§ 24-20.4 — ELECTRICAL INSPECTIONS
Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Land Development Code § 24-20.4
Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/89f80671-a36b-420f-b5f2-fd53dd0c75c8
Section 24-20.4 - ELECTRICAL INSPECTIONS
(a) A rough-in inspection is required on all completed wiring systems before the same shall be allowed to be concealed from view. All wiring devices, circuit breaker panels, and all final connection to equipment shall be permanently installed before final inspection and acceptance except the lighting or other fixtures themselves; and separate permits shall be required for any alteration or changes thereafter, provided however, that provisional service may be approved by the electrical inspector for the purpose of testing equipment subject to the following: 1. Commercial Projects. Provisional electrical service for each commercial project may be approved for a period not to exceed thirty (30) days, provided however: a. Electrical service shall be terminated without notice to any contractor following the expiration of the thirty-day period unless a Final Electrical Inspection is issued. b. Where provisional service was granted and subsequently terminated for failure to secure final inspection, an additional inspection shall be required for reconnection. An electrical contractor who has had electrical service terminated for failure to secure Final Inspection on two (2) occasions shall be ineligible to apply for provisional service for a period of not less than six (6) months. c. A request for the extension of provisional service beyond the thirty-day period shall not be granted except in the case where escalators/elevators require testing, special refrigeration problems exist, or where unusual circumstances affect electrical or other subcontractors. The request for extension shall be submitted in writing jointly by the electrical and general contractor, and shall specify the reasons for the request. 2. Residential Projects. Provisional electrical service for each residential project participating in Pre-filed Expedited Plan Review may be approved for a period not to exceed thirty (30) days, provided however: a. Electrical service shall be terminated without notice to any contractor following the expiration of the thirty-day period unless a Final Electrical Inspection is issued. b. Where provisional service was granted and subsequently terminated for failure to secure Final Inspection, an additional inspection shall be required for reconnection. A general contractor who has had electrical service terminated for failure to secure Final Inspection shall be ineligible to continue participation in EPR for a period of not less than six (6) months. c. No extensions of provisional service beyond the thirty-day period shall be granted. 3. Eligibility/Participation. a. Electrical work has been completed in conformance with the National Electrical Code, as it may be amended from time to time, and approved by the Electrical Inspector. b. Service panels have been installed in accordance with the requirements of the electric service provider and the Electrical Inspector. c. The permit includes a re-inspection fee of twenty dollars ($20.00). d. All requests for inspection were called in timely. e. All deficiencies noted by the electrical inspector were corrected. f. All calls for inspection shall be made by the licensed electrical contractor who shall provide his name, license number and the type of inspection requested at the time the call is made. (b) Any person having charge of the construction, alteration, or repair of buildings, who covers or conceals or causes to be concealed or covered, any wiring for which an electrical permit has been issued or required before such wiring has been inspected and approved without having officially notified the office of the Building Official at least twenty-four (24) hours previously (Saturday afternoons and Sundays and Holidays not included), shall be subject to penalties provided in adopted codes, as they may be amended from time to time.
Ask a question about Laredo law
Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.
