§ 24-16.7 — EXPEDITED PLAN REVIEW

Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Land Development Code § 24-16.7

Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/2b3c5c29-8ca5-41f0-8153-c2c3f0ba4643

Section 24-16.7 - EXPEDITED PLAN REVIEW

(1) Purpose: The purpose of Expedited Plan Review (EPR) is to streamline the administrative processes associated with the issuance of construction permits consistent with code compliance requirements and fiscal accountability, assigning priority review to those general contractors participating in the program. (2) Eligibility: Construction professionals utilizing EPR acknowledge that the processes and procedures outlined herein are the key to successful implementation and agree to strict compliance with these procedures. Utilization of EPR does not abrogate the responsibility of the contractor to provide complete and accurate plans, to utilize licensed and/or bonded subcontractors, or of the city to enforce the requirements of adopted codes. Misrepresentation or fraudulent applications shall void permits and bar contractor participation in the future. General contractors only. (3) Plan Submittals: a. Standardized Pre-filed: Standardized plans may be pre-filed. Plans should be identified by general contractor name, standardized reference identification, and should include elevations, curb cut requests, foundation and framing information, construction valuation, plumbing and electrical wiring details and fixture cost take-offs. Subcontractor information including name, address, bond and license information shall be submitted with standardized plan, or individually with permit applications. No permit may be issued to any general contractor for electrical, plumbing, or HVAC work unless such contractors are duly licensed and/or bonded by the City of Laredo. Permit applications for approved standardized construction projects may be submitted singly or in batch form with individual site plans and exceptions to standardized plans, if any. The application shall include contractor name, signed or initialed by the owner or authorized agent, plan identification, street address and number, legal lot, block and subdivision information, and standardized fee calculation for all fees, including tap, building, plumbing, electrical, HVAC, plan check, curb cut, water availability, meter installation fees, and water deposit (see example). Standardized pre-filed plans for which provisional electrical service is requested shall include an affidavit signed by the general contractor and the electrical contractor acknowledging their agreement with the terms of provisional electrical service, and shall include payment of a re-inspection fee. b. Non-standardized or Customized: Two (2) complete sets of construction drawings shall be submitted to include site plans, curb cut requests, elevations, foundation and framing information, construction valuation, plumbing and electrical wiring details and fixture cost take-offs. Complete subcontractor information including name, address, bond and license information shall be submitted with permit applications. One (1) shall be maintained in the file and one (1) shall be returned to the contractor stamped "Reviewed for Compliance - APPROVED". The application shall include contractor name, signed or initialed by the owner or authorized agent, plan identification, street address and number, legal lot, block and subdivision information, and standardized fee calculation for ALL fees, including tap, building, plumbing, electrical, HVAC, plan check, curb cut, water availability, meter installation fees, and water deposit (see example). Provisional electrical service is not authorized for customized projects. (4) Plan review: a. Standardized Pre-filed: Curbs cut and water/wastewater requests shall be forwarded to the appropriate department by the Plan Review Section. Fee payments for pre-filed plans shall be sent to the Collections Department or deposited directly with the City's depository bank. b. Non-standardized or Customized: Curbs cut and water/wastewater requests shall be forwarded to the appropriate department by the Plan Review Section. Fee payments for customized plans shall be remitted to the Collections Department. Fee adjustments, if any, shall be requested in writing through the Collections Department. (5) Permit Issuance: a. Standardized Pre-filed: A Combined Permit shall be issued electronically or by fax to the general contractor for building, plumbing, electrical and HVAC work using licensed and/or bonded contractors once fee verification is received. Where possible curb cut permits shall be issued simultaneously with the combined permit. No permit may be issued unless water and wastewater service is available to the property or is otherwise approved by the Public Utilities Department, or the Health Department where septic systems are authorized. Meter installation schedules must be coordinated with the Collections Department by the general contractor. b. Non-standardized or Customized: A Combined Permit shall be issued electronically or by fax to the general contractor for building, plumbing, electrical and HVAC work utilizing licensed and/or bonded contractors, once fee verification is received. The Combined permit may be issued with conditions which shall be noted on the plans and on the face of the permit. Where possible curb cut permits shall be issued simultaneously with the combined permit. No permit may be issued unless water and wastewater service is available to the property or is otherwise approved by the Public Utilities Department, or the Health Department where septic systems are authorized. Meter installation schedules must be coordinated with the Collections Department by the general contractor. (6) Inspections: All requests for inspections shall be submitted to the Building Official or his designee by the general contractor not later than the day before inspection is necessary. The general contractor or his agent shall be present during the inspections. A copy of inspection reports shall be delivered in person at the site or by fax to the general contractor who shall be responsible for advising subcontractors of any remedial actions which may be required. A complete set of stamped "approved" plans shall be at the site during inspections. All general contractors shall see that trash and debris is properly contained during construction. Provisional electrical service may be approved by the electrical inspector for a period of time not to exceed thirty (30) days. Provisional service shall be discontinued without notice to any contractor if a Certificate of Occupancy has not been issued before the expiration of the thirty-day period. Certificates of Occupancy and/or final electrical service shall not be authorized at any location which has not been cleared of debris. No re-inspection fees shall be charged, but re-inspection shall not be made earlier than three (3) days following the time of the original inspection. A second occurrence at the same site shall delay re-inspection for an additional five (5) days.

Ask a question about Laredo law

Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.