as to form, to guarantee the maintenance of the construction and drainage infrastructure for a period of two (2) years after its completion and acceptance by the city. In cases where the entirety or a portion of a water or sewer main will be placed under a street, if the applicant, or applicant's agent, does not provide full base backfill from the bedding of a water or sewer main to the sub base of the street, a three (3) year maintenance bond shall be required for all water and sewer infrastructure placed under a street. In lieu of a maintenance bond, the applicant may submit either an irrevocable letter of credit payable to the city and approved by the city as to form or a cash bond payable to the city and approved by the city as to form. The actual value of the maintenance bond or letter of credit or cash bond shall be ten (10) percent of the full cost of the water and sewer system and fifteen (15) percent of the full cost of the cost of street and drainage construction, as determined by the actual construction costs. The values enumerated in the bond or letter of credit shall be supported by a construction take-off summarizing the lineal, areal and volumetric quantities, as applicable, for all constructed water, sewer, street, and drainage infrastructure. Whenever a defect or failure of any required improvement occurs within the period of coverage and less than one (1) full year of coverage remains, the city shall require that a new maintenance bond or surety instrument be posted for a period of one (1) full calendar year sufficient to cover the corrected defect or failure. (b) Upon receipt of the approved maintenance bond, irrevocable letter of credit or cash bond, the engineering division shall issue a written letter of acceptance of the infrastructure and notify the building and development services department that the subdivision has been accepted by the city. (c) All infrastructure including, but not limited to water, sewer, streets, transportation, drainage, environmental, and appurtenances shall be inspected by the engineering division prior to acceptance and warranty period.

(Ord. No. 95-38, § I, 4-25-95; Ord. No. 11-061, § II, 7-12-11; Ord. No. 14-038, (a) (c), 05-13-14; Ord. No. 22-088, § I, 12-6-22)